HomeMy WebLinkAbout5/2/2018 - STAFF REPORTS - 1D �OF Q A L M SA9 �Z V N k � k NCO T9� OPATFO c fI4<1FORN** City Council Staff Report DATE: May 2, 2018 CONSENT CALENDAR SUBJECT: APPROVAL OF A REQUEST TO EXTEND THE PREVIOUSLY APPROVED EARLY CONSTRUCTION START TIME FOR WORK ACTIVITIES AT THE ANDAZ HOTEL CONSTRUCTION SITE FROM MAY 1, 2018, THROUGH SEPTEMBER 30, 2018. FROM: David H. Ready, City Manager BY: Marcus L. Fuller, Assistant City Manager SUMMARY The City has received a request from SR Construction, the General Contractor responsible for construction of the Andaz Hotel for Rael Development Corporation, for an early construction start time of 4:00 a.m. extending through September 30, 2018. Chapter 8.04.220 of the Palm Springs Municipal Code limits the hours of construction from 7:00 a.m. to 7:00 p.m. Monday thru Friday, unless the construction work complies with the terms of a written early work permit issued by the Building Official upon a showing of sufficient need due to circumstances of an unusual or compelling nature. In this case, the Building Official will be approving an early start to construction in consideration of the need to continue with a high volume of continuous concrete construction for reinforced concrete floors, columns and decks that cannot occur during high ambient heat, and to address exposure of construction workers to high heat during the summer months, subject to continuous monitoring of noise complaints and impacts to adjacent properties and businesses. This request extends the early work permit the Council authorized on September 26, 2017, which ends April 30, 2018. Staff has not received noise complaints related to the on-going early work associated at the Andaz Hotel. RECOMMENDATION: Approve the requested early construction time of 4:00 AM between May 1, 2018, and September 30, 2018, for the Andaz Hotel construction. ITEM NO. _ City Council Staff Report May 2, 2018-- Page 2 Report on Approval of Early Construction Start Time Andaz Hotel BACKGROUND: The Andaz Hotel project located between N. Palm Canyon Drive and Indian Canyon Drive at Alejo Rd. resumed construction in October, 2017 and it is anticipated that the project will be completed by January 2019. As a reinforced concrete structure, consisting of over 15,000 cubic yards of concrete and 2.1 million pounds of reinforcing steel, the Andaz Hotel required several significant concrete pours over the last several months for the approval of early construction start times for nine separate concrete pours that took place between November 2017 and April 2018. On September 26, 2017, the City Council approved a request from SR Construction, the General Contractor, to allow early work during this time frame. The project site and surrounding area are indicated in Figure 1 __..�M— ,ans..,���rl; .��w.�.r.r go �L e, Figure 1 For each of these concrete pours the Contractor began its work at 12:OOam and with completion of concrete placement before 8:OOam. While daytime temperatures are a secondary concern during this period, the primary rational for Council's approval of the early start time was to limit disruption to the downtown core caused by the placement of lane closures and the staging of concrete trucks waiting to offload. Approval of the request for these limited early start times was intended to allow for the removal of any secondary lane closures and equipment prior to the onset of business activities at a time when the influx of seasonal guests and events will be reaching their peak. 02 City Council Staff Report May 2, 2018 -- Page 3 Report on Approval of Early Construction Start Time Andaz Hotel Permitted construction hours per the Palm Springs Municipal Code 8.04.220 are listed in the table below: Permitted Hours of Construction Sundays& Weekdays Saturday Holidays* 7 a.m. to 7 p.m, 8 a.m, to 5 Not permitted p.m. *Thanksgiving Day, Christmas Day, New Years Day, July 4`h, Labor Day and Memorial Day Certain exceptions to these construction hours are allowed in the Municipal Code, including exception (2): (2) Construction work complying with the terms of a written early work permit which may be issued by the building official upon a showing of sufficient need due to circumstances of an unusual or compelling nature; STAFF ANALYSIS: SR Construction has submitted a request to extend the City's approval for an early start of 4:00 A.M. to allow their crews to complete their 9-hour work shift by 1:00 P.M. during the high heat of summer, (see Attachment 1). Given the volume of concrete to be placed, with one concrete truck holding 10 cubic yards, concrete trucks will need to be staged on either Palm Canyon Drive or Indian Canyon Drive in sequence to provide a continuous supply of concrete during this construction schedule. Staging this work during the early morning hours will help to minimize disruption to traffic that otherwise would occur if the normal work hour start of 7:00 AM was maintained. To mitigate the noise associated with these trades S.R. Construction has been implementing measures to lower the volume of back-up alarms and radios, and to minimize construction traffic on adjacent streets on days when continuous concrete pours are not scheduled. As there have not been documented noise complaints with the continuing early construction at the Andaz Hotel site since October 2017, staff recommends the Council approve the request to allow early work to occur through the summer months. 03 City Council Staff Report May 2, 2018— Page 4 Report on Approval of Early Construction Start Time Andaz Hotel ENVIRONMENTAL IMPACT: On April 2, 2014, the City Council adopted Resolution No. 23527, approving an amendment to Case No. 5.1091, Planned Development District 324, and related entitlements associated with the development of a 150 room hotel, and finding that the previously adopted Mitigated Negative Declaration Number 2006109031 as sufficient and appropriate environmental documentation for the proposed amendment to Planned Development District 324. No further environmental analysis is required with this action. FISCAL IMPACT: None. SUBMITTED Marcus L. Fuller, MPA, P.E., P.L.S. David H. Ready, Es Assistant City Manager City Manager Attachment(s): 1. S.R. Construction Request Letter 04 ATTACHMENT 1 05 SR conSTRUCTIon April 24, 2018 MR. MARCUS FULLER, ASSISTANT CITY MANAGER City of Palm Springs 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 RE: ANDAZ—Hyatt Dear Mr. Fuller: As you know SR Construction is commissioned by Palm Springs, LLC to build the Andaz Hotel in your City. We have extremely hot temperatures starting already and through the summer expected to be much worse, and we are requesting permission to move our work hours, where needed, to start at 4am and end at 1pm. This request is made in the interests of the health and safety of our workers which is of prime concern to us, and also because remaining concrete pours need to be made in the cooler times of the day. We ask this permission starting in May and continuing through September when cooler temperatures are expected. We have tried diligently to be good neighbors since starting construction and we will continue to be sensitive to all our neighbors throughout the entire construction process. Your confirmation that these hours are approved will be deeply appreciated. Please do not hesitate to contact me directly should there be questions. CB "regard , hard G. Mulles, PhD Senior Project Manager cc: Billy Avila, Owner's Representative 06 3579 Red Rock Street, Las Vegas, NV 89103 702.877.6111 0/702.258.6326 F NV License 33080A WWW.SRBUILT-USA.COM