HomeMy WebLinkAbout24529 RESOLUTION NO. 24529
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
PALM SPRINGS, CALIFORNIA, APPROVING AN ART
MURAL ON THE EAST ELEVATION OF AN EXISTING
BUILDING AT THE CHURCH OF ST. PAUL IN THE DESERT
LOCATED AT 125 WEST EL ALAMEDA CASE 18-006 MUR.
THE CITY COUNCIL FINDS AND DETERMINES AS FOLLOWS:
A. The Church of St. Paul in the Desert ("Applicant') has filed an application with the
City pursuant to Chapter 5.81 of the Palm Springs Municipal Code (PSMC) for the
approval of an art mural on the east elevation of an existing building located at 125 West
El Alameda, Zone R-2 (Case No. 18-006 MUR) ("Application").
B. On November 29, 2018, the Public Arts Commission considered the application at
a meeting and unanimously voted to recommend approval of the Application by the City
Council.
C. On December 19, 2018, the City Council considered the Application at a regularly
scheduled public meeting in accordance with applicable law.
D. The Application is considered a "project' pursuant to the terms of the California
Environmental Quality Act ("CEQA"), and is exempt from further environmental review
pursuant to Section 15301 ("Existing Facilities") of the CEQA Guidelines.
E. The City Council has carefully reviewed and considered all of the evidence
presented in connection with the Application, including, but not limited to, the staff report,
and all written and oral testimony presented.
F. Pursuant to Section 5.81.060 ("Regulations") of the Palm Springs Municipal Code,
the City Council finds:
a. Any alteration to an approved mural shall require approval in accordance with the
procedures listed in Section 5.81.040.
The proposed art mural is subject to the condition of approval stated in Exhibit A
of the attached Resolution, which requires adherence to this requirement.
b. No part of a mural shall exceed the height of the structure to which it is tiled,
painted, or affixed.
The proposed art mural will be installed on the exterior wall of an existing building.
The design and size of the art mural correspond to the shape and size of the
building elevation, and the top of the art mural will not extend beyond the height of
the structure.
Resolution No. 24529
Page 2
C. No part of a mural shall extend more than six (6) inches from the plane of the wall
upon which it is tiled, painted, or affixed.
The proposed art mural will be hand-painted with Acrylic paint; therefore, it will not
project more than six (6) inches from the face of the building.
d. Unless otherwise authorized by City Council upon making findings of no resulting
impacts, no mural may consist of, or contain, electrical or mechanical components,
or changing images (moving structural elements, flashing or sequential lights,
lighting elements, or other automated methods that result in movement, the
appearance of movement, or change of mural image or message, not including
static illumination turned off and back on not more than once every 24 hours).
The proposed art mural will be hand-painted with Acrylic paint, and it will not
contain any electrical or mechanical components.
e. No mural shall be placed on a lot that is improved with only one single-family
residential structure and accessory structures.
The proposed art mural will be installed on a non-residential property. The art
mural will be installed on the church building q
wall and meet this requirement.
f. No mural shall be arranged and illuminated in a manner that will produce light
intensity of greater than three foot candles above ambient lighting, as measured
at the property line of the nearest residentially zoned property.
The proposed art mural is non-illuminated. The installation location faces the rear
parking lots of the adjacent commercial properties, and the art mural will not affect
any residentially zoned property located within the site's vicinity.
g. Digitally printed image murals shall receive approval of both the Fire Department
and Department of Building and Safety.
The proposed art mural will be hand-painted with Acrylic paint; therefore, it
conforms to this requirement.
h. A mural shall not be created without the final authorization of the Palm Springs City
Council.
The applicant is seeking approval of the proposed art mural. With City Council
approval, the proposed project will meet this requirement.
THE CITY COUNCIL OF THE CITY OF PALM SPRINGS RESOLVES:
Resolution No. 24529
Page 3
That the findings and determinations reflected above are true and correct, and are
incorporated by this reference herein as the cause and foundation for the action taken by
and through this Resolution.
That the City Council hereby approves Case 18-006 MUR for an art mural on the east
elevation of an existing building located at 125 West El Alameda, subject to the conditions
of approval attached herein as Exhibit A.
ADOPTED THIS 19T" DAY OF DECEMBER, 2018.
David H. Ready, EsqW.0.
City Manager
ATTEST:
thony J. eji ,
City Clerk
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF PALM SPRINGS )
I, ANTHONY J. MEJIA, City Clerk of the City of Palm Springs, hereby certify that
Resolution No. is a full, true and correct copy, and was duly adopted at a regular
meeting of the City Council of the City of Palm Springs on the 191h day of December,
2018, by the following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the official seal
of the City of Palm Springs, California, this r?,iby- day of tee,,,,,�
thony J. ejia- C
City Clerk
Resolution No. 24529
Page 5
such claim, action, or proceeding against the City of Palm Springs and the
applicant will either undertake defense of the matter and pay the City's
associated legal costs or will advance funds to pay for defense of the matter by
the City Attorney. If the City of Palm Springs fails to promptly notify the
applicant of any such claim, action or proceeding or fails to cooperate fully in
the defense, the applicant shall not, thereafter, be responsible to defend,
indemnify, or hold harmless the City of Palm Springs. Notwithstanding the
foregoing, the City retains the right to settle or abandon the matter without the
applicant's consent but should it do so, the City shall waive the indemnification
herein, except, the City's decision to settle or abandon a matter following an
adverse judgment or failure to appeal, shall not cause a waiver of the
indemnification rights herein.
ADM 6. Covenant. The owner of the property on which the mural is installed shall
execute and deliver to the Office of the City Clerk a covenant for recordation in
a form approved by the City Attorney. The covenant shall provide that the mural
will be installed and maintained at all times in full compliance Chapter 5.81 of
the Palm Springs Municipal Code. In addition, the covenant shall remain in
force for as long as the mural exists.
ADM 7. Maintenance Plan. The property owner(s) and successors and assignees in
interest shall maintain and repair the mural in accordance with the maintenance
plan approved in conjunction with this application. This condition shall be
included in the recorded covenant agreement for the property as required by
the City.
ADM 8. Grounds for Revocation. Non-compliance with any of the conditions of this
approval or with City codes and ordinances may result in proceedings to revoke
the approval. In addition, violations of the City Codes and Ordinances will result
in enforcement actions which may include citations, arrest, temporary business
closure, or revocation of this permit in accordance with law.
PLANNING DEPARTMENT CONDITIONS
PLN 1. Lighting. There shall be no Illumination of the mural.
PLN 2. Removal of Mural. Should the mural be removed or the building be repainted
in the future, the property owner shall submit a Minor Architectural Review
application for approval prior to repainting the building.
PLN 3. Any alteration to the approved art mural shall be reviewed and approved in
accordance with Palm Springs Municipal Code Section 5.81.060(a).
END OF CONDITIONS
Resolution No. 24529
Page 4
EXHIBIT A
Case 18-006 MUR
"Cast Your Bread Upon the Waters" Art Mural
The Church of St. Paul in the Desert
125 West El Alameda
December 19, 2018
CONDITIONS OF APPROVAL
Before final acceptance of the project, all conditions listed below shall be completed to the
satisfaction of the Director of Planning Services, the Director of Building and Safety, or the
Director of Community and Economic Development, depending on which department
recommended the condition.
Any agreements, easements or covenants required to be entered into shall be in a form
approved by the City Attorney.
ADMINISTRATIVE CONDITIONS
ADM 1. Project Description. This approval is for the project described per Case 18-006
MUR, except as modified by the conditions below.
ADM 2. Reference Documents. The site shall be developed and maintained in
accordance with the approved plans, date stamped October 30, 2018 on file in
the Department of Planning Services, except as modified by the conditions
below.
ADM 3. Conform to all Codes and Regulations. The project shall conform to the
conditions contained herein, all applicable regulations of the Palm Springs
Zoning Ordinance, Municipal Code, and any other City County, State and
Federal Codes, ordinances, resolutions and laws that may apply.
ADM 4. Minor Deviations. The Director of Planning or designee may approve minor
deviations to the project description and approved plans in accordance with the
provisions of the Palm Springs Zoning Code.
ADM 5. Indemnification. The owner shall defend, indemnify, and hold harmless the City
of Palm Springs, its agents, officers, and employees from any claim, action, or
proceeding against the City of Palm Springs or its agents, officers or employees
to attach, set aside, void or annul, an approval of the City of Palm Springs, its
legislative body, advisory agencies, or administrative officers concerning Case
18-006 MUR. The City of Palm Springs will promptly notify the applicant of any
Resolution No. 24529
Page 4
EXHIBIT A
Case 18-006 MUR
"Cast Your Bread Upon the Waters" Art Mural
The Church of St. Paul in the Desert
125 West El Alameda
December 19, 2018
CONDITIONS OF APPROVAL
Before final acceptance of the project, all conditions listed below shall be completed to the
satisfaction of the Director of Planning Services, the Director of Building and Safety, or the
Director of Community and Economic Development, depending on which department
recommended the condition.
Any agreements, easements or covenants required to be entered into shall be in a form
approved by the City Attorney.
ADMINISTRATIVE CONDITIONS
ADM 1. Project Description. This approval is for the project described per Case 18-006
MUR, except as modified by the conditions below.
ADM 2. Reference Documents. The site shall be developed and maintained in
accordance with the approved plans, date stamped October 30, 2018 on file in
the Department of Planning Services, except as modified by the conditions
below.
ADM 3. Conform to all Codes and Regulations. The project shall conform to the
conditions contained herein, all applicable regulations of the Palm Springs
Zoning Ordinance, Municipal Code, and any other City County, State and
Federal Codes, ordinances, resolutions and laws that may apply.
ADM 4. Minor Deviations. The Director of Planning or designee may approve minor
deviations to the project description and approved plans in accordance with the
provisions of the Palm Springs Zoning Code.
ADM 5. Indemnification. The owner shall defend, indemnify, and hold harmless the City
of Palm Springs, its agents, officers, and employees from any claim, action, or
proceeding against the City of Palm Springs or its agents, officers or employees
to attach, set aside, void or annul, an approval of the City of Palm Springs, its
legislative body, advisory agencies, or administrative officers concerning Case
18-006 MUR. The City of Palm Springs will promptly notify the applicant of any
Resolution No. 24529
Page 5
such claim, action, or proceeding against the City of Palm Springs and the
applicant will either undertake defense of the matter and pay the City's
associated legal costs or will advance funds to pay for defense of the matter by
the City Attorney. If the City of Palm Springs fails to promptly notify the
applicant of any such claim, action or proceeding or fails to cooperate fully in
the defense, the applicant shall not, thereafter, be responsible to defend,
indemnify, or hold harmless the City of Palm Springs. Notwithstanding the
foregoing, the City retains the right to settle or abandon the matter without the
applicant's consent but should it do so, the City shall waive the indemnification
herein, except, the City's decision to settle or abandon a matter following an
adverse judgment or failure to appeal, shall not cause a waiver of the
indemnification rights herein.
ADM 6. Covenant. The owner of the property on which the mural is installed shall
execute and deliver to the Office of the City Clerk a covenant for recordation in
a form approved by the City Attorney. The covenant shall provide that the mural
will be installed and maintained at all times in full compliance Chapter 5.81 of
the Palm Springs Municipal Code. In addition, the covenant shall remain in
force for as long as the mural exists.
ADM 7. Maintenance Plan. The property owner(s) and successors and assignees in
interest shall maintain and repair the mural in accordance with the maintenance
plan approved in conjunction with this application. This condition shall be
included in the recorded covenant agreement for the property as required by
the City.
ADM 8. Grounds for Revocation. Non-compliance with any of the conditions of this
approval or with City codes and ordinances may result in proceedings to revoke
the approval. In addition, violations of the City Codes and Ordinances will result
in enforcement actions which may include citations, arrest, temporary business
closure, or revocation of this permit in accordance with law.
PLANNING DEPARTMENT CONDITIONS
PLN 1. Li htin . There shall be no Illumination of the mural.
PLN 2. Removal of Mural. Should the mural be removed or the building be repainted
in the future, the property owner shall submit a Minor Architectural Review
application for approval prior to repainting the building.
PLN 3. Any alteration to the approved art mural shall be reviewed and approved in
accordance with Palm Springs Municipal Code Section 5.81.060(a).
END OF CONDITIONS