HomeMy WebLinkAbout10/9/2019 - AGREEMENTS t
QALms CITY OF PALM SPRINGS
CONTRACT CHANGE ORDER
To: Western Surety Company Date: 10-8-19
151 North Franklin Street, 17t' Floor Project No: CP 15-05
Chicago, II 60606 Project: Palm Springs Police
(951) 788-0703 Dept. Remodel Rebid
Change Order No: 23T
Attn: Richard Tropp (Benchmark Consulting
Services, LLC).
CHANGES IN CONTRACT:
1. Furnish and install labor and material for 140 s.y. of carpet tiles for Project 200 Records Staff Office.
2. Furnish and install labor and material for 80 s.y. of carpet tiles for Project 200 corridor, copy area and
vestibule.
3. Furnish and install 15 s.y. of carpet tiles, material only for Project 200 Records Supervisor and
Lieutenants Offices.
4. Furnish and install 200 U. of floor base and provide labor and material for floor preparation as required.
CHANGES IN COST: Total Net Change Order Amount: $9,814.93
REASONS FOR CHANGE:
Requested by the Police Department to install new carpet tiles and base in lieu of specified work. The areas
shown above did' not include new carpet tiles in the contract documents. The scope of work required the
contractor to remove and reuse existing carpet tiles and called for using existing stock material located at the
Department for the Supervisor and Lieutenants Offices. The existing carpet was in poor condition and existing
stock material was insufficient to cover all areas.
CHANGES TO CONTRACT TIME:
No days will be added to the contract for the work indicated herein.
SOURCE OF FUNDS: 261-1395-59444
i
Contract Change Order No. 23T
DATE: 10-8-19
Page 2
SUMMARY OF COSTS:
Council Approved Amount: $3,381,830.00 Original Completion Date: 184 Calendar Day
Previous Change Orders $993,399.05 Previous Days Added 0
This Change Order: $9,814.93 Days Added 0
Revised Contract Amount: $4,385,043.98 Revised Completion 11-1-19
[SIGNATURES ON NEXT PAGE]
1
Contract Change Order No. 23T
DATE: 10-8-19
Page 3
1 have received a copy of this Change �der and the above AGREED PRICES are acceptable to
Western Suretv Corng)anv
�igrlatuVe Date
Printed Name and Title
City of Palm Springs
Recommended Bv: 16 /7
'),os6ph Putrino/Senior Public Works Date
Inspector, Willdan Engineering
Recommended Bv: v It
cLuTs Fuller,-AWstant City Manager/ Date
City Engineer
Approved Bv:
d David H. 49 , City Manager date
Attest Bv: 10
ony Meji i Cl iFk Date
Distribution:
Original Conformed Copy: Conformed - File Copy:
Contractor Engineering Pay File (1) APPROVED ByCrly COUNCIL
City Clerk Project City File
Purchasing
Finance
E5T 1896
KEMP PROS Change Order Request
CONSTRUCTION
Project: City of Palm Springs-Police Department Remodel COR: 008.2-T
9 27 2019
9 30 2019
KBCI No.: 39001 Date: 10 3 2019
Description: Furnish and install carpet as follows:
Records 140 yards,Corridor/Anti Room/Break Room 80.yards,Records Supervisor/Lieutenants 15 yards(material only),
Base 300 lineal feet.
Exclusions:
Subcontractor:
(See attached Sub Cost Proposal) AMOUNT
Southland(Carpet Material) $ 5,640.00
Southland(Carpet Labor) $ 2,310.00
Southland(Floor Prep) $ 1,575.00
Southland(Base Material) $ 300.00
Southland(Base Labor) $ 450.00
Southland(COR 006 Floor Prep) $ 980.00
Contract Scope G:2a�r"i �, r'L^'� 4e= 1� ,tip; �; sc_��C,SIS,i �Clt:% ,`` r $ (2,000.00)
V $ -
OHP 5% $ 462.75
Direct Labor Costs:
NAME HOURS RATE AMOUNT
Project Manager $ 122 $
Superintendent $ 107 $ -
Project Engineer $ 96 $
BIM/Project Documentation $ 78 $
OHP 18% $ -
Direct Materials,Equipment&Other Costs:
ITEM QTY UNIT RATE AMOUNT
$ - t
OHP 10% $ -
Cost Recap: AMOUNT
Direct Labor,Materials,Equipment&Other Costs $ -
Work Performed by Subcontractor(s) $ 9,717.75
Bond 1% $ 97.18
TOTAL COR VALUE: $ 9,814.93
I
i
From: Loni Zuschlag<LZuschlag@kempbros.com>
Sent: Monday,September 30,2019 4:07 PM
To:Joseph Putrino<JPutrino@willdan.com>
Cc: Richard W Tropp<rtropp@benchmark-consultina.com>;Joe Lara<ilara@kempbros.com>
Subject: RE: PSPD-COR 008-T
Hi Joe,
Please see the revised COR 008.1-T for the additional carpeting, less a credit for the base bid scope.
Thank you _ '
J /
Loni ,
From:Loni Zuschlag
Sent: Friday,September 27, 2019 9:47 AM
To:Joseph Putrino<JPutrino@willdan.com>
Cc: Richard W Tropp<rtropp benchmark-consulting.com>;Joe Lara<jlara@kempbros.com>
Subject: PSPD-COR 008-T
Good Morning Joe,
Please see the attached COR 008—T for the additional carpeting.
Thank you,
�N�s_PF_ c Loni Zuschlag, Project h7anager/E5timator
q '�,� 7 56[.?35_5000 Till:5 Gc.:c•;.:•:i•o CTC
m
F' ;G2?3G.SG'.fi rjntaF:5pr:rq-y
C 562.355AS76 Cah:orma?0670
I
I
l
I
1
:
t
3
Joseph Putrino
From: Joe Lara <jlara@kempbros.com>
Sent: Thursday,October 3, 2019 1:18 PM
To: Joseph Putrino
Cc: Richard W Tropp;Adrian Gonzales; Loni Zuschlag
Subject: RE: PSPD-COR 008-T
I incorrectly labeled one of the line items under CHANGE. It is revised and identified with ***Revised*** at the
end.
Thank you,
�s°F ExcF�(,, Joe Lara,Area Superintendent
�o \��'•, T 562.236.5000 10 13 5 Geary Avenue
F 562.326.SD10 Santa Fe Springs
C 562.320.9698 California 90670
s ^:vv,.ke.,npbros.com
From:Joe Lara
Sent:Thursday, October 3,2019 1:07 PM
To:Joseph Putrino<1Putrino@willdan.com>
Cc: Richard W Tropp<rtropp@benchmark-consulting_com>;Adrian Gonzales<Agonzales@kempbros.com>; Loni
Zuschlag<LZuschlag@kempbros.com>
Subject:RE: PSPD-COR 008-T
JOe,
i
In response to our phone conversation, I went back and looked at the drawings and the yardage you are
coming up with is still pretty short and doesn't align with what myself of Southland got when we measured,
our dimensions also coincide with the dimensions you get when you scale the plans. I do however agree that
the 320 yards is partially contractually owed. The break down per plan and what I dimensioned is as follows.
CHANGE
Records 140 yards ma_terlal a_nd labo j
Corridor, Anti Room, Vestibule and portion of break room 80 yards material and labor
Records Supervisor and Lieutenants office]5 yards material only, Revised
Base '0b LF material and lab'orr,� i
Carpet Material's 235yards = $5640.00
1
Carpet Labor = $23110.00
Floor Prep to Install (Tile demo at corridor/break room) $1575.00
Base materials 300 LF = $300
Base Install 300 LF = $450
{10,275;00
Not included on COR 008.1-T is the floor prep needed to fill in the abandoned cores in the floor which the
architect directed us to fill in an RFI. That COR is attached CO#6 for $980
CONTRACT
Filing room :50 yards labor andj;materal owed, �� _
Records Supervisor and Lieutenants Office i1"5 ,yards labor and material;owed i
Report Writing Room 15 yards;labor owed f `
Carpet Material's 80 yards = $1920
Carpet Labor 95hours = $997.5
Base materials 200 LF = $200
Base Install 200 LF = $300
Trip Charge = $550�\
i
Totals
Totaling all those yards up it equals 315 yard with 5 extra yards unaccounted for.
Let me know if you agree with these totals and I will have the COR redone and re-submitted to you.
Thank you,
�FSOF Joe Lara,Area Superintendent
T 562.2;6.S000 10135 Gear;/Avenue
F 562.326.5010 Sawa Fe Springs
C 562.320.9698 California 90670
� .:•n•:.kemp�ros.Corn
2
EST 1896
M�' BR.OS Change Order Request
CONSTRUCTION
i
Project: City of Palm Springs-Police Department Remodel COR: 008.1-T
9 27 2019
KBCI No.: 39001 Date: 9 30 2019
Description: Furnish and install additional carpettile.
Exclusions:
Subcontractor:
(See attached Sub Cost Proposal) AMOUNT
Southland Flooring
$ 14,415.00
Credit for base bid scope $ (1,800.00)
$ -
OHP 5%1 630.75
Direct Labor Costs:
NAME HOURS RATE AMOUNT
Project Manager $ 122 $
Superintendent $ 107 $ -
Project Engineer $ 96 $
BIM/Project Documentation $ 78 $
OHP 18% $ -
Direct Materials, Equipment&Other Costs:
CITY UNIT RATE AMOUNT
ITEM
$
OHP 10% $ -
Cost Recap: AMOUNT
Direct Labor,Materials,Equipment&Other Costs $ -
Work Performed by Subcontractor(s) $ 13,245.75
Bond 1% $ 132.46
TOTAL COR VALUE: $ 13,378.21
Ck!_
r ,
1 ,
Date: Change Order
6/25/2019 SOUTH LAN D FLOORING g
To: Request
Suite
E
RALPH RODRIGUEZ S Red Hill Ave 3075
Suite
CustonterPO: Tustin, CA 92780 Job No: 1901
CONTRACT Phone 714-937-5396 Fax 714-937-5249 Request#: 5
CO#: 0
,Invoice To: Job Name.
KEMP BROS. CITY OF PALM SPRINGS POLICE DEPT.
10135 GEARY AVENUE 200 S.CIVIC DRIVE
SANTA FE SPRINGS,CA 90670 PALM SPRINGS,CA
RALPH RODRIGUEZ
Phone:
Cell:
Pager:
Fax:
i
From: jProject Manager: stirs:ator:
Dave Jaramillo
Description of Change Order Request:
ADDTIONAL CARPET TILE
ADDTIONAL CARPET TILE
ADD
MANUFACTURER: STYLE:
COLOR NAME: 1COLOR NUMBER: UOM. QUANTITY UNIT PRICE. TOTAL PRICE:
1 MAN*aNGTON TSN CARPET TILE,ADITESIVE AND TAXES(320 SY)-
SOUTI-ILAND FLOORING INC ] EACH
] EACH SY 320.00 24.000 7,680.00
2 LABOR TO INSTALL CARPET TILE INCLUDING PREVAILING WAGE(320 SY)-
SOUTHLAND FLOORING INC 1 EACH
I EACH SY 320.00 10.500 3,360.00
3 FLOOR PREP REQUIRED TO INSTALL(15 EA)-
SOUTHLAND FLOORING INC ] EACH
1 EACH EA 15.00 105.000 1,575.00
4 BURKE BLACK BROWN WALL BASE INCLUDEING TAXES AND ADHESIVE(500 LF)-
SOUTHLAND FLOORING INC 1 EACH
I EACH LF 500.00 1.000 500.00
5 LABOR TO INSTALL WALL BASE IBCLUDING PREVAILING WAGES(500 LF)-
SOUTHLAND FLOORING INC 1 EACH
]EACH LF 500.00 1500 750.00
6 TRIP CHARGE(I EA)-
SOUTHLAND FLOORING INC 1 EACH
]EACH EA 1.00 550.000 550.00
Total ADD $14,415.00
58,602.64
Total
GThis Option-Tax Included : $14,415.00