HomeMy WebLinkAboutA7214 - CHANGE ORDER NO. 1 WITH ELECNOR BELCO ELECTRIC, INC. FOR SIGNALS AT MIRALESTE / VIA ESCUELA AT STATE ROUTE 11 ���.4ppthl'SQg� Ni CITY OF PALM SPRINGS : CONTRACT CHANGE ORDER cy</FORN�P To: Elecnor Belco Electric, Inc. Date: April 21, 2020 14320 Albers Way Project No: 17-08 Chino, CA 91710 Project: Signals- MiralesteNia Escuela at State Route 111 P (909)993-5470 Change Order No: 01 F (909)993-5476 Purchase Order: 19-0989 CHANGES IN WORK: This is a final/balancing change order. Changes indicate the differences in the actual construction quantities necessary to complete the project. Contract Ouantity Adjustments Bid BID SCHEDULE A-S111111MIRALESTE Unit Adjustment Adjusted Item Item Description Price Unit Quantity Amount 4 _ Construct Hot Mix Asphalt _V $296.00 TON 3 $888_00__ 5 -Construct4"Crushed Misc..Base__ __$251_00 _CY _ -9 _ _-$2,259.00 Construct 6"Curb and Gutter CalTrans Std. _6_ Plan A87A, 62-6 _$_92.00 LF 87_ $8,004.00 �8 Construct 4_Thick PCC Sidewalk $17.10 _SF_ _ 7 ^_=$119.70_ Construct Curb Transition P.S.Std.200 9 _(D2) $69.00 LF _ -1___ _-$69.00 _ 10 _.Grind Existing Aspha _It Pavement 1.5" _ $6.00 _SF 218 _$1,308.00 Remove and dispose Existing Curb& 11 -Gutter _ _ _$21.00 LF _ 7 _ _ $1_47.00 12_ Remove and_Dispose Existing Curb Ramp _ $14_00_ SF__=17.5 _-$98.00 _ 13 Remove and Dispose Existing-Concrete _ $14.00 SF 113.25 _ $1,585.50_ _14__Remove and Dispose_Asphalt and Base $11.00 SF_ 180 _-$1,980.00 Remove and Dispose Existing Cross-Gutter 15 &Spandrel _ _ _ _ $14.00 _ SF _-189.5 -$2,653.00 20 _Remove and Replace Concrete Splash Pad___$14.00 SF _ 10 _$140.00 22 Construct 6"PCC Curb Per Curb Detail $69.00 LF -16 -$1,104.00 Construct Curb Ramp Std. Plan A88A, 23 _ Case C $6,828.00 _EA -1 _$6,828.00 24_ Construct 6"PCC Curb Per Curb Detail $69.00 LF 110 -$7,590.00 25 _Qonstruct Retaining Curb Per_Detail $21.00_ LF _ 50 _$1,050.00 Construct 8'Wide Cross Gutter P.S. Std. 26 200 (D2) $17_10 SF -189.5_ -$3,240.45_ _27 __Construct Cobblestone Surface Per Detail �$63.00 SF _ -130 $890,1 .00 31 Field Orders $25,000.00 AL $1,860.61 -$23,139.39 Subtotal -44,295.04 Contract Change Order No. 01 April 21, 2020 Page 2 Bid BID SCHEDULE B-SR111Nia Escuela Unit Current To Date Item Item Description Price Unit Quantity Amount 4 Construct Hot Mix Asphalt _ $177.00 TON _-14.11__ -$2,4_97.47 5 -9onstruct4"Crushed Misc. Base _ $160.00_ CY _ -70 !$11,200.00 Construct 6"Curb and Gutter CalTrans Std. 6 Plan A87A, B2-6 _ $52.00 LF__ 54_ $2,808.00 8 Construct 4"Thick PCC Sidewalk _ $10_25_ SF 406.5 _$4.166.63_ _9 _ Construct 6'Wide Cross-Gutter _ $17.20 _SF _ -848.75 _ -$14,5_98.50 _ 10 _Grind Existing Asphalt Pavement 1_5� $1.10 _SF __1.461.25__ -$1,607.38 Remove and dispose Existing Curb& 11 Gutter $21.00 _ LF_ _ 95 $1,995.00 12 Remove and Dispose Existing Curb Ramp_ $9.10 _SF_ -25 __ -$227.50 13 Remove and Dispose Existing Concrete $9.10 SF -226.25 -$2,058.88 14 Remove and Dispose Asphalt and Base _ _$5.N SF -2.131 ^$12,359.80 Remove and Dispose Existing Cross-Gutter 15 &Spandrel _ $5.80 SF _ -1,212.75 _-$7,033.95 Adjust Water Valve to Grade Per DWA Std. v 16 W111 _ $911.00 EA -2 -41,822.00 17 Construct Cross Gutter 2'Wide $2_9.00 SF _ 21 ^ _$609.00 Construct Driveway Approach Riverside 18 Std.207 _ -__--_ �$17.10_ SF _ 10__ $171.00 Construct 6"Curb and Gutter P.S.Std.200_ 19 (A_3) _ _ _ __ $143.00 LF_ -1____ -$1_43.00_ 22 ._ Construct Rolled Curb P.S. Sid.202 $80.00 LF `-5 ^-$400.00 Construct Rolled Curb Transition P.S.Std. 23 209 $80.00 LF__ -10 $800.00 Construct Trench and Pavement 24 Replacement____ $86.00 LF -91 _$7,826.00 25 Construct 6" PCC Curb Per Curb Detail_ _$44.00 LF__ -7 -$308.00 26(a)_ Construct Retaining Curb Per Detail _`$21.00 LF _ �-5 _ -$105.00 27 Adjust Sewer Manhole to Grade Std.402 $46.00 EA_ -1 -$_2,845.00 28 Construct Cobblestone Surface Per Detail _ $46.00 _SF _ -290 -$13,340.00 32 Field Orders -$25,000.00 LS 1 -$25,000.00 Subtotal -94,422.85 Total Change Order Amount: -$138.717.89 SUMMARY OF COSTS: Original Contract Amount $1,174,261.18 This Change Order $ -138,717.89 Previous Change Order(s) $ 0.00 Revised Contract Amount $1,035,543.29 Contract Change Order No. 01 April 21, 2020 Page 3 I have received a copy of this Change Order and the above terms and AGREED PRICES are acceptable Elecnor Belco Electric, Inc. 2 re � 4/28/20 Signature Date Albeto Garcia, President/CEO I Printed Name and Title �p Pl(n terw� ns �L IL Z Siqnature D to % k-%4tA G l L.to . Printed Name and Titlel City of Palm Springs Recommended By: I ?1D Marcus Fuller, City Engineer Date Approved By: David H. Ready, Cit ger ate Attest By: bS� 20 Zo Anthon)Of " Ci C ate Distribution: Original Conformed Copy: Conformed-File Copy: APPROvED BYCrlY COUNCIL Contractor (1) Engineering Pay File (1) /T 21 G �� Citv Clerk (1) City Project File (1) Purchasinq (1) Finance (1) r