HomeMy WebLinkAboutA7204 - CONTRACT CHANGE ORDER NO. 2 WITH ELECNOR BELCO ELECTRIC, INC. FOR CP #17-08, INDIAN CANYON DRIVE TWO-WAY CONVERSION PEDESTRIAN SAFE LMsp� CITY OF PALM SPRINGS 1! CONTRACT CHANGE ORDER CqR/FONH�P To: Elecnor Belco Electric, Inc. April 10, 2020 14320 Albers Way Project No: 17-08 Chino, CA 91710 Project: Indian Canyon Two-Way Conversion and Pedestrian and Bicycle Safety Enhancements P (909)993-5470 Change Order No: 02 F (909)993-5476 Purchase Order: 19-0935 Account: 134-4497-50339 Attn: Olivia Chea 134-4497-50349 134-4498-59507 142-4299-65243 CHANGES IN WORK: Contract Quantity Adjustments This change order provides for contract quantity adjustments for the Base Bid as indicated below. Item Item Description Quantity Unit Price Total No. 6 Remove& Dispose Existing Pavement& Base Material +4,307.50 $8.00/SF $34,460.00 SF 7 Remove& Dispose Existing Curb and Gutter +492 LF $31.00/LF $15,252.00 8 Remove& Dispose Existing PCC Improvements +7,906 SF $5.00/SF $39,530.00 10 Remove Existing Median Curb -6 LF $24.00/LF ($144.00) 14 Remove Existing Median Landscaping, Hardscape and -160 SF $11.00/SF ($1,760.00) Irri ation 15 Remove Existing Pavers +78 SF $7.00/SF $546.00 16 Adjust Existing Water Valve to Grade -2 EA $1,059.00/EA ($2,118.00) 19 Construct Class II Aggregate Base +21 CY $253.00/CY $5,313.00 20 Grind Pavement +6,7S7F8.25 $5.00/SF $33,891.25 21 Uniform Micro-Milling ''Y4"of Existing Asphalt Concrete Pavement 495,466 SF $0.20/SF ($99,093.20) 22 Crack-Sealing and Crack-Filling, RPMS -42,875 SF $0.37/SF ($15,863.75) 23 Asphalt Concrete-At Unit Bid Price +67.75 $323.00/Ton $21,883.25 23a Asphalt Concrete-Adjusted Unit Price on Overage +264.48 Ton $290.70/Ton $76,884.34 24 Construct 4"Thick Sidewalk +2 SF 05 $9.00/SF $22,365.45 25 Construct Sidewalk(Red Tone Concrete) +2, 2 28 $13.00/SF $28,889.64 SF 26 Construct Sidewalk(Earth Tone Concrete) +173 SF $29.00/SF $5,017.00 27 Construct Sidewalk(16x16 Earth Tone) -100 SF $41.00/SF ($4,100.00) 28 Construct Sidewalk(Multi-Color& Multi-Shape Pavers) -133 SF $47.00/SF ($6,251.00) 29 Construct 6" Curb &Gutter +82 LF $47.00/LF $3,854.00 30 Construct 8" Curb & Gutter +69 LF $47.00/LF $3,243.00 Contract Change Order No. 02 April 10, 2020 Page 2 31 Construct 12" Curb and Gutter -8 LF $47.00/LF ($376.00) 32 Construct Variable Height Curb and Gutter +52 LF $47.00/LF $2,444.00 33 Construct Retaining Curb +92 LF $47.00/LF $4,324.00 34 Construct Cross Gutter and/or Spandrel +164 SF $26.00/SF $4,264.00 35 Construct Curb Ramp per City Std. Drawing 212-At Unit +$348.25 $41.00/SF $14,278.25 Bid Price 35a Construct Curb Ramp per City Std. Drawing 212-Adjusted +1409.14 SF $36.90/SF $51,997.27 Unit Price on Overage 36 Construct Curb Ramp per City Std. Drawing 213 +287.78 SF $41.00/SF $11,798.98 37 Construct Curb Ramp per City Std. Drawing 214 +124.50 SF $41.00/SF $5,104.50 40 Construct Curb Ramp per City Std. Drawing 214 (Earth Tone) 1,380 SF $41.00/SF ($56,580.00) 41 Construct Curb Ramp per City Std. Drawing 214 (Red +20.5 SF $53.00/SF $1,086.50 Tone 42 Construct Curb Ramp per City Std. Drawing 212 (12x12 -560 SF $53.00/SF Red Tone Pavers) ($29,680.00) 43 Construct Curb Ramp per City Std. Drawing 212 (Multi-Color) +101:.75 SF $53.00/SF $5,392.75 44 Install Multi-Color Pavers +52 SF $82.00/SF $4,264.00 45 Construct Red Tone Concrete Pavement -8.5 SF $35.00/SF ($297.50) 46 Install Concrete Street Pavers -87 SF $47.00/SF ($4,089.00) 47 Install Hub Pipe -79 LF $276.00/LF ($21,804.00) 48 Install Handrail -14 LF $206.00/LF ($2,884.00) 49 Remove Existing Curb +27 LF $24.00/LF $648.00 50 Install Traffic Bollards -8 EA $2,941.00/EA ($23,528.00) 51 Install Nuisance Water Drain +1 EA $7,646.00/EA $7,646.00 55 j Install Rectangular Gray Stepping Pavers +48 SF $24.00/SF $1,152.00 57 Construct Curb Ramp per City Std Drawing 212 -At Unit +32/SF $41.00/SF $1,312.00 Bid Price 57a Construct Curb Ramp per City Std Drawing 212-Adjusted +2082.84 SF $36.90/SF $76,856.80 Unit Price on Overage 59 Relocate Existing Sign to New Location-Per Plan +3 EA $294.00/EA $882.00 61 Paint 6" Dashed White Lane Line Ext. Per Caltrans A20A +788 LF $1.00/LF $788.00 64 Thermoplastic 5" Solid White Line +865 LF $1.00/LF $865.00 66 Thermoplastic 6"/6" Double Yellow Stripe +4,222 LF $2.00/LF $8,444.00 67 Thermoplastic 6"White Solid Line +1.91 LF $1.00/LF $191.00 69 Thermoplastic Two-Way Left Turn, Left Turn Lane +310 LF $4.00/LF $1,240.00 93 Field Orders - 1 LS $100,000/LS ($100,000.00) Total Change Order Amount $127,539.53 Contract Change Order No. 02 April 10, 2020 Page 3 CHANGES TO CONTRACT TIME: Zero (0)working days are being added as a result of this change order. SOURCE OF FUNDS: Funds are available from the following account(s): 134-4497-50339 134-4497-50349 134-4498-59507 142-4299-65243 SUMMARY OF COSTS: Original Contract Amount: $4,464,857.00 Original Completion 170 Working Days This Change Order Amount: $127,539.53 Days Added 0 Days Previous Change Order Amounts: $202,871.42 Previous Days Added 0 Days Revised Contract Amount: $4,795,267.95 Revised Completion 170 Working Days Field Order Authorized Amount: $150,000.00 This Field Order: $100,000.00 Remaining Field Order Amount: $ 50,000.00 [SIGNATURES ON NEXT PAGE] air Contract Change Order No. 02 April 10, 2020 Page 4 I have received a copy of this Change Order and the above AGREED PRICES are acceptable to Contractor Elecnor Belco Electric, Inc. 4122/20 Signature Date Alberto Garcia President/CEO P 'nted Na ;nd Title Interwest Consulting Group 'f �y /SiaDdture Date L�f.G.d�,yh rJ Printed Name and Title City of Palm Springs r Recommended By: I ALL 5 -�ILG Marcu Fuller ity Engineer Date Approved By: H. Ready, City Man Date Attest By: Q nthony Mejia City erk v Date Distribution: Original Conformed Copy: Conformed-File Copy: APPROVED BY CITY COUNCIL Contractor (1) Engineering Pay File (1) 2 �` 1- City Clerk (1) City Project File (1) •tom' Purchasjnq (1) Finance (1)