HomeMy WebLinkAboutA7204 - CONTRACT CHANGE ORDER NO. 2 WITH ELECNOR BELCO ELECTRIC, INC. FOR CP #17-08, INDIAN CANYON DRIVE TWO-WAY CONVERSION PEDESTRIAN SAFE LMsp� CITY OF PALM SPRINGS
1! CONTRACT CHANGE ORDER
CqR/FONH�P
To: Elecnor Belco Electric, Inc. April 10, 2020
14320 Albers Way Project No: 17-08
Chino, CA 91710 Project: Indian Canyon Two-Way Conversion and
Pedestrian and Bicycle Safety Enhancements
P (909)993-5470 Change Order No: 02
F (909)993-5476 Purchase Order: 19-0935
Account: 134-4497-50339
Attn: Olivia Chea 134-4497-50349
134-4498-59507
142-4299-65243
CHANGES IN WORK:
Contract Quantity Adjustments
This change order provides for contract quantity adjustments for the Base Bid as indicated below.
Item Item Description Quantity Unit Price Total
No.
6 Remove& Dispose Existing Pavement& Base Material +4,307.50 $8.00/SF $34,460.00
SF
7 Remove& Dispose Existing Curb and Gutter +492 LF $31.00/LF $15,252.00
8 Remove& Dispose Existing PCC Improvements +7,906 SF $5.00/SF $39,530.00
10 Remove Existing Median Curb -6 LF $24.00/LF ($144.00)
14 Remove Existing Median Landscaping, Hardscape and -160 SF $11.00/SF ($1,760.00)
Irri ation
15 Remove Existing Pavers +78 SF $7.00/SF $546.00
16 Adjust Existing Water Valve to Grade -2 EA $1,059.00/EA ($2,118.00)
19 Construct Class II Aggregate Base +21 CY $253.00/CY $5,313.00
20 Grind Pavement +6,7S7F8.25 $5.00/SF $33,891.25
21 Uniform Micro-Milling ''Y4"of Existing Asphalt Concrete Pavement 495,466 SF $0.20/SF ($99,093.20)
22 Crack-Sealing and Crack-Filling, RPMS -42,875 SF $0.37/SF ($15,863.75)
23 Asphalt Concrete-At Unit Bid Price +67.75 $323.00/Ton $21,883.25
23a Asphalt Concrete-Adjusted Unit Price on Overage +264.48 Ton $290.70/Ton $76,884.34
24 Construct 4"Thick Sidewalk +2 SF 05 $9.00/SF $22,365.45
25 Construct Sidewalk(Red Tone Concrete) +2, 2 28 $13.00/SF $28,889.64
SF
26 Construct Sidewalk(Earth Tone Concrete) +173 SF $29.00/SF $5,017.00
27 Construct Sidewalk(16x16 Earth Tone) -100 SF $41.00/SF ($4,100.00)
28 Construct Sidewalk(Multi-Color& Multi-Shape Pavers) -133 SF $47.00/SF ($6,251.00)
29 Construct 6" Curb &Gutter +82 LF $47.00/LF $3,854.00
30 Construct 8" Curb & Gutter +69 LF $47.00/LF $3,243.00
Contract Change Order No. 02
April 10, 2020
Page 2
31 Construct 12" Curb and Gutter -8 LF $47.00/LF ($376.00)
32 Construct Variable Height Curb and Gutter +52 LF $47.00/LF $2,444.00
33 Construct Retaining Curb +92 LF $47.00/LF $4,324.00
34 Construct Cross Gutter and/or Spandrel +164 SF $26.00/SF $4,264.00
35 Construct Curb Ramp per City Std. Drawing 212-At Unit +$348.25 $41.00/SF $14,278.25
Bid Price
35a Construct Curb Ramp per City Std. Drawing 212-Adjusted +1409.14 SF $36.90/SF $51,997.27
Unit Price on Overage
36 Construct Curb Ramp per City Std. Drawing 213 +287.78 SF $41.00/SF $11,798.98
37 Construct Curb Ramp per City Std. Drawing 214 +124.50 SF $41.00/SF $5,104.50
40 Construct Curb Ramp per City Std. Drawing 214 (Earth Tone) 1,380 SF $41.00/SF ($56,580.00)
41 Construct Curb Ramp per City Std. Drawing 214 (Red +20.5 SF $53.00/SF $1,086.50
Tone
42 Construct Curb Ramp per City Std. Drawing 212 (12x12 -560 SF $53.00/SF
Red Tone Pavers) ($29,680.00)
43 Construct Curb Ramp per City Std. Drawing 212 (Multi-Color) +101:.75 SF $53.00/SF $5,392.75
44 Install Multi-Color Pavers +52 SF $82.00/SF $4,264.00
45 Construct Red Tone Concrete Pavement -8.5 SF $35.00/SF ($297.50)
46 Install Concrete Street Pavers -87 SF $47.00/SF ($4,089.00)
47 Install Hub Pipe -79 LF $276.00/LF ($21,804.00)
48 Install Handrail -14 LF $206.00/LF ($2,884.00)
49 Remove Existing Curb +27 LF $24.00/LF $648.00
50 Install Traffic Bollards -8 EA $2,941.00/EA ($23,528.00)
51 Install Nuisance Water Drain +1 EA $7,646.00/EA $7,646.00
55 j Install Rectangular Gray Stepping Pavers +48 SF $24.00/SF $1,152.00
57 Construct Curb Ramp per City Std Drawing 212 -At Unit +32/SF $41.00/SF $1,312.00
Bid Price
57a Construct Curb Ramp per City Std Drawing 212-Adjusted +2082.84 SF $36.90/SF $76,856.80
Unit Price on Overage
59 Relocate Existing Sign to New Location-Per Plan +3 EA $294.00/EA $882.00
61 Paint 6" Dashed White Lane Line Ext. Per Caltrans A20A +788 LF $1.00/LF $788.00
64 Thermoplastic 5" Solid White Line +865 LF $1.00/LF $865.00
66 Thermoplastic 6"/6" Double Yellow Stripe +4,222 LF $2.00/LF $8,444.00
67 Thermoplastic 6"White Solid Line +1.91 LF $1.00/LF $191.00
69 Thermoplastic Two-Way Left Turn, Left Turn Lane +310 LF $4.00/LF $1,240.00
93 Field Orders - 1 LS $100,000/LS ($100,000.00)
Total Change Order Amount $127,539.53
Contract Change Order No. 02
April 10, 2020
Page 3
CHANGES TO CONTRACT TIME:
Zero (0)working days are being added as a result of this change order.
SOURCE OF FUNDS:
Funds are available from the following account(s):
134-4497-50339
134-4497-50349
134-4498-59507
142-4299-65243
SUMMARY OF COSTS:
Original Contract Amount: $4,464,857.00 Original Completion 170 Working Days
This Change Order Amount: $127,539.53 Days Added 0 Days
Previous Change Order Amounts: $202,871.42 Previous Days Added 0 Days
Revised Contract Amount: $4,795,267.95 Revised Completion 170 Working Days
Field Order Authorized Amount: $150,000.00
This Field Order: $100,000.00
Remaining Field Order Amount: $ 50,000.00
[SIGNATURES ON NEXT PAGE]
air
Contract Change Order No. 02
April 10, 2020
Page 4
I have received a copy of this Change Order and the above AGREED PRICES are acceptable to Contractor
Elecnor Belco Electric, Inc. 4122/20
Signature Date
Alberto Garcia President/CEO
P 'nted Na ;nd Title
Interwest Consulting Group 'f
�y /SiaDdture Date
L�f.G.d�,yh rJ
Printed Name and Title
City of Palm Springs r
Recommended By: I
ALL 5 -�ILG Marcu Fuller ity Engineer Date
Approved By:
H. Ready, City Man Date
Attest By: Q
nthony Mejia City erk v Date
Distribution:
Original Conformed Copy: Conformed-File Copy: APPROVED BY CITY COUNCIL
Contractor (1) Engineering Pay File (1) 2 �` 1-
City Clerk (1) City Project File (1) •tom'
Purchasjnq (1)