Loading...
HomeMy WebLinkAboutA7204 - CHANGE ORDER NO. 3 FOR ELECNOR BELCO ELECTRIC, INC. FOR INDIAN CANYON DRIVE 2 WAY CONVERSION AND PEDESTRIAN SAFETY Yip pL �A CITY OF PALM SPRINGS CONTRACT CHANGE ORDER CgS)FORNi¢' To: Elecnor Belco Electric, Inc. February 24, 2020 14320 Albers Way Project No: 17-08 Chino, CA 91710 Project: Indian Canyon Two-Way Conversion and Pedestrian and Bicycle Safety Enhancements P (909)993-5470 Change Order No: 03 F (909)993-5476 Purchase Order: 19-0935 Account: 134-4497-50339 Attn: Olivia Chea 134-4497-50349 134-4498-59507 142-4299-65243 CHANGES IN WORK: Contract Quantity Adjustments This change order provides for extra work requested by the City for the items as indicated below. Request Contractor's Date Re uest No. Item Description Quantity Unit Price Total Furnish and Install 2" PVC Across Indian Canyon Dr at the Intersection of S Palm Canyon Dr and Camino 07/22/19 1 Parocela-ConduitwasOmittedfromPlans +1 LS $11,114.59 $11,114.59 Extra Work Performed on 7/22/19-Footing Over Excavate, Backfill With Slurry and Re-drill. Due to Rocky Conditions Encountered-See Attached Backup 01/22/20 1 Material +1 LS $9,10&91 $9,106.91 Extra Work Performed on 7/23/19-Footing Over Excavate, Backfill With Slurry and Re-drill. Due to Rocky Conditions Encountered-See Attached Backup 01/22/20 2 Material +1 LS $8,736.08 $8,736.08 Extra Work Performed on 7/24/19-Footing Over Excavate, Backfill With Slurry and Re-drill. Due to Rocky Conditions Encountered-See Attached Backup 01/22/20 3 Material +1 LS $6,524.78 $6,524.78 Extra Work Performed on 7/29/19-Footing Over Excavate, Backfill With Slurry and Re-drill. Due to Rocky Conditions Encountered-See Attached Backup +1 LS $4,210.01 $4,210.01 01/22/20 4 Material Extra Work Performed on 8/01/19-Footing Over Excavate, Backfill With Slurry and Re-drill. Due to Rocky Conditions Encountered-See Attached Backup +1 LS $11,866.66 $11,866.66 01/22/20 5 Material Extra Work Performed on 8/12/19-Footing Over Excavate, Backfill With Slurry and Re-drill. Due to Rocky Conditions Encountered-See Attached Backup 01/22/20 6 Material +1 LS $6,524.78 $6,524.78 Furnish and Install Two(2)Type III High Density 02/12/20 1 R136 CA 24"x36"at Indian Canyon Dr and La Plaza +1 LS $822.02 $822.02 Contract Change Order No. 03 February 24,2020 Page 2 02/13/20 1 Additional Layout of ADA Ramps on Indian Canyon Dr +1 LS $1,325.63 $1,325.63 Subtotal $60,231.46 Total Change Order Amount $60,231.46 CHANGES TO CONTRACT TIME: Nine (9)working days are being added as a result of this change order. SOURCE OF FUNDS: Funds are available from the following account(s): 134-4497-50339 134-4497-50349 134-4498-59507 142-4299-65243 SUMMARY OF COSTS: Original Contract Amount: $4,464,857.00 Original Completion 170 Work Days This Change Order. $ 60,231.46 Days Added 9 Days Previous Change Order(s): $ 330,410.95 Previous Days Added: 0 Days Revised Contract Amount: $4,855,499.41 Revised Completion 179 Work Days Field Orders Authorized Amount: $ 150,000.00 This Field Order: $ 0.00 Previous Field Order(s): $ 100,000.00 Remaining Field Order Amount: $ 0.00 [SIGNATURES ON NEXT PAGE] yl ., A• 1 Contract Change Order No. 03 February 24,2020 Page 31 I have received a copy of this Change Order and the above AGREED PRICES are acceptable to Contractor Elec nor Belco Electric, Inc. Aw�� 4/22/20' Signature Date Alberto Garcia President/CEO Pri ted Name d Title Interwest Consulting Group ( xD S ure ate Panted Name an Title City of Palm Springs Recomm nd d By: �1( Marcus Fu r, City Engineer Date 11 Approved By: jiG� David 7. Ready, City Manager Oate Attest By: LOG 02 Zo ArWony Mejia, Ci Date Distribution: Original Conformed Copy: Conformed'-File Copy: Contractor (1) Engineering Pay File (1) APPgOVEDBYCITYCOUNCIL Citv Clerk (1) City Project File (1) kvq (✓ Purchasinq (1) Finance (1)