Loading...
HomeMy WebLinkAbout01239 - HARLAN LEE COMPANY SEWER HERMOSA ANDREAS I y HARLAN LEE COMPANY (INC) - sewer SEWER CONSTRUCTION REFUND AGR. refund agr Hermosa Dr & Andreas Extend THE CITY OF PALM SPRINGS, CA: AGREEMENT 1239 HARLAN LEE COMPANY, I] Res ¢#11815, 7-7-76 SEWER AGREEMENT NO. THIS AGREEMENT made and entered into this 7 day of 1976 , between the CITY OF PALM SPRINGS, L, CALIFORNIA, a municipal corporation, hereinafter called the CITY, and HARLAN LEE COMPANY, (INC. ) hereinafter called the DEVELOPER: WHEREAS, the DEVELOPER is, at the time of this Agreement, the owner of Tract No. 5320 delineated on the plat "Sewer Con- struction Refund Agreement" attached hereto, marked Exhibit A, and hereby made a part of this Agreement; and WHEREAS, the CITY has established a policy for sewer refund Agreements and contribution for oversize sewer by City Council Resolution No. 9388 dated January 13 , 1969 , which by reference is hereby made a part of this Agreement; and WHEREAS, said sanitary sewers have been dedicated to public use by the DEVELOPER, and have been accepted by the CITY; and WHEREAS, the DEVELOPER has submitted a financial statement of construction costs for said sewers from: 1. E. L. Yeager Construction Company, Inc. , dated September 26 , 1973; 2. H. M. Robertson Pipeline Contractor, dated September 1, 1973, September 26 , 1973 and September 28, 1973; 3 . Hallmark Engineering, Inc. , (Civil Engineers) dated September 1, 1973; copies of which are attached hereto, marked Exhibit B, and hereby made a part of this Agreement; and WHEREAS, the DEVELOPER, in accordance with the aforementioned Council resolution, has requested that the CITY and ,the DEVELOPER enter into a Sewer Refund Agreement to reimburse the DEVELOPER for the cost of off-site sewer which benefits other properties; and - , ! • WHEREAS, the CITY has determined that benefit from the construc- tion of the off-site sewer will accrue to properties connecting to the off-site sewer; and WHEREAS, the CITY has determined that said benefit will be in direct proportion to the areas of the parcels; and WHEREAS, the CITY has determined, and DEVELOPER agrees, that the total assessable areas of parcels which can connect to the sanitary sewer by use of sewer laterals is 1, 774 ,072 . 65 square feet; NOW, THEREFORE, THIS AGREEMENT WITNESSETH that for and in consi- deration of the mutual covenants indicated between the CITY and the DEVELOPER, it is hereby agreed that developers, owners, or lessees of parcels shown on Exhibit A abutting said sewer shall pay to the CITY the amount shown herein, plus sewer connection to said sewer. Upon receipt of each payment CITY shall pay to DEVELOPER the amount shown herein. The Assessment for Parcels is hereby established: $0. 0155822 per square foot PARCEL NO. ASSESSMENT AREA COST PER PARCEL Square Feet Tract 5230 381, 446 . 56 $ 5, 943. 777 P. S. 73 92, 569 . 50 1, 442 . 436 P. S. 74 49 , 333. 00 769 . 496 P. S. 78 49, 410 . 00 769 . 917 P. S. s0 184, 642 . 68 2 , 877. 139 P. S. 83 123, 428 . 00 1, 923. 280 P. S. 85 49 ,410 . 00 769 . 917 P. S. 91 49 ,410 . 00 769 . 917 P. S. 92 203,266 . 15 3,167 . 334 P. S. 95 203 ,266 .15 3,167 . 334 P. S. 97 203,266 . 15 3,167 . 334 P. S. 101 184,574. 46 2, 876 . 076 Total District Cost Spread $ 27, 643. 957 Less Developers Portion 5, 943. 777 Actual amount to be reimbursed by Sewer Agreement $ 21, 700 . 180 • IN WITNESS WHEREOF, the CITY and the DEVELOPER have hereunto caused these presents to be executed the day and year first above- milantioned. ATTEST: HARLAN LEE COMPANY, (INC. ) Developer-Tract 5230 By: ATTEST: CITY OF PALM SPR GS, CALIFORNIA Donald A. Blubaugh A Municipal Corporation By. � ,, .Peputy City Clerk d A. Blubau(ffh, City Manager REV�IEEjWED & APPROVED: A F P R 0'r"E) o°Tle'er' ;1 I' 'CO'6 '2He L°. /fir/ 7- 7-7' STATE OF CALIFORNIA l COUNTY OF LOS ANGELES _ } SS. n On May Fi_ 1 976 before me, g the undersigned, a Notary Public in and for said County and State, personally appeared HARLAN .T LEE FOR NOTARY SEAL OR STAMP known to me to be the President, and aknown to me to be o Secretary of the rorpmation that executed the _ within Instrument, known to me to be the persons who executed the O;F.C7�.L SEAL within Instrument on behalf of the corporation therein named, and a acknowledged to me that such corporation executed the within ". �-( � Jj,A SPIIGF2 nri's�� P p° instrument pursuant to its by-laws or a resolution of its board of (: r�-n NOTARY PUBLIC - CALIFORNIA directors. � A',r,,LE5 COIJ:JTY ^ Pl.. cam. 2, 1980 o u15 L y Name (Typed or Printed) Notary Public in and for said County and State ,. 1 i i ALE✓O ROAD Q � f TRACT 15230 , J a i i � I � I I 'ALA 12�4D0 _ i' MH6 I RS. 20 - A.5. 95 I P.S. 97 /?S. 92 I FEE I h LAND I 3 kNaTAPARTJ I y /05 74 /?5. 25 PS. 9/ PS. 78 R6.22 Y � r Seiiver Carr9fruc�`ior7 iPefung',4gree��ern` f, BelzWeerr fhe Crfy of Pa/m S,oririgs pn�' �'' Lee CO. . CITY OF PALM SPRINGS DEPARTMENT OF COMMUNITY DEVELOPMENT ENGINEERING DIVISION Gi �4G,QEEiLlE1VT 10Z.47 APPROVED: R.C.E. I DESIGN BY: SCALE: FILE NQ: �t��XkTtTYKIYIIYi�k�YXkt7} Cv6CC. L.WR 1007-A S. PALM CANYON PALM SPRINGS, CAL. 922f2 CHECKED BY: DWG. Na: SHEET Na FH• OF • 0 1 - H. M. ROBERAON PIPELINE CONST*CTORS GENERAL ENGINEERING CONTRACTORS 85I8 Chicago Avenue Telephone 683-7210 P.0. ESTIMATE AND CONTRACT Riverside, 5, California 92507 � H. M. ROBERTSON PIPELINE CONSTRUCTORS (Seller) makes the following estimate and contract (good for 30 days). 'Harlan Lee Co. , Inc. PHONE 327 1449 DATE September 5, 1973 1101- 1100 Alejo Rd. , Palm Springs, Calif.'. NOT APPROVED PLANS LING ADDRESS — ❑ APPROVED PLANS ❑ PRELIMINARY PUNS NT1 Rudy Furbass others ENGINEERING BY ADDRESS Hermosa Dr. & Andreas Rd. , Palm Springs, Calif. JOB PHONE 47i UNLESS OTHERWISE SPECIFIED PAYMENTS ON ACCOUNT SHALL BE MADE AT PRESENTATION OF INVOICE,, FOR 100% OF WORK DONE OR MATERIAL FURNISHED. OTHER TERMS ON REVERSE SIDE, VERED OR COMPLETED BY WORKING DAYS AFTER PLACING ORDER. uantity Item Unit Price Total OFFSITE SEWER 3083 Lineal feet 8" vitrified clay pipe 6.00 $18,498.00 11 Manholes 460.00 4,400.00 1 Connection to existing manhole 100.00 ' 1 Connect onsite sewer to manhole #9- includes necessary 6" pipe 125.00 " �!�'ll9il fi�F $23,123.00 Permanent paving repair- Sunrise & Andreas $122.06 Will make temporary pavement repairs in Sun Rise Way for traffic consideration. This bid estimated from prelininary plans and any changes reflected on approved plans will necessitate a change in this estimate. These quanti-tiesare only approximate, and billing will be made ,for actual quantities installed, based on unit prices listed above. This job is to be done after rough grading but before .curbs and 'gutters or any other utilities are installed. This bid does not include permits or inspection fees which will be billed to you as an added item. Unit prices for manhole includes raising same after final paving. Paving (asphalt or concrete) around manhole, after raising, to be installed by others. H. M. AOBEAT$.O*�IPELINE CON UCTOfi.S STATE CQNTRACTO LICENSE NUMBE A-2481 �r (SEE REVERSE SIDE FOR CONTRA / . .a.... .... .+ INVOICE M',; �ATE CONTRACTORS+YiCENSi 41UMBER A•24872 ° GENERAL ENGINEEPING CONTRACTORS 3.518 Chicago Avenue Phone 683.7210 �'V m 4y(* P. O. Box 5617 {) 17 RIVERSIDE, CALIFORNIA 92507 L� 4 s,7i a .� •s,• � ���+�4 ��4 �- �50td TO �: Invoice Date w�8 -,•'F, �.i� -'CiI wrd:'?o y, sJ,.ps 'UNIT AMOUNT � QUANTIii Y D£S C P.I P T I O N PRICE - �. I ".'),"} w. 'rardi•Vraay G M1$s�.,� I i �� - 'A-P��k �it,r ri',A. W r ��r�#,.` ry•'.v Sou !,i ,�,�A M - I R J1FJJ .,`y'�41rIE�'a� �LL +!' rF5! Ao-rl 4�'f•,, rf`r• I �� CNA'iJl..liiT %Y,'� Y�dldToftti jri �1,�i{,n1�'rrxt,,�V , I 1 INVOICE TATE F"ONTRACTORS LI$ENSE NUMBER A-248124, I 1 r GFNERAL ENGINEERING CONTRACTORS r " Phone 683-721D 351$ Chicago .Avenue � `4R `n P. O. Box 5617O 1745 RIVERSIDE, CALIFORNIA 92507 Sold 1'0 Invoice Date �,5f UNIT DESCRIPTION PRICE AMOUNT GIUAN,IT. { y q y 1 a°. r1k n6'11 r^%0 I{ai' WSa.r tipkEy C22 6 1 r/ Y i ��4.✓ E. L. YEAGEOCONSTRUCTION CO NY, INC. ENGINEERS AND CONSTRU17TORS" RIVERSIDE, CALIFORNIA 92502 DATE Joe # 1:7 `)-Z�2 September 26, 1973 GUSTOMEVY 75095 YOUR ORDIIiR �t! SOL[) TO 11 rV1 Robertson CONTRACT DATE.— P 0 Box 3617 rdvertolde, Calif. 92507 TKNMgj Nftr 1611A V,IIHMnrS N11, Jou LOCATION:— Surix-ise CcAndreas DATE COMPLETED.-- 3-14-73 PER ATTACHTO 11- 15 Tons Asphalt @ 5-85 per -bon 65.23 6,10 Sales tax 3.91 Truck Rental 2 Hours @ 18.50 per hour 37-00 TOTAL AMOUNT DUE 106,ll1 -7, I A Zo LP11 II P,,,e 4 to the rrel,eiri ei ficr llon 78I6, fit, ce,f,et,T St,,f, l:ccnne 6.,d et j[3 regular rrertirg o, Ap,,] 22, 1966 111 S,vr1rii fagowin other p,r,r wi, III ' Notice' form Fe Lie, L,, C kl,-Iil C-dt -1 Civil Procedure, Section 1181 of saq.), 61V contractor, ub,rntractor. laborer, ;uppher or helps I. I -Ir.,- v, bet , -I ir,d for 1, Work 1 'UpPlIel, hi,!e a�,11911J to enforce , CIII ye,,, ,o,,f,. This IT'v,rI, lh,f, of el , c.11f hr,1111e ol, "i,d L, .,I i " ";'It IFrLt' 141d [bl ooll`:"s of 11' "le _ed i(t the itdchlede., Th,r hi,11,ri ell, Iri, .,r t­, /All 6d,waic f18k9,iug A, Wc[l As OF PALM SPRIN,GS. GAWFORNI Contractor Must Have rhis Permit at Malt ne Data P bli Works Department the Job Site or the Welk Will Nof Inpserfor. -0, Be Inspected. STRUCTION P E I . J For the Cv-0rwcVDn of ll DrIvel Sidewalks and other Structures on Public.Streets "lll, cr��.t F,On ()0 AE n Job Location: Lot___ e ront �iql;_�7wrhTcftarl firm or Corporatio&pl Dt.l, Z�_­dv��e�,_K� ----PHONE Block Tract------ PLAN PROFILE # SEE ATTACHED SKETCH I A(LAS SHEET NO. ....... Ti ioAl 11 iSeC"[12 1 Ill WMENSI(,'V� Stf )Vi I l,,VNY BE OBTAINFID Frontaq� Street Intersecting Street WORK ORDER NO, ir FROM OFFiCIA1. CtTY RPCORDS: --------- WAIVER NO. (1) DiOm;c+. Tronii I ft,ra to front _­dqL Of w1l, qy I fTgj N ff No. r) Widj[r Of wall: SURETY BOND NO. (3) Oist6oce ircm!L'ick edge of wall to property line CASH (41'Trl diOanc,,l front ,,rb face +o properly line ND NO, (6) .--Inches ---, Inches ROFiD IN TRUST No— LbaneloncJ HALL be dozed I( r T C H T 01I V 0 0 P i 4.1mill 2045W about il I 0611 pxfm Ill r!- in (r J HL-,I J,1)2 LOS 51,rec4 Address or Description ofoc;fon PERMIT 1 1 48 1 49 1 52 ADDRESS All work detailed on this permit s17011 Le 1 Cum FT. = $ — constructed in accordance with Ile Flu. visions of this permit to the sati0acilcr, 6NTT L R FT, = $ —7 f the City Engineer. The M u niclip&l __SC). F-1.AT PER 50. FT.= $ Code of the City of Palm Springs, this Construction Permit, and the following FT.Af------ PER SO. FT.= $ - standard plans are hereby made a part of this permit: FT. PER LIN. FT. = PAVEMENT; _SQ. r*f.AT--- PER SQ. Fr,= $ 54*00 $ spbc. The above referenced sketch, plans, pro. $ files. standard 'plan, waivers, affidavit bonds, insurance and the standard specl., ficaiians of the city of Palm S p1l 5, PERMIT FEES M_j1sv are hereby included and made a part of this permit, TOT, "4v7757' Ti- S IeID- 1,4. s JAS6 have road the above cod Mgt", to curniply will) the 1973 provIalonn of Ilk Iwirnit, includinj III,- fule'lit pfln"j P 7 on the reverse of Ildc ptirnit. and to pay foe my additional replacement necessary at fhermsult tj this APPROYHY 6.) b TY c't1GlNELR CITY TREASU11"EF work. CITY OF PALM SPRIGS DATE Cli-Y TREASURERS VALIDATION SIGNATURE OF APPLICANT, I 4 4 Y lmnrk Enginecringe Jnx*. 68-530 BROADWAY (HWY. I 10. SUITE 4 P.O. BOX 157 CATHEDRAL CITY, CALIFORNIA 92234 (714) 328-6571 September 1 , 1973 PETER G. RINGEIS Harlan Lee Company, Inc . Presider' 1033 Gayley Avenue ROBERT E SAUNDERS Vice-President LOB Angeles , CA LARRY W. PAUL RE: Tract 5230 (Greenhouse ) Vice President For Services Rendered : Design and Draft sewer improvement plans and Indian R/W plats for sewer easements; including co-ordination with City of Palm Springs , Bureau of Indian Affairs: 87 hours @ $21 . 00 per hour _ $ 1827. 00 Direct Costs: Blueprints and office costs $ 15 .10 Total Amount Due $ 1842. 10 ?rallmnrk Enginrrringe Jnr. 68-S30 BROADWAY (HWY. 111). SUITE 4 P.O. BOX 157 CATHEDRAL CITY, CALIFORNIA 92234 (714) 328-6571 September 15, 1973 PETER G. RINGEIS Harlan Lee Company, Inc. President 1033 Gayley Avenue ROBERTE SAUNDERS Los Anre.les , CA Vice-President LARRYW PAUL RE: Tract 5230 (Greenhouse) Vi ce-Pres,den t For Services Rendered : Construction Staking: 2429 lin ft of 8,, V.C.P. sewer main. Field work to obtain topography for design plans; 50 hours (2 man crew) @ $46 .00 per hour = $ 2300, 00 Direct Costs: Mileage and materials $ 46 . 50 Total Amount Due ,t 2346 . 50 1