Loading...
HomeMy WebLinkAbout01013 - CALTRANS STATE TRAFFIC SIGNAL LIGHTING HWY 111 TACHEVAH VIA LOLA 08-Riv-111-53. 3/53. 4 083 161401 On I e III at Tachevah Dr - Via Lola PLEASE RETURN THIS COPY District Agreement. No, TO CITY CLERK. State Div of Hwys-Traffic Signal & Lighting at III-Tachevah-Via Lola AGREEMENT #1013 (Original 11-28-73 Res #10932, 11-28-73 THIS AGREEMENT, MADE AND ENTERED INTO THIS DAY OFVa BY AND BETWEEN CITY OF PARK SPRINGS a body polltic and a municipal corporation of the State of California, hereinafter referred to as "CITY" AND STATE OF CALIFORNIA acting by and through its Business and Transportation Agency, Department of Transportation, hereinafter referred to as "STATE" Page 2 WHEREAS, STATE and CITY contemplate installation of traffic control signal system and safety lighting on Route III (Palm Canyon Drive) at Tachevah Drive - Via Lola, all of which is situated within the City of Palm Springs , and desire to specify herein the terms and conditions under which said system is to be installed, financed and maintained, NOW, THEREFORE, in consideration of the covenants and conditions herein contained, the parties hereto agree as follows: SECTION I STATE AGREES: (1) To install the traffic control signal system and safety lighting hereinbefore mentioned, through construction by contracts with construction contractors licensed by the State of California, said contracts to be carried out in accordance with provisions of the State Contract Act , Chapter 3 , Part 5 , Division 3 , Title 2 of. the Government Code, and work completed in conformity with plans and specifications of STATE, (2) To bear the entire expense of preparation of plans and specifications, and ST_ATE ' S share of construction engineering costs included all direct and indirect costs (functional and administrative overhead assessment) attributable to such work, applied in accordance with STATE ' S standard accounting procedures and construction costs required to complete the installation referred to herein, such share to be a sum bearing the same pro- Page 3 portion to the total cost of installation of the traffic control signal system and safety lighting as the number of legs of high- ways under jurisdiction of STATE at the intersection involved bears to the total number of legs of highways at such. intersection. (3) To maintain and operate the entire traffic control signal system and safety lighting as installed. SECTION II CITY AGREES: (1) To deposit with STATE within 30 days of receipt of billing therefore (which billing will be forwarded immediately following STATE ' S bid advertising date of a construction contract for the aforesaid installation) , the amount of $23 ,000, which figure represents CITY' S estimated share of construction engineering costs and construction costs required to complete the installa- tion referred to herein. The actual amount of CITY S share of construction engineering costs including all direct and indirect costs (functional and administrative overhead assessment) attributable to such work, applied in accordance with STATE ' S standard accounting procedures and construction costs will be determined after completion of work and a financial. settlement made upon final accounting of costs. Said share will be a sum bearing the same, proportion to the total cost of installation of the traffic control signal system and safety lighting as the number of legs of highways under jurisdiction of CITY at the intersection involved bears to the total number of legs of highways at such intersection. d Page 4 (2) To reimburse STATE for CITY proportionate share of the cost of maintenance and operation of said traffic control signal system and/or safety lighting, such share to b`e determined in the manner provided in that Agreement for Maintenance of State highways within the CITY which is in effect at the time said costs are incurred, or if no such agreement exists, such share to be a sum bearing the same proportion to the total cost of maintenance and operation of said traffic control signal. system and/or safety lighting as the number• of legs of highways under jurisdiction of the CITY bears to the total number of .legs of highways at such inter- section, (3) To furnish the necessary right of way unless otherwise provided for and to certify to STATE that the right of way is owned by CITY or that CITY has Right of Entry to do work. (4) To assume responsibility for removal and/or relocation of any utility facilities that may interfere with the installation of traffic control signal system and safety lighting, SECTION III it is mutually understood and agreed: (1) That obligations of STATE under terms of. this Agreement are -subject to the allocation of funds by the California Highway Commission, (2) That neither STATE nor any officer or employee thereof shall be responsible for any damage or liability occurring Page 5 by reason of anything done or omitted to be done by CITY under or in connection with any work, authority or juris- diction delegated to CITY under this Agreement. 'it is also understood and agreed that , pursuant to Government Code Section 895 .4, CITY shall fully indemnify and hold STATE harmless from any liability imposed for injury (as defined by Government Code Section 810.8) occurring by reason of anything done or omitted to be done by CITY under or in connection with any work, authority or jurisdiction delegated to CITY under this Agreement. (3) That neither CITY nor any officer or employee thereof, is responsible for any damage or liability occurring by reason of anything done or omitted to be done by STATE under or in connection with any work, authority or jurisdiction not delegated to CITY under this Agreement , It is also understood and agreed that , pursuant to Government Code Section 895 .4, STATE shall fully indemnify and hold CITY harmless from any liability imposed for injury (as defined by Government Code Section 810. 8) occurring by reason of anything done or omitted to be done by STATE under or in connection with any work, authority or jurisdiction not delegated to CITY under this Agreement. (4) That, should any portion of the project be financed with Federal Funds or State Gas Tax Funds all applicable Page 6 procedures and policies relating to the use of such funds shall apply notwithstanding other provisions of this Agreement. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their respective officers , duly authorized, the provisions of which Agreement are effective as of the day, month and year first hereinabove written. STATE OF CALIFORNIA CITY OF PALM SPRINGS Department of Transportation R . J . DATEL By „ .: State Highway Engineer By_ I/� /�� �cd Att '�� Distric Director City Clerk Approved as to Form and Procedure: �"� y Amttorney �� APPROVED BY TBE CITY COUNCIL BY Res. No. 10932, 11-26-•73. o 17