Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
04609 - ANDERSON CHARNESKY STRUCTURAL STEEL CONVENTION CENTER STEEL CP02-19-06
COC a 2005—SSii 08/18/2003 01 Fee:NC Page 1 of 1 Recorded in Official Records County of Riverside Gary L. Orso Assessor, County Clerk & Recorder III III III I IIII III IIII I IIII III III III II Return To: City Clerk City of Palm Springs P.O. Box.2743 Palm Springs, CA 92263-2743 NOTICE OF COMPLETION 60) NOTICE IS HEREBY given that: 1. The City of Palm Springs, California is a municipal corporation, organized and incorporated K pursuant to the laws of the State of California. [ I 2, The City Clerk of the City of Palm Springs is authorized and directed to execute, on behalf of said City, any and all Notices of Completion. 3. The address of the City of Palm Springs is City Hall, 3200 E Tahquitz Canyon Way, Palm Springs, California (P.O. Box 2743, Palm Springs, CA 92263-2743). 4. The public work of improvement on the hereinafter referred to real property within the city was COMPLETED on the 4"day of June,2003. 5. The name of the contractor(if named)for such work of improvement was:ACSS. 6. The public work improvement, which was completed in the City of Palm Springs, County of Riverside, State of California, is described as follows: Palm Springs Convention Center Expansion—Phase I, City Project#02-19. 7. The property address or location of said property is: 797 E.Andreas, Palm Springs, CA 92262. City Project No: Agreement No: ALvq Minute Order No: ""7 Z'2Z 02-19 02-19-06 DATED: CITY OF PALM SPRINGS By Executive Director-Airports PATRICIA A. SANDERS, being duly sworn, says. That she is the City Clerk of aforesaid City of Palm Springs, California, the corporation that executed the foregoing notice; that she makes this verification on behalf of said corporation; that she has read the foregoing Notice of Completion, and knows the contents thereof, and that the facts stated therein are true; that as said City Clerk, she makes this verification on behalf of said municipal corporation corporation City Clerk Index No. Anderson Charnesky Convention Center Steel AGREEMENT #4609 MO7222, 12-4-02 AGREEMENT THIS AGREEMENT made this 20 day of December in the year 2002, by and between the City of Palm Springs, a charter city, organized and existing in the County of Riverside, under and by virtue of the laws of the State of California, hereinafter designated as the City, and, Anderson Charnesky Structural Steel, Inc hereinafter designated as the Contractor. The City and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 --THE WORK The Contractor shall complete the Work as specified or indicated under the Bid Schedule(s) of the City's Contract Documents entitled: Palm Springs Phase I Convention Center Expansion Structural Steel City Project No. 02-19.06 The Work is generally described as follows: provide all necessary labor, materials, equipment, hoisting, scaffolding, tools, rigging and anything else necessary to complete the work for the Palm Springs Phase I Convention Center Expansion. ARTICLE 2 -- COMMENCEMENT AND COMPLETION The Work to be performed under this Contract shall commence on the date specified in the Notice to Proceed by the City, and the Work shall be fully completed within the time specified in the Notice to Proceed. The City and the Contractor recognize that time is of the essence of this Agreement, and that the City will suffer considerable financial loss if the Work is not completed within the time specified in said Notice to Proceed, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The damages suffered by the City would be extremely difficult or impractical to determine in the event of a Breach by the Contractor. Accordingly, the City and Contractor agree that the Contractor shall pay the amount provided below, as liquidated damages, for each calendar day that the Work is not completed in the time set forth above: $2,000.00 ARTICLE 3 -- CONTRACT PRICE The City shall pay the Contractor for the completion of the Work, in accordance with the Contract Documents, in current funds the Contract Price(s) named in the Contractor's Bid and Bid Schedule(s). ($157,047.00) ARTICLE 4 --THE CONTRACT DOCUMENTS The Contract Documents consist of the Notice Inviting Bids, Instructions to Bidders, the accepted Trade Bid and trade Bid Schedule(s), List of Subcontractors, Non-collusion Affidavit, Bidder's General Information, Bid Security or Bid Bond, this Agreement, Worker's Compensation Certificate, Performance Bond, Payment Bond, Notice of Award, Notice to Proceed, Notice of Completion, General Conditions of the Contract, Supplementary General Conditions, Exhibits A through G, Construction Drawings and Specifications, Addenda numbers 1 to 3, inclusive, and all Change Orders and Work Change Directives which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto. ARTICLE 5 -- PAYMENT PROCEDURES The Contractor shall submit Applications for Payment in accordance with provisions of the Standard Specifications as amended by the Special Provisions. Applications for Payment will be processed by the City as provided in the Contract Documents. ARTICLE 6 -- NOTICES Whenever any provision of the Contract Documents requires the giving of a written Notice, it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the Notice. ARTICLE 7 -- MISCELLANEOUS Terms used in this Agreement which are defined in the Standard Specifications as amended by the Special Provisions will have the meanings indicated in said Standard Specifications and Special Provisions. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The City and the Contractor each binds itself, its partners, successors, assigns, and legal representatives, to the other party hereto, its partners, successors, assigns, and legal representatives, in respect of all covenants, agreements, and obligations contained in the Contract Documents. (Signatures on Next Page) 5 IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above. CITY OF PALM SPRINGS A JFPSQT.. a municipal corporation B 1 - �_ BYE i ��� s City Clerk T, : �, , n �,Eity Man aEl�i"`N+OAi.XiD „' ; �s Feement over/enkier$2 000 did 72 APPROVED AS TO FORM: /1 r1/9 it Reviewed and approved by Procurement & Contracting By.— G, Initials N a' pate iLL City Attorney P.O.Number CONTRACTOR: Check one:_Individual_Partnership X Corporation Corporations require two notarized signatures: One from each of the following: A. Chairman of Board, President,or any Vice President:AND B.,Secretary,Assistant Secretary,Treasurer,Assistant Treasurer,or Chief/Financial Officer). E n r / Signature(notarized) Sig nature,(notarized) Name: Kevifn,Ctiarnesky Name: Kevin Charnesky Gr Title: President Title: Secretary State of California �ll State of California County0f San Bernardin(as Countyof San Bernardinoiss On12/20,fQ7ore me, Stacy Robbins on 12/20/02 before me, Stacy Robbins , personally appeared Kevin Charnesky personally appeared Kevin Charnesky personally known to me (xx)pravedcrt¢x=xauxtlaexhasixxAx personally known to me (a pumeck*xx)tcmrxAko:x5eeiarxffx 3dt1ef"§kWxkXk1gMgR) to be the person(R) whose name(ad xk"Dtixfu"Xdt$•YXxxX7dRAAR) to be the person(§j whose name(sj ishxR subscribed to the within instrument and acknowledged is/aft subscribed to the within instrument and acknowledged to me that hebshekitxX executed the same in his/kRrAjwlr to me that he6ek Akjt)( executed the same in his/bonWmk authorized capacity(tex), and that by his/ber6tkwxsignature(30 authorized capacity(ikx), and that by his6bek/6Wksignature(*i on the instrument the person(si, or the entity upon behalf of on the instrument the person(st, or the entity upon behalf of which the person(x)acted,executed the instrument which the person(e)acted, executed the instrument. WITNESS my hand and official seal. WITNESS my hand �ial seal. Notary t Notary Signa g�� 1 Notary STACY L. RO IN `,,, Y L. ROBBINS Commission# 1 80500 Notary Seal: Commi on# 1380500 c - Co z �,d '� Notary Public < II,, z z ,-r► Ndcyula'ic - California San Bernardino County — I • San Bernardino County r MYComm,ExpiresNov16,2006 �^ My Comm.EipiresNov 16.2006 TRADE BID SCHEDULE Lump Sum Price for Construction of The Palm Springs Convention Center Expansion Phase I Project No. 02-19 in the City of Palm Springs, California TRADE BID PACKAGE NO.: 6 TRADE BID PACKAGE DESCRIPTION: Structural Steels Metal Decking and Misc. Metals TOTAL BID PRICE - (INCLUDING PERFORMANCE AND PAYMENT BOND PREMIUM) - $ 157.047.00 Price in figures ONE HUNDRED FIFTY-SEVEN THOUSAND FOURTY-SEVEN DOLLARS AND ZERO CENTS Price in words ONE HUNDRED FIFTY-SEVEN THOUSAND FOURTY-SEVEN DOLLARS AND ZERO CENTS Price in words • BIDDER: ANDERSON CHARNESKY STRUCTURAL STEEL, INC. BY: Signature TITLE: _ BRENT FREEBERG, ESTIMATOR - .-.,, - DATE: DECEMBER 17, 2002 City of Palm Springs TRADE BID SCHEDULE - LUMP SUM PRICE TRADE BID FORMS - 3 • TRADE BID TRADE BID PACKAGEN 6 TRADE DESCRIPTION Structural Steels Metal Decking and Misc. Metals BID TO: CITY OF PALM SPRINGS, CALIFORNIA The undersigned Bidder proposes and agrees, if this Bid is accepted,to enter into an Agreement with the City of Palm Springs in the form included in the Contract Documents (as defined in Article 4 of the Agreement) to perform the Work as specified or indicated in said Contract Documents entitled,TRADE BID FOR: PALM SPRINGS CONVENTION CENTER EXPANSION PHASE I PROJECT NO. 02-19 Bidder accepts all of the terms and conditions of the Contract Documents,including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid Security. This Bid will remain open for the period stated in the Notice Inviting Bids unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the Instructions to Bidders,and will furnish the insurance certificates, Payment Bond, Performance Bond, and Permits required by the Contract Documents Bidder has examined copies of all the Contract Documents including the following Addenda (receipt of which is hereby acknowledged): Number 1 Date DECEMBER 5, 2002 Number 2 Date DECEMBER 6, 2002 Number 3 Date DECEMBER 12, 2002 Number Date Bidder has familiarized itself with the nature and extent of the Contract Documents, the Work, the site, the locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress or performance of the Work and has made such independent investigations as Bidder deems necessary. In conformance with current statutory requirements of California Labor Code Section 1860,et seq.,the undersigned confirm the following as its certification: I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self insurance in accordance with the provisions before commencing the performance of the Work of this Contract. To all the foregoing,and including all Bid schedule(s),List of Subcontractors,Non-collusion Affidavit,Bidder's General Information, and Bid Bond contained in these Bid Forms, said Bidder further agrees to complete the Work required under the Contract Documents within the Contract Time stipulated in said Contract Documents,and to accept in full payment therefore the Contract Price based on the Lump Sum or Unit Bid Price(s) named in the aforementioned Bidding Schedule(s). Date: DECEMBER 17, 2002 Bidder:ANDERSON CHARNESKY STRUCTURAL STEEL, INC. 1 ;A BRUNT FREEBERG / 1IS�B n,Wr� Title:EST I MATOR TRADE BID TRADE BID FORMS - 2 NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY OFFEROR AND SUBMITTED WITH PROPOSAL State of California 1 ss. County of SAN BERNARDINO 1 I, BRENT FREEBERG being first dulyy ggworn, deposes and says that he or she I5 ESTIMATOR of 1 ANDERSON IAURI SKY STRIICT A T r=i INC the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. • BIDDER ANDERSON CHARNESKY STRUCTURAL STEEL INC. BY — I (� TITLE BRENT FREEBERG ESTIMATOR t ORGANIZATION STRUCTURAL STEEL ADDRESS 11020 ROSE AVENUE, FONTANA, CA 92337-7051 SUBSCRIBED AND SWORN TO BEFORE ME THIS 17 DAY OF DECEMBER, 20.02. STACY L. ROBBINS Commission # 1380500 .=an Notary Public - California Zz San Bernardino County NOTARY PUBLI N A FOR SAID My Comm.Expires Nov16,2006 COUNTY AND S ATE MY COMMISSION EXPIRES: NOVEMBER 16, 2006 BIDDER'S GENERAL INFORMATION City of Palm Springs BID TRADE FORMS - 5 INFORMATION REQUIRED OF BIDDER LIST OF SUBCONTRACTORS As required under Section 4100, et. seq., of the Public Contract Code, the Bidder shall list below the names and business address of each subcontractor who will perform Work under this Bid in excess of one-half of one percent of the Contractor's Total Bid Price, and shall also list the portion of the Work which will be done by such subcontractor. After the opening of bids, no changes or substitutions will be allowed except as otherwise provided by law. The listing of more than one subcontractor for each item of Work to be performed with the words "and/or" will not be permitted. Failure to comply with this requirement will render the Bid as non-responsive and may cause its rejection. Contractor Percent License Of Total Work to be Performed Number Contract Subcontractor's Name & address 1. 2. 3. • 4. 5. 6. 7. 8. City of Palm Springs LIST OF SUBCONTRACTORS TRADE BID FORMS - 4 SCOPE OF WORK TRADE CONTRACT NO. 6 STRUCTURAL STEELS, METAL DECKING & MISCELLANEOUS METALS PALM SPRINGS CONVENTION CENTER EXPANSION PHASE I CITY OF PALM SPRINGS, CALIFORNIA Provide all necessary labor, materials, equipment, hoisting, scaffolding, tools, rigging and anything else necessary to complete the Structural Steel, Metal Decking & Miscellaneous Metals Work for the Palm Springs Convention Center Expansion Phase I Project. I. GENERAL: A. All conditions as set forth in the Safety Program as adopted by the City of Palm Springs (Exhibit A), Master Construction Schedule for Bidding Information (Exhibit B), General Liability and Automobile Insurance Limits (Exhibit C), Document List dated November 1, 2002 (Exhibit D), Construction Manager's Standard Provisions (Exhibit E) and Temporary Utilities for Construction Purposes (Exhibit F) are to be considered as part of the work. B. The Drawings and Specifications dated October 30, 2002 (Exhibit D), indicate the General Scope of Work. C. Trade Contractors shall carefully examine this Scope of Work to be performed and the relationship of this work to the work being performed by other Trade Contractors. D. Where a Specification Section is specifically included in the scope of this Trade Contract, it is intended that all work covered by that Specification Section will be included except as otherwise specifically noted. Other specification sections referred to either in these specifications or on the Drawings are included by reference. A. The word "provide" when used herein shall mean furnish and install completely, including all costs of labor, materials, equipment, hoisting, layout, scaffolding, tools, rigging and any other facilities necessary to complete the Work. F. OSHA 30 hour training policy, Exhibit H. H. SCOPE OF WORK A. All work defined in the Specification Sections listed below is specifically included, but not limited to, the Scope of Work of this Trade Contractor. 05120 - Structural Steel 05210 - Steel Joists 05400 - Cold Formed Metal Framing 05500 - Metal Fabrications Page 1 12/11/02 Palm Springs Convention Center Expansion Phase I Scope of Work Structural Steel, Metal Decking&Miscellaneous Metals Page 2 B. As further clarification, Trade Contractor shall: 1. Provide all submittals, certificates, test reports, shop drawings, details, (including connection details), as necessary to properly and accurately depict, acquire approval from Engineer, fabricate and install the structural, metal decking and mist. steel. 2. Trade Contractor shall provide all field measurements necessary to assure that the structural steel, metal decking and mist. steel items properly and accurately fit into the new and existing conditions under which they are being installed. This field measuring shall occur both during the shop drawing and during the fabrication phase to minimize any potential problems that may occur during installation. 3. Shop drawings erection drawings will include all vertical and horizontal "dimensions" for complete layout and location information. 4. Trade Contractor shall specifically include scaffolding, shoring, bracing, hoisting, cranes, etc., to complete the all the structural, metal decking, and mist, metals work. 5. Trade Contractor shall include all shimming and leveling of all structural, metal decking and mist. metal work. 6. Trade Contractor shall coordinate locations of staging and hoisting, including the path (including below) of any hoisted material, including crane hoisted. Trade Contractor shall properly barricade areas and path of hoisting. 7. Trade Contractor shall remove all existing fireproofing and paint as necessary to weld steel to existing steel. S. Coordinate steel roof AHU platform work with Convention center, through the CM, since new platform is located over existing occupied restroom. 9. Trade Contractor shall furnish and install temporary cable guardrail, handrail, and toeboards at perimeter of new metal deck roof edge, and all roof openings. Cable railing shall be installed in accordance with OSHA and CAL-OSHA standards. 10. Shop prime all Steel and Misc. steel except where steel is required to be galvanized or fireproofed, or welded in the field. After welding, areas not to receive galvanizing or fireproofing shall be primed painted. 11. Trade contractor to provide welding curtain to shield arc-welding operations from site by other trades, workers, employees, conventioneers, public view, etc. Provide welding curtain at Rooftop, Page 2 12/11/02 Palm Springs Convention Center Expansion Phase I Scope of Work Structural Steel, Metal Decking&Miscellaneous Metals Page 3 where adjacent Hotel Guests could substain eye damage from observing roof top welding. 12. Obtain flame permit on daily basis from CM for all welding operations. 13. Provide fire watch after each day's welding operations to ensure all threat of ignition to existing structure is eliminated. Return flame permits after each day's welding operation and fire watch is completed. 14. All welders shall be certified and qualified as per ASWS standards. Trade contractor shall furnish certifications for all welders performing work. 15. Provide welding truck with its self-contained power source, and proper leads, as temporary power to welders may not be available. 16. Provide all steel, but not limited to, beams and columns, bracing, x- bracing, ledgers, angles, channels, pipes, pipe railings, sleeves, posts, tube steel, plates, anchor bolts, high strengths bolts, bolts, nuts, fasteners, stiffeners, caps, hangers, gussets, bent plates, studs, metal decking, closures, closure strips, welding, torquing, etc, to complete the structural steel, metal decking and mist, metals work. 17. Provide coiling door channel and tube steel frames, including angle frames. 18. Include the following embedded items for installation of the mist. metals by other trades. The items include, but not limited to, anchor bolts, cast-in-place pipe bollards, railing sleeves, dock embed angles, frames for grating, embedded angles, plates and metal accessories. Coordinate installation with concrete and other trades. 19. Provide continuous plate per detail 1/53.03. Coordinate the installation of the structural steel beams, gussets and continuous bent plates with demolition and drywall framing Trade Contractors. Installation of gussets and bent plates will be phased as necessary to allow bottom track over continuous bent plate and demo of exterior framing so as not to damage remaining parapet wall. 20. Provide all pipe railing at ramps and stairs. 21. Provide all anchorage, fasteners, supports, and welding for installation of your work. 22. Coordinate, through Construction Manager, all City, welding and bolt testing deputy inspections. 22. Include all costs, permits and fees associated for the loading and unloading of steel, including crane, street use and access permits. 23. Coordinate all holes, cutouts and copings. Page 3 12/11/02 Palm Springs Convention Center Expansion Phase I Scope of Work Structural Steel, Metal Decking &Miscellaneous Metals Page 4 24. Provide holes at all new steel beam supports for operable wall track. Coordinate hole location, sizes and spacing with the Operable Wall Trade Contractor. 25. Properly tag and permanently identify all new steel and misc. steel, including all FOB items, delivered to the project. 26. Provide all grinding sanding, and touch-up of surfaces and weld joints to produce metal products ready for paint and other finishes. 27. Shop prime all miscellaneous metal items as required by the specifications. Include cost to touch-up all field welds with primer or galvanizing. 28. Provide all layout and engineering for your work from control lines established by others. All survey control, including benchmarks, lines and grades, lost or damaged by this Trade Contractor's operation, will be this Trade Contractor's responsibility. 29. Coordinate and schedule all deliveries and hoisting with the CM 48 hours in advance. 30. Coordinate installation with other Trade Contractors through the Construction Manager. 31. Provide daily clean up and removal for all debris generated by your work. 32. Provide Daily Construction Reports to Construction Manager. 33. Trade Contractor shall assume shoring of existing trellis for final adjustments of existing steel trellis to new steel structural framing. 34. Provide new steel supports at all new roof openings, including but not limited to, steel platforms at for AHU, boilers, roof hatch, exhaust fans, condensing units, etc. 35. Provide metal deck and support steel framing at locations of removed or relocated roof equipment, including, but not limited to roof hatch and exhaust fans. 36. Provide temporary weather protection at roof during tie-in of new steel to existing steel locations 37. Provide the following insurance for Combined Single Limit or Aggregate, in the amounts described: A. Comprehensive General Liability, in the amount of 3,000,000.00, including: a. Premises and Operation b. Elevators C. Independent Contractors d. Blanket Contractual Including Liability Assumed by Insured Under the Subcontract. Page 4 12/11/02 Palm Springs Convention Center Expansion Phase I Scope of Work Structural Steel, Metal Decking & Miscellaneous Metals Page 5 B. Comprehensive Automobile Liability in the amount of 1,000,000.00, including: a. Owned b. Non-owned C. Hired Automobile Exposures. C. WORK EXCLUDED: 1. The following items are specifically excluded from the Work: a. Concrete fill in pipe bollards. b. Rebar D. LABOR RATES: 1. To determine the sum to be paid for labor and materials for change order work performed under a time and material basis, the following hourly rates shall be multiplied by the number of approved hours for each classification of labor. These hourly rates represent full and complete compensation (including overhead and profit) for providing labor. In addition, these rates represent full and complete compensation for the cost of incidental items including but not limited to such things as small tools and equipment (valued at less than $250), travel expense, fuel, employee parking, etc. E. ALLOWANCE: None F. ALTERNATES: None E. GENERAL INFORMATION: 1. In addition, the Work will include the requirements of General Conditions, Supplementary Conditions, and Division 1, General Requirements. 2. The drawings, specifications, and other information listed as Contract Documents indicate the general scope of Work, and do not necessarily indicate or describe everything required for the full performance and completion of the Work. Trade Contractor shall be solely responsible for Page 5 12/11/02 Palm Springs Convention Center Expansion Phase I Scope of Work Structural Steel, Metal Decking &Miscellaneous Metals Page 6 completing the Work in accordance with code requirements and the reasonable intent of the Contract Documents. 3. Trade Contractor shall visit the site and become familiar with the existing conditions and the physical condition of the site. Trade Contractor shall examine and fully understand the Contract Documents and all other exhibits, attachments, engineering reports, soils reports, special studies, and existing conditions to the extent necessary to perform the Work. 4. Trade Contractor acknowledges that he will be working in an existing, fully functional facility. As such, Trade Contractor will allow for the Owner's needs for security and cleanliness and will perform this work without disruption of the Owner's day-to-day operation. 5. Trade Contractor acknowledges that Turner is the Construction Manager and as such has no field forces or material handling capability to assist Trade Contractor. Page 6 12/11/02 . a PERFORMANCE BOND BOND #B34227818 KNOW ALL MEN BY THESE PRESENTS, That Anderson Chameskv Structural Steel.Inc, as Contractor and GULF INSURANCE COMPANY ,as Surety are held finely bound unto the City of Palm Springs, a Charter City, organized and existing in the County of Riverside,California,hereinafter called the "City," in the sum of: One Hundred Fifty Seven Thousand Forty Seven($157,047.00) dollarsyfor the payment of which sum well and truly to be made,we bind ourselves,our heirs,executors,administrators, successors,and assigns,jointly and severally, firmly by these presents. WHEREAS said Contractor has been awarded and is about to enter into the annexed Agreement with said City to perform the Work as specified or indicated in the Contract Documents entitled: PALM SPRINGS Phase I Convention Center Expansion CITY PROJECT 02-19-06 MASONRY NOW THEREFORE, if said Contractor shall perform all the requirements of said Contract Documents required to be performed on its part, at the times and in the manner specified herein,then this obligation shall be null and void, otherwise it shall remain in full force and effect. PROVIDED,that any alterations in the Work to be done or the materials to be famished, or changes in the time of completion,which may be made pursuant to the terms of said Contract Documents, shall not in any way release said Contractor or said Surety thereunder,nor shall any extensions of time granted under the provisions of said Contract Documents,release either said Contractor or said Surety,and notice of such alterations or extensions of the Agreement is hereby waived by said Surety. SIGNATURES ON NEXT PAGE . . r SIGNED AND SEALED, this 26TH day of DECEMBER I-9 2002 ContractorlANDERSON CHARNESKY STRUCTURAL Contractor/ANDERSON CHARNE KY STRUCTURAL ' STEEL, INC. By / — STEEL, INC. Title KEVINCCHARNESKY. PRESIDENT Title KEVIN CHARNESKY. SECRETARY Corporations require two notarized signatures: One from each of the following: 1. Chairman of Board, President, or any Vice President: AND 2. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer, or Chief Financial Officer). SEAL AND NOTARIAL ACKNOWLEDGMENT OF SURETY Surety._GU LR--INSURANCE COMPANY TfridRA.ANIREDE Title ATTORNEY:--N-FACT CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT c, n r Itis State of California �0 County of SAN BERNARDINO ss. ti On DECEMBER 30 2002 before me, STACY ROBBINS ai Dale Name and The of officer(e.g.,"Jane Doe,Notary Public I<\. personally appeared KEVIN CHARNESKY S Nemela)of lgner(a) l I4; X7 personally known to me �> ❑ PMXXWXi000KXXKXDI'ORdN@ XXX7fX9OWXKMI( IiS X'XJ(mm r•,I uS s>' to be the person(X) whose name(,% is6em subscribed to the within instrument and )) acknowledged to me that hets1o781p v;executed i),1 a the same in his/IYAGXMK authorized jl capacity$XX), and that by his/KkXXIM t)) signature(X) on the instrument the person(A, or j) (% STACY L. ROBBINS the entity upon behalf of which the person(sk •"'"'T Commission If 13805W z n acted, executed the instrument. 3 y Notary Public - California _ -(,• b`-- San Bernardino County WITNES m o ial seal. My Comm,E)pIres Nov 16,2006 <, � Nalary Ilc 11 <;1 r OPTIONAL ' Though the information below is not required b law,it may g y 9 q y y prove valuable to persons relying on the document and could prevent Wl fraudulent removal and reattachment of this form to another document, e Description of Attached Document `^ Title or Type of Document: aj t> dl C Document Date: it t, Number of Pages: Scc IC Signer(s) Other Than Named Above: ZI Capacity(ies) Claimed by Signer ), rC Signer's Name: gl I� ❑ Individuals �^ Top of Thumb here <I C ❑ Corporate Officer—Title(s): ) ; ❑ Partner—❑ Limited ❑General t ❑ Attorney-in-Fact f (r ❑ Trustee Ir ❑ Guardian or Conservator ❑ Other. �o c c71 fi („ Signer Is Representing: 9 C�iv,v� �`.- ��..- ass�•c.v�r.iv vE%J✓J ai= _vfL(i3:J"-15:=, w�b'v.JJ�-'•'J� v.-.vim`.'-J�u - �_�_ `—'�.-o- - •-.Oi ©19BB Nal coal Notary Assoc,al,on•B360 De Solo Ave,PO Box2402.Obala.ddb,OA913132402•1wwna,anabvd,., V,Pmtl No 5907 Reevor Coll Tell Rod 18008766E27 CALWORNIA ALL-PURPOSE ACKNOWLEDGMENT State of cATIroRNIA County of RIVERSIDE On DECEMBER 26, 2002 before me, STEFANIE REYES, NOTARY PUBLIC DATE NAME.TITLE OF OFFICER.E G,'JANE DOE,NOTARY PUBLIC personally appeared TAMRA ANDREDE NAME(S)OF SIGNER(S) E personally known to me - OR - ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and ac- knowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their C,C)Iv1 i Nt. f�1334 t9� signature(s) on the instrument the person(s), u1 ,' NOTARY PUBLIC;CALIFORNIA C'' My o m EBIP enGO� °o zocs.n or the entity upon behalf of which the " "" person(s) acted, executed the instrument. WIT7ESS my. hand and official se -LI NATURE OF NOTARY OPTIONAL Though the data below Is not required by law, it may prove valuable to persons relying on the document and could prevel-' fraudulent reattachment of this form. fy 6. CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCLIMEN-r I!i ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE(s) TITLE OR TYPE OF DOCUMENT ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ❑ ATTORNEY-IN-FACT NUMBER OF PAGES ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER: DATE OF DOCUMENT SIGNER IS REPRESENTING: NAME OF PERSON(S)OR ENTRY(IES) SIGNER(S) OTHER THAN NAMED ABOVE 80-1133 3/94 PAYMENT BOND BOND IB34227818 KNOW ALL MEN BY THESE PRESENTS, That GULF INSURANCE COMPANY as Surety, are held firmly bound unto the City of Palm Springs,a Charter City,organized and existing in the County of Riverside, State of California, hereinafter called the "City," in the sum of One Hundred Fifty Seven Thousand Forty Seven($157,047.00)dollars, for the payment of which sum well and truly to be made,we bind ourselves,our heirs,executors, administrators, successors, and assigns,jointly and severally,firmly by these presents. WHEREAS,said Contractor has been awarded and is about to enter into the annexed agreement with said City to perform the Work as specified or indicated in the Contract Documents entitled: PALM SPRINGS Phase I Convention Center Expansion CITY PROJECT 02-19-06 MASONRY NOW THEREFORE, if said Contractor, its subcontractors,its heirs,executors, administrators, successors, or assigns shall fail to pay for any materials,provisions,provender,equipment or other supplies used in,upon,for or about the performance of the Work contracted to be done,or for any work or labor thereon of any kind, or for amounts due under the Unemployment Insurance Code,or for any amounts required to be deducted,withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such labor,all as required by the provisions of Title XV, Chapter 7, Sections 3247-3252,inclusive, of the Civil Code of the State of California and acts amendatory thereof,and sections of other codes of the State of California referred to therein and acts amendatory thereof, and provided that the persons, companies,or corporations so furnishing said materials, provisions,provender,equipment or other supplies, appliances or power used in,upon,for or about performance of the work contracted to be executed or performed, or any person, company or corporation renting or hiring implements or machinery or power for or contributing to said work to be done, or any person who performs work or labor upon the same, or any person who supplies both work and materials therefor, shall have complied with the provisions of said laws,then said surety will pay the same in an amount not exceeding the sum hereinbefore set forth and also will pay, in case suit is brought upon this bond, a reasonable attorney's fee, as shall be fixed by the Court. This bond shall inure to the benefit of any and all persons named in Section 3181 of the Civil Code of the State of California so as to give a right of action to them or their assigns in any suit brought upon this bond. PROVIDED,that any alterations in the Work to be done or the materials to be famished,or changes in the time of completion,which may be made pursuant to the terms of said Contract Documents,shall not in any way release said Contractor or said Surety thereunder,nor shall any extensions of time granted under the provisions of said Contract Documents release either said Contractor or said surety,and notice of said alterations or extensions of the Agreement is hereby waived by said Surety. SIGNATURES ON NEXT PAGE a ' SIGNED AND SEALED, this 26TH day of DECEMBER 1-9 2002 Surety GULF INSURANCE COMPANY, _ Contractor "1 ERSON CHARNESKY STRUCTURAL �nj / STEEL, INC. By UICLYII/CCC t 'Cl� e, r =_ By -TAMRT-ANDITEM O Title ATTORNEY-IN-FACT = _ Title KEVIN C& ESKY, PRESIDENT (SEAL AND NOTARIAL A-CK_NOWLEDGNIENT OF SURETY) Contractor ' DERSON CHARNESKY STRUCTURAL EEL, INC. Title KEVIN, ESKY, SEC"ARY Corporations require two notarized signatures: One from each of the following: 1. Chairman of Board, President, or any Vice President: AND 2. Secretary,Assistant Secretary, Treasurer,Assistant Treasurer, or Chief Financial Officer). CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT t1 I( State of California -ift 55 >I f� County of SAN BERNARDINO On DECEMBER 30, 2002 STACY ROBBINS )I I(a before me, Dole Name and Tile of Officer(o 9,•Jane Doo,Nolary Public") lj KEVIN CMARNESKY personally appeared >; Namels)of Signers) col GCS A personally known to me ,i 0 #YJLXX i.XMX➢f1 X)=Xb(O[)( 3( XXO(IO 6XXftltlCXg I<• &N4BIXKK�( 'tiff 1n to be the person(91) whose Paul is/= Ili subscribed to the within instrument and Ali it'lll acknowledged to me that he/.XI7t%f%Mexecuted 2n �10� the same in his/klPX,jagg authorized �p C capar and that by his/hQDfHI9@Xx CiIF signaturel on the instrument the person((x), or ill i> •�;�• STACY L. ROBBINS the entity upon behalf of which the persorl t.... i Commission# 1380500 z acted, executed the instrument a .e Notary Public - California > )I �( San Bernardino County WM and and fficlal seal. `>i My Comm.Expires Nov 16.2006 �I `rcr11 ( Sgnafwe of N nets W <<� OPTIONAL y Though the information below is not required by law,it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document r;i Title or Type of Document: loil t;l Ir;JI )I Document Date: Number of Pages: 3 n )� If� Signer(s) Other Than Named Above: t,I 1 Capacity(ies) Claimed by Signer i i <t I 11� Signer's Name: 3 )I @ El Individual 99 Top of Ihumb here �)J �C El Corporate officer—Title(s): ql l� 0 Partner-0 Limited ❑ General �3 n? ❑ Attorney-in-Fact i< ❑ Trustee (? ❑ Guardian or Conservator ❑ Other. t)I Signer Is Representing: �s)l ins ? ,,�t;,.� ;;� ;a�c �,—;....,c .'?:�� ,t:>,".,�"v�'✓. r�,_.. _ _ —., �i 01999 National Nolary Assoclallon•9330 De Solo Ave,P0 She 2402•Chatsworth,CA 913132402•www naliershooiary or, Prod No 5907 Reorder Call Toll Free1.800-876-6827 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of CALIFORNIA. County of RIVERSIDE On DECEMBER 26, 2002 before me, STEFANIE REYES, NOTARY PUBLIC DATE NAME,TITLE OF OFFICER-E.G.,"JANE DOE,NOTARY PUBLIC" personally appeared TAMRA ANDREDE NAME(S)OF SIGNER(S) O personally known to me - OR - ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and ac- knowledged to me that he/she/they executed L=`V' Lpo�gq lip❑'S' . f„ the same in his/her/their authorized CONIMI. #133s4199 '.4 capacity(ies), and that by his/her/their , - Pr; NOTAR`!PUBLIC-CALIFORNIA q,° RIVERSIDE-.COUNTY signature(s) on the instrument theperson(s), "x• "Z'�'�:• famm f-xplres Duo.90 2005 or the entity upon behalf of which the person(s) acted, executed the instrument. WITNESS _y_hand and official sea. SIGN TUNE OF NOTARY OPTIONAL Though the data below is not required by law. It may prove valuable to persons relying on the document and could prevell• i, fraudulent reattachment of this form. 1 CAPACITY CLAIMED BY SIGNER DESCRIPTION OF ATTACHED DOCUMENT ❑ INDIVIDUAL ❑ CORPORATE OFFICER TITLE(S) TITLE OR TYPE OF DOCUMENT ❑ PARTNER(S) ❑ LIMITED ❑ GENERAL ❑ ATTORNEY-IN-FACT NUMBER OF PAGES ❑ TRUSTEE(S) ❑ GUARDIAN/CONSERVATOR ❑ OTHER: DATE OF DOCUMENT SIGNER IS REPRESENTING: NAME OF PERSON(S)OR ENTITY(IES) SIGNER(S) OTHER THAN NAMED ABOVE BD-1133 3/9q y H?'1R d FORD, CC2MJ6l9EC`P9CUT POWER OF ATTORNEY rPRIGINALS(IF Tu,,F POWER OF A11OHHEY ARE PRINTED ON BLUE SAFETY PAPER WITH TEAL. INK. KNOW ALL MEN BY THESE PRESENTS:Thai the Gulf Insurance Company,a corporation duly organizes under the laws of the State of Connecticut, having its principal office in the city of Irving, Texas, pursuant to the following resolution, adopted by the Finance S Executive Committee of the Board of Dimciors of the said Company on the 1Oth day of August, 1993,to wit: "RESOLVED, that the President, Executive Vice President or any Senior Vice President of the Company shall have authority to make, execute and deliver a Power of Attorney constituting as Attorney-in-Fact,such persons,firms,or corporations as may be selected from time to ine;and any such Attorney-in-Fact may be removed and the authority granted him revoked by the President, or any Executive Vice President, or any Senior Vice President, or by the Board of Directors or by the Finance and Executive Committee of the Board of Directors RESOLVED, that nothing in this Power of Attorney shall be construed as a grant of authority to the atiorney(s)-in-fact to sign,execute,acknowledge, deliver or otherwise issue a policy or policies of insurance on behalf of Gulf Insurance Company. RESOLVED,that the signature of the President, Executive Vice President or any Senior Vice President,and the Seal of the Company may be affixed to any such Power of Attorney or any certificate relating Thereto by facsimile, and any such powers so executed and certified by facsimile signature and facsimile seal shall be valid and binding upon the Company in the future with respect to any bond and documents relating to such bonds to which they are attached." Gulf Insurance Company does hereby make, constitute and appoint TAMRA ANDREDE its true and lawful aiiomey(s)-m-'tact, with full power and authority hereby conferred in its name, place and stead,to sign, execute, acknowledge and deliver in its behalf, as surety, any and all bonds and undertakings of suretyship, and to bind Gulf Insurance Company thereby as fully and to the same extent as if any bonds,undertakings and documents relating to such bonds and/or undertakings were signed by the duly authorized officer of the Gulf Insurance Company and all the acts of said attorney(s)-m-fact, pursuant to the authority herein given,are hereby ratified and confirmed The obligation of the Company shall not exceed five million (5,000,000) dollars. Rtl`IWITHFSS WHEREDF,tho Gulf Iosaranco Cordpany has carved these prusenis to he signed try any officer of the Company and its Corporate Seat to be ho:rcie aifixod- d'��'. GULP INSURANCE,.C0-M-PAN—Y qSOVANCE cc SF A-L STATE `�F fJ�"�� ,©Aiii 11, c n0 J vL4r+a=`;. -1 -�.L:.,�.�cl_; SJ 'VNE � Lavvre� eP°r7vli:-eer ^J `VY OF :I °t Y�Pd{ _ )CxccutivF'Vaa President - - On f lis tsf hay of 0"tailer, AD 2001, hefore me came bawrenoo P. IlPfli ler, known to me porsonally who being by rma duly swain, did dopose pod sat+: "hat he rochloo in ME)Cmnq of Oergen,Stale of NawJersey;ihat he is dire Executive Vice President of file Gnif Insurance Company,the corporation descrihod iri 21id'aA ACii executed rho above instrument;that lie knows the seal of said corporation;that the seal affixed to the said instruments is such corporate soal; @Goad id liras so atfdsed by order of Elie Beard of Director,of said corporation and that he signed his name,thereto by like order. S"d.(1_'k' F 11fE°d'y i'(D:ZI£ c F �d/CL\O O� ANGIIC MAIIABFR-Bi.GA ,.`? �S �� ..� Notary Public,State of New Y'®ids C''OtJt�TY Q TVE-1fd;C)K".rC .� QF YV�`'I`4 No.OIMA6019988 Qualiiled in Kings County Con:euissien Expires February 16,2003 9,the und=lgnod,SertiurVico f"mcidenl ut rho Gutt henlvan¢e Cnntpany,a C000ecticui Corporation,DO HEREBY CERTIFY that the foregoing and attached 70WER 6F ATTCTfNBS remaies fit tali iorco. — signed and seated at the City cf Nervloric. JJJf�\N,SUPANCECCya� Dated the 26TH Jay of DECEMBER ,rr� 02 F '`� �OSpeR'1TF� 1,oNEB \ •• s d 1 George Btancardi Senior Vice President PALM City of Palm Springs (I 43 Department of Procurement and Contracting \ C R,�P 3200 Tahquitz Canyon Way • Palm Springs, California 92262 � FO r TEL:(760) 323-8239 • PAX(760) 322-8372 • TDD(760)864-9527 CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO ALL TRADE CONTRACTORS PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 1 This Addendum is being issued for the following changes and informational items: SUMMARY OF CHANGES: This Addendum includes: 1. Change: (All Trades) Change bid date from December 10, 2002 to December 17, 2002. 2. Add: (All Trades) Section 19 to Instructions to Bidders - Construction Manager's Administration. 3. Add to Supplemental General Conditions (All Trades) Item 2A. 4. Add Exhibit"H" OSHA 30 Hour Policy (designated Trades). 5. Change Instructions to Bidders Section 8 Bid Form. (All Trades) 6. Informational: Scopes to be provided Monday, December 9, 2002. (All Trades) 7. Informational: Anticipated Project Schedule is available on the City's web site. 8. Informational Lists: (A) List of Pre-qualified Trade Contractors for those trades requiring pre-qualification and attendance at the mandatory pre-bid conference Post Office Box 2743 0 Palm Springs, California 92263-2743 (B) List of Trade Contractors who attended a Mandatory Pre-Bid Conference for applicable trades which did not require pre-qualification. 9. Delete Bid Package 16 - Fabric Sound Panels from the Notice Inviting Bids. DESCRIPTION OF CHANGES 1. Change Bid Date: A. Change Notice to Pre-Qualified Trade Contractors for the following trades: Trade Bid #1 Selective Demolition, Trade Bid #6 Structural Steel, Metal Decking & Miscellaneous Metals, Trade Bid #13 Metal Stud Framing & Drywall, EIFS, Insulation & Fireproofing, Trade Bid #28 Kitchen Equipment, Trade Bid#29 Plumbing,Trade Bid#30 HVAC,Trade Bid#31 Fire Protection and Trade Bid #32 Electrical, published in the Desert Sun on November 11 and November 16, 2002: Change Date and Time of Opening Bids from 2:00 p.m., local time, December 10, 2002 to 2:00 p.m., local time, December 17, 2002. B. Change Notice to Trade Contractors for the following trades: Trade Bid #4 Concrete & Reinforcing, Trade Bid #8 Roofing & Sheet Metal, Trade Bid #9 Doors, Frames& Hardware, Trade Bid#15 Acoustical Ceiling,Trade Bid#16 Fabric So&Wallcovering and Trade Bid#21 FRP,published in the Desert Sun on November 11 and November 16, 2002: Change Date and Time of Opening Bids from 3:00 p.m., local time, December 10, 2002 to 3:00 p.m., local time, December 17, 2002. C. Change Notice to Trade Contractors for the following trades: Trade Bid #5 Masonry,Trade Bid#10 Overhead Coiling Doors,Trade Bid#14 Ceramic Tile, Trade Bid #25 Dock Equipment: Change Date and Time of Opening Bids from 4:00 p.m., local time, December 10, 2002 to 4:00 p.m., local time, December 17, 2002. 2. Add Article 19 to Instructions to Bidders - Administration of Trade Contracts under Construction Manager as follows: Article 19.0 Administration of Trade Contracts under Construction Manager. 19.a. Work is to be performed in accordance with the Construction Manager's Project Construction schedule. A detailed schedule and corresponding Schedule of Values will be required from all Contractors within 10 days from award of Contract, and will be used in developing, updating and modifying the Construction Manager's Project Construction schedule. Trade Contractor's will acknowledge that the Project Construction Schedule will include "out of sequence," and "phasing" of the work. Trade Contractor shall provide a three (3) week look ahead schedule of its work on a weekly basis. 19.b. Complete submittal log and packages including fabrication and delivery lead times shall be submitted to Construction Managerwithin 10 days of award of the Contract. 19.c. MSDS sheets shall be provided the Construction Manager and maintained on site for the duration of the Project. All trade contractors shall include handling material in accordance with the MSDS. 19.d. Trade Contractor acknowledges that he has visited the site and familiarized itself with the existing conditions, including phasing of work,which may influence the Work.Trade Contractor also warrants that he has reviewed the Contract Documents priorto execution of the Contract and has notified the Construction Manager of all conflicts contained therein that could affect cost, schedule or quality. If conflicts are found after the execution of the Contract, Contractor shall perform the Work in accordance with the Construction Manager's direction for no change in Contract Price or Time. 19.e. Trade Contractors shall be responsible for coordinating theirwork with other Trade Contractors scopes of work. Trade Contractors shall review and study the Drawings and Specifications, submittals, and shop drawings of the Work of other Trade Contractors with respect to the coordination of their work with these other Trade Contractors, 19.f. Trade Contractor shall schedule the work and the presence of it's employees at the job site and any deliveries of supplies or materials by it's material men and suppliers to thejob site on such days and at such times and during such hours, as may be required by the Construction Manager. Trade Contractor shall assume responsibility for such schedule compliance not only for it's employees, but also for its material men, suppliers and subcontractors. 19.g. Trade Contractor shall be responsible for the cost of expediting all deliveries of his materials to meet the requirements of the Construction Manager's progress schedule. Should it become necessary, in order to maintain job progress, for the Construction Manager to augment the Trade Contractor's expediting efforts, all such costs incurred by the Construction Manager shall be borne by the Trade Contractor. 19.h. Trade Contractor agrees that it will notify its employees and related personnel, via written handouts, that the use of illegal drugs, intoxicating beverages, and firearms or other weapons on the site is prohibited. 19.i. Strikes (including sympathy strikes)or any other stoppage of work by employees performing the work on, or delivering supplies or materials to, the Project shall not excuse any delay of the Trade Contractor in the proper performance of its work, regardless of whether the strike or other stoppage of work is attributed to union action or the decision of an individual employee. 19.j. No publicity releases (newspaper, radio, TV, advertisements, etc.) shall be issued without the prior review of the Owner and of the Construction Manager. No signs, other than field office identification signs, will be permitted. 19.k. Trade Contractor shall be responsible to continually update sepia drawings (with draftsman quality) of the working Drawings, large scale detail drawings,and specifications to show any and all field changes thereon. Sepia drawings shall be maintained in the Construction Manager's field office. Plumbing, Fire Protection, Mechanical,and Electrical Trade Contractors shall provide copies of the current as built drawings with their monthly payment requests. Payment requests will not be processed without these updated drawings. 19.1. Final Payment will not be processed by Construction Manager unless all required Record Drawings, As-Built Drawings, Operations and Maintenance Manuals, Guarantee/Warranty Letters, Care and Maintenance information, and all other Close-Out Documents are inventoried, approved, transmitted to and received by the Construction Manager. 19.m. The Trade Contractor shall furnish to Construction Manager,on a daily basis, a report of the total number of his workers employed on the job, hours worked, and a detailed description of the work performed by his own forces or that of his subcontractors. Contractor shall include copies of their job site toolbox meeting minutes, including participants sign in sheet. 19.n. Trade Contractor shall be responsible for providing off-site storage facilities for his own materials at its cost. The storage of materials and equipment at the site shall be permitted only to the extent approved by the Construction Manager in advance. Location of Trade Contractor's items of storage, plant and tools requires approval from Construction Manager. 19.o. Electrical power will be provided on the site for the use of the Trade Contractors for the operation of small tools. Trade Contractors shall provide extension cords from distribution points.Temporary power will be provided by the electrical Trade Contractor. 19.p. Minimum temporary lighting will be provided to maintain the foot candle coverage required by law. Contractors are each required to provide their own necessary task lighting. Temporary lighting will be provided by the Electrical Trade Contractor. 19.q. Trade Contractor will be responsible for ventilating any hazardous, combustion, or other pollutant causing equipment or material, within the area(s) of Work, including all ventilation required by the MSDS. 19.r. Trade Contractorshall give the Work constant attention,management, and supervision through an authorized Superintendent and all necessary assistants. Such Superintendent shall be authorized to act for the Contractor in all matters relating to the Work, and all directions given him shall be binding.Trade Contractor must provide Contact name and emergency phone number to Construction Manager prior to commencement of work. 19.s. Trade Contractor shall be responsible to provide all scaffolding, toe boards, temporary shoring (engineered if required), ladders, scissor lifts, or any other equipment, including hoists, necessary to complete their work. Trade contractor shall ensure that all its employees,and subcontractor's shall be OSHA trained in the use of the equipment. 19.t. All equipment to be used indoors must be approved by the Construction Manager prior to the commencement of work. 19.u. Movement of all vehicles and equipment into and on the site,including unloading, shall be subject to the control of the Construction Manager (including the flow of traffic patterns). Individual Contractors shall be responsible for observing established traffic regulations and for providing flagmen, as required, to prevent disruption to general traffic by his vehicle, equipment or operations. Trade Contractor is responsible for clearing all debris from streets, parking lots, or public areas resulting from its operations. 19.v. Temporary toilets will be provided for use of all workers. The restrooms within the Convention Center and adjoining Hotel are not to be used by Construction Personnel. Temporary toilets shall be provided by the Plumbing Trade Contractor. 19.w. Temporary safety fencing and barricades may not be moved and/or altered without the prior consent of the Construction Manager. 19.x. Parking will only be allowed in designated areas. There will be NO Construction parking in the general lots forthe Convention Center or adjoining Hotel. Those vehicles found in violation of this policy, will be immediately towed from site,with the Owner of the vehicle held responsible for towing and storage costs. 19.y. Radios, tape recorders, cameras, video cameras, or any other audio or visual equipment are not permitted on the job site. 19.z. The display of any offensive pictures,words(including foul language), etc, on the job site is strictly prohibited and will be grounds for removal of the responsible personnel from the job site. 19.aa. Smoking, or smokeless tobacco, are not permitted on the job site (inside or out). Smoking will only be allowed in a designated area to be determined by the Construction Manager. Violation of this item may result in expulsion of individual(s) from the Project and/or monetary fines. 19.bb. Consumption of food and beverage on the Project will be limited to areas as designated by Construction Manager. There will be absolutely no food or drink allowed within the building. 19.cc. There will be no Communications with Conventioneers, Hotel guests, staff or Convention Center personnel, unless a safety item is at issue. 19.dd. Trade Contractors shall be responsible to protect all existing, or completed finishes. Trade Contractor will bear the costs for restoration, disinfection, cleaning,and/or replacement any areas damaged by their Work. 19.ee. Neither the Owner, nor the Construction Manager will be providing Guard Service for the job site. The Trade Contractor has the liability for any loss or damage to their tools, equipment or materials as a result of vandalism and/or theft. 19.ff. Trade Contractor shall directly arrange and call for all inspections required by the City, or other municipal agencies, as required, but will inform the Construction Manager in advance of said inspections.All permit plans and permits will be delivered to the Construction Manager. 19.gg. Trade Contractor's Foreman/Superintendent will be required to attend weekly Safety/Coordination Meetings at a location on the site designated by the Construction Manager. 19.hh. Appropriate clothing and accessories shall be worn at all times. This includes, but is not limited to, work boots, eye protection, hard hats, etc. Shorts, sleeveless shirts or tank tops are not allowed. 19.ii. Positioning devices (body belts), used as a sole means or method of tie-off for fall protection compliance, without the use of an approved full body harness will not be permitted at any time. 19.jj. Only the use of approved lanyards having an approved deceleration device which complies with OSHA Standard: Fall Protection, 29 CFR 1926, in conjunction with an approved full body harness with D-ring at shoulder level, will be permitted as approved fall arrest system at any time. 19.kk. Use of roll-out, non-locking connector type snap hooks is prohibited for use at any time. 19.11. Construction Manager has developed a Project Construction Schedule that shows contract duration and approximate phasing, sequencing and relationships of the Work. This schedule is based on the Construction Manager's Schedule concepts developed prior to the start of Construction. The Project Construction Schedule is subject to change and update pending discussion, modifications, acceleration after receipt of each Trade Contractor's schedule, weekly schedule updates, and its submittal, material and equipment fabrication and delivery lead times following the award of the Contract and commencement of the Work. 19.mm It shall be the responsibility of the Trade Contractorto become familiar with the updated Schedule(s) and shall, at all times, cooperate with the Construction Manager to keep on the premises sufficient material, supervision, and manpower to perform the Work of their Contract in keeping with the Project Construction Schedule. 3 Add to Article 2 of Instructions to Bidders the following: 2.a. Bidders are assumed to be knowledgeable of their respective Trades of work and shall include all requirements to complete a complete, fully functional, code complying system ready for its intended use as described by the Construction Documents 4. Add Exhibit"H" OSHA 30 Hour Policy, for trades designated in the exhibit, attached. 5. Change Instructions to Bidders, Section 8, Bid Form. Replace existing second paragraph with the following:The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs. The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words "Trade Bid for Palm Springs Convention Center Phase I Expansion" and the date and hour of opening bids. The name of the Trade and the Trade Bid Package Number shall also be clearly marked on the outside of the envelope. Each trade bid shall be enclosed in a separate envelope. 6. Informational: Scopes will be provided via Federal Express delivery Monday, December 9, 2002 to plan holders of record. 7. Informational The Anticipated Project Schedule is available at the City's web site. Go to www.ci.palm-springs.ca.us. Go to Departments. Go to Procurement . Select appropriate document. 8. Informational: For your information the following lists are attached: A. A list of pre-qualified trade contractors for those trades requiring pre- qualification and attendance at the mandatory pre-bid conference. B. A list of Trade Contractors who attended a Mandatory Pre-Bid Conference for applicable trades which did not require pre-qualification. 9. Delete Bid Package 16 - Fabric Sound Panels. This work is being deferred to Phase II of the expansion of the convention center. END OF ADDENDA NO. 1 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs // vZ/ Harold E. Good, CPPO Director of Procurement & Contracting Dated: December 5, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Exhibit"H" OSHA 30 Hour Policy List of Pre-Qualified Trade Contractors for Trades Requiring Pre-qualification and and Attendance at the Mandatory Pre-Bid Conference List of Trade Contractors who Attended the Mandatory Pre-Bid Conference Which Did Not Require Pre-Qualification EXHIBIT H OSHA 30-HOUR POLICY Palm Springs Convention Center Expansion Phase I Palm Springs, CA 1214/02 Trade Contractor and all lower tier sub-subcontractors shall comply with the requirements of OSHA 30-hour Training.All Trade Contractor's supervisory staff must be OSHAcertified.Supervisory staff with written evidence of OSHA 30-hour certification within the last 3 years will be acceptable. Training for Trade Contractor's staff not currently certified, can be certified through Turner Knowledge Network (TKN). The web site address is www.turneruniversity.com and must be completed within 3 month from the date of its Trade Contract Agreement or no less than 30 days from start of work. Monthly Payment is contingent upon evidence of current certification or enrollment in the OSHA 30-hour training within the period specified above. Within 5 days of the date of Award of Contract, provide the following information: Project Name Certified Subcontractor Supervisor's Name Y/N Sub-subcontractor(s) Supervisor's Name Y/N Supervisor's Name Y/N Supervisor's Name Y/N Supervisor's Name Y/N Note: Attach a copy of the certificate for Supervisors already certified. Please return this form to the attention of: TURNER CONSTRUCTION COMPANY David Livingston @ FAX: (760) 323-4918 PRE-QUALIFIED TRADE CONTRACTORS FOR TRADES REQUIRING PRE-QUALIFICATION AND ATTENDANT AT MANDATORY PRE-BID CONFERENCE, Trade Bid Name/Number Contractor 1 Selective Demolition Penhall Company Clauss Construction Forward Services, Inc. 6 Structural Steel, Metal Decking & Miscellaneous Metals Orange County Erectors, Inc. ACSS Law Steel 13 Metal Stud Framing & Drywall, EIFS, Insulation & Fireproofing Anning-Johnson Company Raymond Interior Systems Berger Bros Inc. Martin Bros 28 Kitchen Equipment TriMark Raygal, Inc. Kamran & Co. Duray/JF Duncan AM Fab 29 Plumbing SSW Mechanical Murray Company D/K Mechanical Kincaid Plumbing Cc Pan Pacific Plumbing 30 HVAC SSW Mechanical ACCO Engineered Systems Cal-Air Inc. Couts Heating & Cooling Los Angeles Air Conditioning 31 Fire Protection Daart Engineering Shasta Fire Protection 32 Electrical SASCO Cove Electric System Electric Brudvik Inc. LIST OF ATTENDEES FOR THOSE TRADE BIDS REQUIRING ATTENDANCE AT THE PRE- BID MEETING BUT DID NOT HAVE TO PRE-QUALIFY 4 Concrete & Reinforcing Precision Concrete Forward Services, Inc. 8 Roofing & Sheet Metal Al Miller & Sons Roofing, Inc. AAA Roofing Service First Single Ply Roofing 18 Resinous Flooring Allied Industrial Coatings, Inc. Floor Seal Technology Ac3vfH Activity Orlp Early Early ID Description Dur Start Flnlah Mobilization Mobilization 100D Mobiim 0 IMobilize � I 1®7 �1TpTrda � 2 2rJ7.TP �et up Trailer ar�'aY 1 "@ �N7v@ 0 iSet Temporary war Pole 1040 ErMthapecM aTPL Pow r s g IUD Be�aJTarp Pove �Insp-efirm Energize e o p,Power 3 a 07 Ctu B_Energize To P.Power Obbia1LID Fabl DernaParat 2 0 © Install Consl lotion Fencing .Igig OL�F Ww B�gPa * o ;Q Obtain De o Permit I 1210 Oiled�Meefigldcrn Pem a 0 1CLECO2 Obtain Ki chan Building Pkrmlt 41W BH Dele 0 I7OEt1V Obtain Sr Inge Meeting Room Permit 4160 AaadTreeCata6rs Did D to i® Statdcar,*U on 8 MEOW 031MO3 Award Tra a Conlrectora !I 0 � � 31art of C nelmctlon Kitchen — Phase 1-Kltd]eft Expansion Demolition&Gradingj 11N Safe ClfSptids®E]atrCrrlgry&Turis 1 ODWLU (DYM 1110 SakORE]edial 0 Safe Off 9�prinkler®Exl rlor Cnnopy 6 T•Ills 1®0 Instal Site Causnxi�lFaldg iDVJLU 0 Safe Off Electrical l 1130 FCUdBsfng lmdrg DockCcUBo 2 101M413 31 3 Install Slte Construction encing 1180 ShoreTi is Protect Existing Load Dock Cold So 118) DerlfoEldea' Wal Frrh@Teh 3 10YarJ7i 10WI13 A Shore 7r1111s 4 10W M ,rr1 W ® Demo Exterior Well Flhish @ Tla-In Lo etlona 1131 TerprayUsT.m{fhJa(FykrtrWab ® Temporary q 1140 Pick]dC�Ma i iQYtJ@ 101"hm p ry Via ueen rotectlon at Exterior Walla 112) F�roeTradl O Protect Gas Meter I 1170 DarpTm[s 1 10WJCD tOW403 0 Remove fresh Compact r 1 131Mi13 13NNA 11SJ DarrEnofLoodig ODdc FLIUShrLe 3 14,1^1J03 itiYWA B Demo Ynllls 1g)p Dmn-� 0 Demoiltlon of Loadin Dock Roof Structure S1as,Loa}g DockW&&FBs 3 i5IDNf3 17JMD3 ® Demo-Concrete Sle s,Loading Doc Walls&Five 123D Slala&PnrJuC+akfJav9iigA� 2 17N413 33yvp3 """��I 19M Sol CagsCon&Pad CaYcafiol Stage&Rough Gra a New Building rea ! 0 211NdD Soll'IICom action BPad CertIDcetlo Structure — im Snry&Lead 1 21.IMLD 21,Wy73 A Su ey&Lsyoul 7�0 6�.�B6ig&DockWbIF, 2 Zll^lJCB ZiYQdU B E cavate Bulldln d Dock Wall F otlnps 12� SdCmFe6nTads 0 2LYJJtB Um Fda1 Pc4�atButlrg&DodcVJatFo*gs 2 27J 3 II Compaction eat, We l UNEP S nslall Reber a Bulldlnp&Doc Wall Footlnps me RdaF D 3t.WJ0i 9 - _ UIG MEP 1MD PLrB°�rg&Do*W;;IFmFga 1 giber lnspectl n M Fam Cdrm Pas& �y g Pour Building Dock Well 4.nga RamWets 3 31A433 Form Colum Piers&Ramlls 1431 11G MEP 0 37N70 ♦U/G MEP Ina Won Slen Dale 13N YG2 PSC2 Flnlah Dale � 1]MAYOJ ® F+riY&v Sle"MIMi1 ' Dale Defe 25N 2 Proaree"eer Turner Construction Company 0n1i n"~ clwJwJ nga1ed Run Data D5DEC@1657 D"ectl Ace"lly ®Primavera Systems,Inc. P.S.Convention Center Expansion I Activity' Activity Orig Early Early 2002 ID Description Dur Start Finish MR Am my ii—im 1430 BUG NIEP 2 WW,133 31'YJ\l:Li Backfill UIG MEP iTD hNal FWwA Cki milvrhrfirls a Pr+a y -- -�-� - - - - � - - - - - II i 37' ltPfT313 I$1 Install Rahgr a Column Anr, or Rolls®Piers ._ 13111 fMwNrluen n Ilrf-T�'n WAl VW xrlkn rtubei beep .nnn "� U Ul-1 ll "oil Inspect on 1330 Itxr &rW JIFpt'S 09 33DB _IW I-11n _ 1 Pour Cohn m Plen a nsmp Wsn• 1 � 3 Strip Pier Wall Forms 1340 Edd W*&Ckmo'ed Fo*m 2 OTEM WF231xi BackRll ells&Demo'ed Dollops 1 Q1F133W �� 3 Grade 91 b on Grade 13D SdCmTaiTl 0 O7F®LO Soil Corn action 1330 Sa<SffiEco&DmkAv 2 10'�W 11FEE!!i B Set 31a{r��Edge&Dock Angles 13BD EporyRxrkat 5ffi I _ - _ -- - _-- 0 Vlaqulen and Sand --� l - - - 41A) 2 1� ;� II__ _ . Epoxy owele at Ezlatin Slab - W10 9xkatQQims 1 12 M 12'�lD 3 Bloek-tput @Columns 5� ��� 2 13rBM 1M-EUM 13 Install Reber 14BDYtepedlm 0 iNEIDJ 4 147D Pourmfg Seb On Oede 1 17F�03 17Fff03 _ �_._ 0 Reba eba Inspection ___ 7 SYpSFab&W�Fvns 1 17F®(B 1TT33fA —_ _- —___� ____—, _ 9 Stab In Grade 1P30 SrtStuira,SbdComs � 1 Ship Slab&Wall Fo Inns 7 19EBM 131332i 0 SeG Structural Steel Columns 1SD — 3 19�R3 ZIFEBCi 8 1 tatall Structural S eel Beams 1510 WektCanedxsbF rg SExiAE t 3 21FEBW ® Weld Connectlo s to Existing Sduclure&Gussets 1537 y,,�119M Inspecion & @6�Eo-Wan 3 2>t -- _� _ __ - - © Install Strongba_k_&_Kickers @_Ex_Iat Extr.Wall _ 1940 DernoE�tr 0 Z9 Weld inspection Frck@ 2 2T1 2 ® Demo Exterior ramin 199) FNal EatrnTredc@F rrO Paced 3 27FEE03 ClAdam g 1510 isDlMBU &Qre>� Install Botto Track @Existing Parapet 1�g tstalB�Pble 3 OrTA^7d13 ® Install Meta Decking&Closures 1510 Myckob �� 3 �A^li13 [B.M1N"10 ■ Install Bent late 2 OIkWdIi 1UAM�i ® Monokot Structural Steal Exterior I 'I�0 LayatSRivWals 1 2 2Y®D3 3 'Layout Exterior ells 1'.PD Fsta1TS.�F31kQ Dcas 1 2TEBM I y 11 27D Flare ExkiirWak j 1 Install T.S.a R II-up Doors 2 2FF3� ZJF�LD Brame Exterior ails 2AOpay�Wal Rougi i 3 Plumbing all Rough-in 2MD _ -- - --.- I _ _ ® Electrical W II Rou h-In_-_' IM il Nav Frarsg�'n 0 2T Q3NQ706 - -- - - - __ - _ __ . g 1810 E,dailr I� r]�' New Gas Pip rag Rough-in ♦Exterior Fnml Inspection 1tID IsalEriarrSdfddig(ba.basrl;) 1 � 2�03 J 9 of i6O Srt6falorl)=-ra 1 Install Exterior rFra es (toe:boarda) IK11 �b o%2ffv J Set Exterior D r Frames tffi Somfighpaction 2 CBvWim ■ Install Exte or Dens-Glee 183D E.IFSFsi�n&Femti 0 O7MN7D �E%tenor Sh sting InapectlorY 3 D7PM'aD itM^l�i E.I.F.I i eulatlon l Revel Is 1830 FJFS Medr Ba�Cc� 4 1W✓rFiXi 13dNiA E.LF.S eah Base Coati 1901 FJFSFrdrCo3t 3 tA1v1M-YI3 18NAVO E.LF Finish Coat 1� 1 i 13vY+FRi _ 1 Ram ve Scaffolding— 2b0 Instal - —_ _.._. ___ _---- __- g_.--Rniaq Darr 2 1gvWiI3 2PAN�i - ---_ __ 21� YdsIDms&tea ■ Inst II Roll-up Door* MEP 2 2IvgM; RAVU ■ Ins ell Doom&Hardware 21100 Fsta EArrbr 3 2bVVib ZMV03 I alai MEP Trim �� *E�a 2 0 sulk Exterior Sheet 2 of 11 _ ^a" Activity Orlg Early Early ID Description Dur Start Flnlah 1910 Pak3r EIF.S@RodT"1 3 27MrJ{D 2T•NfiD3 ZRO pa Exle.D. _ __ ___._.__ _ . _...____. __�-._ --_._ _ - __ ® �atch E.LF_S�Rcof Tialn's__ 2CE2 �V'fTII Z71Jf'}� 6 Exterior Doors M FffiIDn7r Brrrpa Y ffiIorr O urnper 1 clip Ltias 1 6 alnt g Install Door Seals @ Roll-up Do ra ZH] i Interior U Install Dock Burnpor 1570 Frare FtY6rWak 1 O7fAM03 O�MR03 E Layout Interior Walls 2 QRlVJ703 1RvVJ1D3 Frame Interior Walls 1610 SetFamLEQaW}idavfraras 1 1OvV470i 'IOvW'i0i gp3p Sol Fan Cck 1 Set Interior Door a Window Fmmea 2 11M1F. IZAA0 2190 PlsrbrUWaf RAugm&Ras9raTaa 5 11NAFYD 17bWWiQ3 ® Set Fan Coils 2*0 _ �ialVJa1 Ra�Ma SdPIewP 4 11AV4iB 14fAsfTO ----' --- -'-'-- - - ------ --- I�_Plum Ing Wall Rough4n a Pressure Taat i Elsct l at Well Rough-Iq a Set New Pant?270 FJadFI�WualY Fsperin 0 111.4N7M Interior F aming Inspsction 22M > t 0 17A4N70i Plumb gWalFq�ecibn 0 lffm;A Elecir cal Wall Inspection 2H Gyred 3 184NFiB 37vy✓f7Ii Plum Ing Wall Inspection i5ID Fy"Llt13siiadRodDedr - D ell _- _ - 3 1D 3 21MNrfl 0 In leto Underside�f Roof Dock 7J1D �av Fsped'm 0 ZNAFiO 7171 Tape,F6A8FFtJl 4 2MV 23� Scre Inspection 1� indu dACpahmd 5 pe,Float a Finish 21MsF113 2%ffiFM ® Install HVAC Overhead 1610 l sfal O.eilBaJdarO r P4U Dm ati 5 2ZW 2IV ® Install Ovarha, Plumbing a Pressure Tsal 1610 Fs41 Fra Sprii�rOH Ppg,DmpsaP.T. 5 1110 FdalO,ahead P}sti-al GOInstall Fire Sprinkler O/H Piping,'Drops a P.T. 5 21AM14YD ON Install Overhead Electrical M 410D FffiI HoVdBRad O-tASdR ppFbaFlem'oTeg 3 2WWm MMFO3 Install H SRR and CHWS9R Piping a Pressure Tesl 7DD PaitW-k a 07rsl CeBg, 3 2 AEO _223v0AD3 24]0 t9al D.SH d.ae 2 27kNJYfl Z3vNl� slat Walls a Drywall Collings 1t0D -- _._ - ;_ __ _ _ Install Doors a`iardware FapedFNFC8HN5aR.OfN'aRPfigOsleed 0 31MARM li Inspect HVAC a HWS a RfCHWS a R P Ing Overhead«- --- ----77 ------- -------- 76D Flpa70.r traipi h}g 0 31_M_VM ' 4170 Fsl�p}{I-NpC DCIF'prg a Flniig Frig z 31� 0 �Inapect Overhead Plumbing .IEG7 Inau ate O/H HVAC Duct/Plping a PI mbing Piping F[{edFra SpiihrOshmd 0 31MAM ' 1670 Fspe1omhoadE13Jfm1 0 311v1N7D Inspect Fire Sprinkler Overhear) 2�D �� 1 31M1KViA 31M.NT0 - .-__ _ - -Inspect Overhead Elachtul 23D PaFiDonsaFrarem 2 OVFT313 Install Giaas l - -- ZdTI CeigVJres 2 Paint Dooro a Frames TdD Amseal CeiigG 2 03N-Fm Old 0 Ceiling Wlret 2130 ii _*Nev Bola 0 03 0 Acoustical Coiling Grid 2g0 Fvaall-fight3 04AFFUS -- -- -- -- -- ---- Tle-In New B�Iler 2310 Isla)Ceiling D'"ars 3 _ �------ - _ - ---- --- i• Install Lightixtures Zg0 Flatel SFAidaFieair 3 6 UA-9Q3 ® Install Ceiling Diffusers 233D FzpedOstsad6Cnsap g 0WFz M Install Spfllnkler Heads 2340 Enegaa LgtRezm 1 0amm � Inspect Orsrhead for Cava-up 2M isfal CRig Tie 2 10M"fi@ __ __�_ ____ _ _- ._ _ �.Energize�Ight Flxtums 23U RgraCak Ra 2 1. � B I wpwnstall Ceiling Tlla 2iW Paves M Prep a Caulk Floor Fb 5 iWiim 1—PF93 2� SealCmam Fly@DYSITaea 1 15NT� iWFM Rsainous Flooring 29M IrStAv ,Tatotke 15 15 1 Seat Concrete Floor(M Dry Storage 1 N�3 1 Install VCT at Office _2110 FHal RbbaBasee@DySfr� 2 16W{770 17A97D3 _ __- ___ _ _ - _ _ '2740 Install FRP 4 18^A;Q3 23N-f703 0 Install Rubber Base Dry Storage 1)♦ Install FRP Sheets of 11 Acdvlty Activity Ong Early I Early NOV-1 10 Dear; on Bur Start Finish 2510 IllP'Qa Boll 1 ilWPF103 1114PR 3 I 1 Install Pipe Bollards 2M PatPpeBuds 1 21gfo 20M B Pa �nl Pipe Bollards 20 Elachraffam 2 ZWi� 214M li Electrical Trim 2» Pin;hngTrin 2 2'!>ET�i 21PPH0i f"-- - -- - -- --- -- III Plumbing rim 230 lncwco orra 1 2VPfO 27PFlYO ! 0 Install Comer Guz rds 2VD ShcOiarFilprrrl 3 2' 2 ® Set Kitchen Equipment 24® YddDi3vuda8itxktp 2 2a''Fl�B Install Dlshwaa er&Hook-up 2193 Ha*W kfsnE4lprrat 3 30+Fft70 02JAYII7 -- - Hook.u Kitchen Equipment 200 al&Pu ch" 3 30W403 IBvt4>43 2540 Clyispection 0 � li Clean-up&Punchllat City Inspection 25EO FWrDeparYratYryeclon 0 Dal ' Health Department Inspectiog' 257DB-f City Final In cy lspection Root Certificate of Occupancy 16� isialR odDras 3 3 1011AIb33 ® Install R99of Drains i(ID Ysh16 8Cadaag Uif�l6mts 2 03AWO 071V14M 9 Install Boll ar&Condensing Unit Platforms 1lo Yft"EdauLFmOrbs 1 3 03w1 1 Install Exhaust Fan Curbs 17[D SdMEPI'f.13i6 1 07AM716 0 Set MEP Roof Jacks i7A 17 h 0 CalTapaed Rod l';ad�onBCnd 4 1BdaFA3 13yWA13 _ ® Install Thapered Roof Insulation E Cricketa FstJ PadFTasFags 3 VVIAI D 14M4M © Install Goof Fleshings 17.i1 FmdY�erin 0 14tutMY➢ Roof Inl pection t 2120 �Mar 8 � 3 14trWiD 1BvNFi¢i a] Install Membrane Roofing 3 1gMAl3 2IAMI03 51 Ins all Roof Ballast¢,Walk Pads ' SelBotr�BdT LI't[Dans2 1WA-0 _ 13_TrI @Roof Drains CadisB 3 2NN4YD !21 et Boller&Tanks and Condensing Unit 1217H1 Inciat O>rt a� 2 2yvWYD 11 1 tall Counterll4hinga 1 21 0 ;Exhaust Fans 1TA FstalBciaRprll 5 �Wi3 Install Boller Piping @ Roof 374D Rm>b RAl wdia Lnes 227NWO ® Reroute Refd�erate Linea i7B0 6riial@6�6Caffirsa&Olk@Fdod 3 31R1N76 Electrical @ Boller&'Condenser&Qutlets @ Roof 3710 TedPEig 1 MAFFID3 0� 0 Test Piping 17911 Y�edBoisla CordaserP�'ilg&�i 0 03*FW Inspect Boller Condenser Pit Ing&Electrical 1B30 kuW&L"Bcial-Ftsg 3 03 WPRiD ® Insulate BiLabel Boller Pip fig 2153 PartPdF."&M.--Egw&Rattans 2 IE4FR21 0 PAM _ Paint Roof F aWng&_Mist.Equlp&Platfo_s__© _ __ 2157 �RodBPud� 1 10sAifD 10aA7D3 0 Clean Roof&Punchlist 21A RxtRJiyx:an 0 11l4i7B Final Roof Inspection 60e Final _..r.f Inspection site fiul»lnsltoDodtFveaDleh 3 211MQ10 2ZW433 ■ Re ocate,Loading Dock Area Draln 40M 1 2ffi3301 27131B1 Layout New Mai Dnry Wall 40q Is61MasoryNFd6 2 23TM 27FEB03 i Install Masonry Walls 40M GutIvisa of 1 2ffEBM Tf Grout Masonry Wall -0NO BwnMas l 2 014-FM OVAN103 0 Brown Mesa 4080 FJFSF iah Coat ry Wall _._ —_ .._._ 2 611� �'�� 9 E.I.F.$FInI h Coat i 4Di0 Br1d16Carq;rlTradrl:orrlsl 3 AIM1T1 2VJNU3 !, 10 B ckfill&Comapct Trash Compac r Walls 40Mrya�gePna;�bm Crd� 2 2f�1N703 NuWCD - 0 mde Site Area$lab on Grade 4000 is" Rertonixg 3 Z7A4U3 31WAFO ! i oil Compaction' Install Concrete Reinforcing --out 4 of 11 ffr Activity Drill Early Early 2003 Deacrlptlon Dur Start Flnlah ""n� AW gxrYn _ - _ _ 0 01AFR8 Reber Inspection Khchen � Rat@f�,v Lod�aPoa'n 1 1U� 10�03 0 Construct Temporary Protection @ New Locker Room 0 BAN R , afe ElxYir�l.R-Uv&Sp' 1 � ®iKitchen Black 2740 0 Make Safe Electrical,Plumbing$Sprinklers Rrtid Flrods&Fxag CoU R.Ey{sruy 1 31M^7�3 2f3V�^1dD li ZA0 Tetp.i-ghing 1 2HVJVaID 2HVAR73 0 (Protect Hoods&Existing Cold Room Equipment Z� em `-�Td u 2 31MW,03 01pPFd73 0 Temp.Lighting__ 0 Demo Ceiling 2� Deno CoigWaIs@Oke 2 31MAFW 0IAR;W 0 Disconnect Kitchen Equipment 2 91MNui l-M 3 U Demo CeilingNValls @ Office FAO lafailkrlaguari Flrrbtg 1 31M4913 31hN%l3 0 Lay-out underground Plumbing 3ii0 PrL�tb Ktltai Er}tFrrni 2 31NJ OIA°f373 U Relocate Kitchen Equipment lumb 2370 Frare lcdaRvn&Cdi Rqi Wal 1 OVW�i OTAPFM a SanWRF UG 0 Frame Locker Room&Cold Prep.Wall �0 DermO=� UGntrg 1 01A� MA913 Sawcut Floor U/G Plumbing 3ZD Set HaidxvL Rnt+g 1 0 Demo Concrete @ U/G Plumbing 1 6 OIlt� i O Set Backflow Device 41ig kfftal Now f2ad CPanelsRFpig&RzaaeTtl 6 O7A4dT3 f Install HWS&R and CHWS&R Piping 8 Pressure Test ® � Irstal Nlev Fla9rd Party 3 tplPFd➢ Wt°R73 27B.7 O.ehmdFiJFFI; li❑ Install New Electrical Panels 3 Q fd� M*R03 :❑ Overhead HVAC 2FS1 Ya;tal DarFrarrrs 1 02� � 2731 [ArnRd' 110 Install Door Frames 2g0 O,`alyxrl Fm 2 fP�3 D i❑ Demo FRP 3 024PTYl3 O1sPf '❑ Overhead Sprinklers 23Plumbing �00 Oual�Rnhg 3 MPFR13 OUPFC3 Fire El Overhead Fire n/0 Et�i�llG Rrrtig 2 OUv4d13 03Mix13 g 37d7 kdal lJav Freez-r().&C io Pad 2 ❑ Excavate U/G Plumbing �0 Istal lAG PtrrbixySH FisSrkvAais 2 gy>� gy, if] Install New Freezer Door&Closure Panel �40 4 O_iSV'iaers g UtA ❑ Install U/G Plumbing/Set Floor Sinks/Drains 2tTD hgtodQll Rntig g IYJAdg !Q Inspect O/H Sprinklers 210 1upw jGRntag --- -_-- p —MVR ---- li®Inspect O/H Plumbing ZiLO 2 !,®Inspect U/G Plumbing 231p 541R-'-gVwdn 0 wpm 1 EJ Backfill&Compaction i 23A Ragbn Electral@ Wal 2 � R 'fHARd� ©O/H Plumbing Inspection O.al>�1 Elxiral FFCB ❑_Rough-in Electrical aQ Wall �lrrhg F1+g ----- - 3 glAR3D_ -0 - Insulate Plumbing&HWS&R and CHWS&R Pipinl -- 3140 ta4d &Hvvs Red a*vs&R ❑ Overhead Electrical _ZW EWIkjWJ1.jufrvt g - ®Soil Compaction arn Dry alWals 2 - ®Electrical Wall Inspection 310 Path Ory+ral 1 LB^fi311 ❑ Drywall Walls 27d1 PorConeb@UGRntrg Tradrs 1 0 Patch Drywall O6oIldI3 /H092I3 . YOHI-k/pC&µn5g {�yc�}y �� 0 0 Pour Concrete @ U/G Plumbing Trenches Inspect O/H HVAC$,HWS&R/CHWS&R Piping Overhead 2960 4EpelQ1-I Elam" g 03andTi 4137 Frarre&Qynel FiadLiis@Rz�oQrs 2 tONidTi 11AcFdTi 0Inspect O/H Electrical 3010 Tape,Fbal&Frish 0 Frame&Drywall Hard Lids @ es rooms 3 1M4 - 1fi�W3➢ N Tape.3f70 Skin CodE. Wa6 -----'--- 3 ---igapRTi 16Wd73 Float&Finish 3YO Seal Weis 2 1f -FM 17/� ❑ Skim Coat Existing Walls 0 Seal Walls X60 Part Wals•So%&Hard Lrl Cefay 2 17A4dD I 1flsPFdA Pain[Walls,Soffits 8 Hard Lid Ceilings p ' Sh« 5 of 11 Activity y Orlg Early Early ID Description Dur Start Finish 7dl C2880 ea.cT'6Fbo�ig@Reimrs 2 17PA701 1gnl=(yp ynal Cekg GrdSCeigWres 2 1&WZO 21F�fiTf - -- -- _ Y Ceramic Tile Floorin Restrooma 239) IrsCalTold Fuiras 3 Install Ceiling Grid Calling Wires �M 2 insW Cat Dfi�ers 2 M%FAm ZiK{701 Install Tollet FixtuiIas 10 Foe' 2 27APr�1 23^FT� ■ Inlstall Ceiling DIHOsaers 2ID � 1-� 2 27MF1p 23N _ ■ Install Light Fixtu a �� Feral Ceig DiryCo� 1 27PFRT7 71PFTiL3 - ■ InnfallS rinklerH ads 2Ti0 l '�lTW 0 23^ 1 In�fall Calling Dro Cords 1 21WT73i 21N7C0 I Inspect Overhead or Cover-up j Irdal Ceig Tla 2 21^A376 �^AiB 1 FOnergiea Light Fl urss 20 ts41Toi9Aoa�niaa 1 214M 2NFTm I i ■ Install Calling Tit 3070 Be p 'Ca r 2 -_-.___- __—.___�____ _________ ___ 1 1=IIRuI out Floodo �—Toilet Acce- 3JA Rep 'Ca 1 23 ■' Bead Blast Flo r 3030 Fd�as Floot9 5 2YPR)3 1[ Pro 3 Caulk F oor 3A7 FstaIFRP 2 (BvtAYUi O7tv1A\TD g 30 irstal Conaguard, 1 O1M41L0 (Rtv141t13 ■ Install FRPiI 3M SE(NdnEgVnal 3 �JAlII3 12JA1>D - - -- -- - -- - _ __1_Inslali Cordarguarda 3110 ElemiralTrim 2 OBrtiq}p3 tBv )103 _ -- --_- - - --� -- Set Kite,an Equipment 3110 P1rr6ip Tdn 2 [UMlt10 OETMYDi Electrical Trim 31M 1'Iu1Wkkjer4#_t 3 0MTM 13Mt M ■ Plumbing Trim 317D ❑mmp&Px d A Hook-up Kitchen Equipment _ 2 12v14W3 13v1A1m 3190 p t,"n 0 � -- --- - - ---- -..- 1 P _ ___ City Insa c la nehllat 0 t4lvlAym - - - __. __ �� 1-1ae1r DeFrelna'1Yryadrr 0 19AAA14i � City inspection ClyFrd asllh arlmant Ins ctlan 3210 joadeabof tiY 0 1 1 mN m City Flnel Inspection Phase 3_Cald Prep Certificate of Occupan Interior MO FI r DdTjij6lQierEq-hrert 2 31AWi00 321D Nd®Sala B3dLalRating SFm Remove Dlsh 'Sher& Kilche Equipment cy Spt�a 1 31MIM 31"111 3260 C PFLnHg@Udv685{ra 1 31MAR01 31NIARW Make Safe Elf trical,Plumbing a Fln Sprinkler 3H0 Darn Ceigs 1 01/PFiTf OLVTa3i Cap Plumbingl�I@ Dishwasher 3M DaroWalBFtxrTie 2 OLWiD MAPR0T3 Demo Callingk 3TJD DoncDllroe Wirb� 1 CpN-TiA ..____-__._____ -_____ __. _ ____ ___ -__ Demo WallA Floor Tile 3ti0 HcuC/th t7a�®I Wal 2 03�Ff{D Old g Demo Drywall Walls for MEP 3W 1�d RjrtrgWal 2 03WF B OSNi7B ■ Rough-in Electrical Well 3231 Lapillrlrg¢W puTbro 1 036FFM 03WR13 ■ Rough-In Plumbing Wall 323) SawiRxr@UGRrrtig39rrp 1 0 1 Layout Un Ijrground Plumblprvwpll 300 Oaro(h'orb@l1GRrrfigd3np 1 OS^fii73 OWf�i _ - -- ----- -- - -- -__. _ _ _._ _ __ 1 Saw_t Floor T�U/G Plumbin6 Sump 3ig1 O.eheed FNACdFt�fgrNmlhee 2 OY4{m 1 Demo Cone b @ UIG Plumg 3 Sump 3300 O.eheadl FieSpHfas 2 0349 11iM�00 ■ Overhead H AC 6 Refdgann Unas 31W O,eleeacl9riii�ll 2 R3^FTi70 Ol^Ai)3 ■ Overhead F re Sprinklers 3110 O.eferalftntrg 1 11T'Fii73 03FJ'RtD ■ Overhead Electrical 3310 6mr�UC RnI}g69rrp 1 0� 0�.W 1 Overhead PI II mbing 35D hspeaC*jPbTb.FU 1OtNTm CMAFFE3 Fxcavab A Plumbing&Sup 33D Elac"Wi icye�n 0 a7AP 03 0 Inspect O/H!PlumbingRrrtig WalFgredm 0 07APFCS Electrical Wail Inspection PcprslP¢pmi'eaL3n&C1yra1 1 Q/F4171i Q1 Plumbing Wall lnapectlon a1r i - Sheet.fi of 11 Amy AcliviH Orlg Early Early 2111 ID Description Dur Start Finish �g ��FUeI&FiFh 0 07A9U Screw Inspection aPa. 3 Ulsfim Tape,Float R Finish 3?m Ie81l1G NntiigSat Rov5ri6,AaFs i 07A9;M W!•PRfD Install UIG PlumbingfSet Floor Sinks/Drain j 1 347 I�adO} WAC 0 67N 1 Install Sump Trench Angle 34 0 35CD inapedohiSPIId" 0 WPFfm In OM WAC 3WO I�OH�ksl 0 07PPIm Inspect O!H Sprinklers � h"CWno rF9.eea Inspect OM Electrical �F�est 3 OB'AirA 10Nim 3330 IgndlH3flrrtip Install Cold Room Panels 3 Equipment p MINITio3 3M BadA&OurfadU 3FIumb g 1 09MflO3 O6NiiTf Inspect UM Plumbing �Ortrp�fm -- ------- --- ---_ ____. _—__-_____0 Backftll 6IICompect UIG PI mbing 3m 0 QYFFM Soil Compaction 31N RuBackCnoEsa@Ul3phftTmdM&S p 1 03N� OBePFm P our Back Concra @UIG Plmb' Trenches 6 Sur 1j, 1 39M pry®T®Tnrdtpais 13 1 10433M 1044U 0 Install EYaporator d Refri emnt Piping 3EM Istal Odd FlarmTgFiigSbb 2 10NFm 1tNFm 0 Set Angl?s C Trench Drill s Install_CppId Room Topping Slab —1 __Ft4PF03 W Test FAigaakorpCiV 1 1VFF403 itNim 1 Install Ceiling Grid E Celiing Wires I M Band Bladftror 1 11NFm 17NTm 1 Teat Refrigerator Piping 3791 Iutal Ceig Oifisers 1 1,1,E 146pr 3 1 Bead BlIret Floor 376o iretalLightFA.. 14NFi@ 0 InstalFCelling Diffusers 3770 1 14'Yim _0 Install,L_I ht Fixtures _I__ — Fs4l�ridsFk� 1 14NFm MNFm - -_ _ _ -_ _ g 3780 hsN 0 Install Sprinkler Heads, 37W H k CoHpmn 1 14N'Fm 14�iFm 0 Install'Ceiling Drop Co ids mpg F4a1SprH @C bHcan 1 i4N-fib 1MFTm 0 Hook-up Cold Room Lights 1 1NYi7� 14M7713 0 Installi5 Sprinklers Cold Room 3®D reliedpefiJa-akn pf+6 0 44NTO i � P � i ' 3E3 hsped(>"1Wd LrCa -p 0 i5N-fiTi -- - --- - ---- - - - _ . ♦Inspacl Refrigeration Piping M10 Instal CeT"g Th 1 1SA'-Fan 15NTm InspeC Overhead for Cbver-up _ BU�s Light FDtmo 1 WIM 15N'PoD 1 Install I Calling The 33U P�BCakF7ov 1 164Tm 16N1T13 1 Engerglze Light Flxturds 319J P� Fbo @ 3 I&Vfm 18^FFT 3 0 Prep n Caulk Floor ZliiT IstaIFRP _—_ _ ___ _____._ _._ OI Ruinous Flooring_ 1 27NFm 21NTm 0 Install FRP Epp F- Ts 2 pmMPM 01 S�t Kitchen Equip ant RsriigTrin 1 ?1lAm 1 El;ctrlcal Trim 3® Iubl�� 1 76NFm � I4I 0 Plumbing Trim 3)70 FtrktPl4hatEr}pret 2 23�fFm 21N{m - _4. - ------ - - — —.- -- - � - -- -- -_- - -----1 Install Comer us ?� �[W dFrdiil Z Zi^IFm 21P1�m 0 Fiook-up Kitchen qulpmenl 39M t]ylpedtyr 0 0 Cisan-uP&Punch let 3970 Bash Delalrort lepeyr g y City Inspection M ClyFrellq�erf7i g 2 Health Depadm at Inspection Clt Final Ins • tlon_ 3�7 CortLGadOmWoy 0 �Nl(A ._- _ ._—__ ____ __ _— ___- - __- __— ._ _ __ -___ _ .-___—_.. _Y. _- P._- - Roof Certm-1-of O u en 3870 LffNtpodCagaeB3r5 Cadvg °r 1 oNFTm 01,41' 3 i La lout Roof Comp essor d Cond naing Platform 3® Oornivd(QZ TIah 1 0 Demo Root Tie-In al 36i0 lydcwto svd Cm�ra Piffim 2 o3r+Ffm OVJT(D nalall Compressor d Condensl g Unit Platform 0 3040 Sdi�lidJadm 1 OFAFFm WA4TD 1 Set MEP Root Jacks 3� � Z LEAP 0 Patch Roof She 7 of 11 .- Activity Activity Orlg Early Early ID Description Dur Start Finish 3B® SelCmprmurd CarHdglk� 1 l(WM 10VIRM 3670 Rripaakn d Caffireie Dan PVrg 2 1iN-TT03 0 Sot Compressor a Conde sing Units Refr gorallon a Co donate Drain PI big TeAPpkg 1 15IPF'03 iSe FM 6M Fspedpfpry g 1WR33 1 Test Piping 3E0 kadataatabd Prig 2 16'FRm 17lFRD �InspeCt Piping 37 ��e 1 1[i^7T� 18Y;70i - _--__ _ ____—_... _. __ -__ -_ ..__ - __.._■ Insulate a Label Pipi 3737 CNa Rcd&P dig 1 ZWF E TW7TII1 1 Paln[r Platforrns Springs Meeting Rooms 0 cldan Roof a Punch[Ist Roars Demollllon a Grading1 4Eades 2M ���� 2 0946 3 10Wm ■ Install CI rldor Berries a 4210 � � 2 Q7W,gi 10L�I413 ■ Safe OHprinkiera 2 /HyVyD i0YV4T1 ® Safe OHecbical 4100 Instal Sin Ca hdln FertrQ 1 myNN C&Y448 0 Install SitConstruction ancing 4250 poruOl AC Pns 1e 13igQ 31WyD ® mo Springs TI eeba Area � �� � 2 2LNt� 27,VM emo OM WA Springs Theilan 4'itl DmoFNAC4a®Omar 3 2tW[n 711NN33 ra = ;Demo HVAC D�` BaOr� 1 21WAC32iW3D4M tffiITmFuayt 4*g&puMr 021N1•t13 0 Remove Steel Bog qag Farroeasti�AHA@3tro.ABA� 1 27� �' � Install Tempera Lighting a Pow 43N Swc l Rar - _ _ 1 Remove a Saiv go AHU'a(�Threeere Area _ t �NYLD 0 ~Sawcut Floor 4310 RaroeGrnab(g1Ftu 2 2614,133 29PM � 4337 CamlibeaiuAm 1 30yVI8 30yJJCD f0 Remove Cone ate @ Floor 0 Clean Theatre Area Structure ' 4333 that Bad■Car4mao-ao Saidbfnei 5 31.YM 1 4310 fblCmpain 0 OBE Import,B ck3i1,Compact Grade Sand MriaHal 437U Floe Re6aWA.rir Z lTli� 1�CD Soil Com action i 43� Fatal llG�erSt21 v Install ebar Dowels 0 11/F� 7Qg¢i Install IG Electrical 43� kIAG E�did 0 e 70� _ InaP_clU 2 1IF 1y-®p({ .(G Electrical 43D f�arhperfri t 0 Install bar 44m FLr3a7m( 13 3 13� Rebarinapection g410 tdACpaabloWd add Beam&aal-g 10 1 2/F 1 Pour, lab on Grade won 4433 Se(CpauWVV lTodk 3 29FIM03 1NN Install Openbl Wall Steel Beams a Bracing 44D Necks,-%xWSbd 2 - -- - -_ _ _ _ . . _ _ _-Set Operabt_Wall Treck—..__ Interior ■ Monokote Wdunl Steel 4440 laycilkeaiorWaBaCags 1 O71vWm 4510 Fdal O,edmd gaotiyal 5 U/NAF103 1 1 Layout Int Nor Walls a Cal Inge 44A kdal(1-h-dWACaCariir4Awik Install verhnd Electrical 7 171AM1^FiD t7kNYiD Instal Overhead HVA a Corridor Due work 4® Fdal FseSp`ki�rOH Ppkg,OopeaP.T. 5 D7IVWim VANI' i 44M Sao��Wad SbdvAh bfot13d Rmg, 3 C7M^Pt8 11MWM Install Ire Sprinkler OtH Piping,Drops 1,P.T. 4533 PweiarWals&uarnerwab — - ------- _____ ___ __ _ Box-In fable Wall Sled with Metal Stu Frmg. 4 iINAFiI; 13rWD3 11 Frame Ise.Perimeter Walls d Corridor ells 453] FpertOH Fro Slrkidas 0 13.1M373 ' 4510 kgrectOHElariai g 13ViYa; Inpacl IH Fire Sprinklers 4fLg Vyal aCmidrTurd Ftarre6F�edixi g 13.W�i Inspect Electrical 47A ��' � 3 13� 17WM ®Walt D oorrlldon tunnel Framing InspecQon Sher Sof 11 • -- AZI°hY --- ---- Activlh' Orl9 Early Early ID Description ❑ur Start Flnleh 46W Rgm DrYMelCarldnr&B,:FalR. 4 14NIARM 19VAAU3 ® .74 . 45Akai Wal Drywall at Corridor a Electrlc�rl Room t>peolOHHVP�G�Hr 4 1NvY>♦-� 1BeiWm ® Elec rical Wall Rough-in 4� 0 17MWII3 ' QSD Frarkg Cdr� 7 tRvV47D � Ins OM HVAC 4500 Elail®I W:iY i nming Collinpa 46f0 kn�6WaN 4 2NN 23vW370 Elec lcal Wail Inspaglon IM I sulate Walls 4610 Sol 6eryim'Dw,ri�t Coe 3 24vy�A03 Z/f✓W7T3 � . 453) 4yMVVaKCardxP&h&Turd CrnHv m at Electrical Downllghl Cane 5 27vV4-iD OW17N Dryw 11 Walls,Corrld r Patch a Tun al Corridor 4t� Sphi�Ogs(�Had.kk 2 23vV4iD 77MWYIi � 4851 Ceiling Fmrryg r 0 0 pdnkler Drops'a Hardl-lds ----__ _. ___ allln Framg in Ina ectlon 4670 DrY+'/� '6s 5 Z/MWTD 02/PRO3 —._—� _9—_—_ 1 P____ q® Waisaaw ��l 0 OVFTIIi -1--- ---- Drywall Callings 489D CBip Saei�ke{.�edm 0 Wall Screw Inspection 4II10 Tape,Fbal& ch 11lRTS Ceiling Screry Inspection 7 4710 Pai-A Cekxjs 5 03W'IT1i 15Pli�1 M Tape,FIQst a Finish - 4M trial Don^y Fremesa FknMae — -- - -_ __ _ ___ —._____.__ __ . _____ __ _ _ If7 Paint Calling, 3 00'F1903 1 V�AiA -..-- - - 4 %W'i� 15W�Ud ® Install Doors,Frames a Hardware �� tshlWhod8as3aR�taior Rol ® irotnll Woad Base a Presentation Rail 5010 RepakBase a Fkxrkg®CarbxDocre 9 14NTO3 1CW Re alrBuea Floes n 4790 Fmetld Ce7ng Gdi 3 1G^Rn3 18W7D P g@Corridor oars M m Accuslical Calling Grid 4789 Wafasig 3 18W13O3 1BWFM 4010 Fda1L'gbtFoSr,QSe,im Cmih 1 16W'FiOi 1G^N700 _ _. - - — - -. ® Walicoverin a --- Install Light Fixtu es Q Service C rrldor 0 4W9 �SM�1-� 2 164PFC3 171VMD3 41320 halal Ceing Dtlheus 1 1 18N93D3 0 Install Sprinkler Heads 41D1 PaiiW�.Doan Bases RaB 3 TIAPFM 2Fl 0 Install Ceiling Diffusers 40 k;iiL ohzasQa A—&A 3 2LWTi01 Z3W j Iles Paint Walls,Doors,Base a Rails 47dD FdalSazdWalParT; 5 2t4PFA3 - --- { _ _ - - - _ - __® Install Light Fixtures @ Acoustical 4510 kedlCeSgD'/Gsas(p?lmafid Goings 3 21NT7D ZWTiD Install Sound Well Panels 46M Fda1Sp1n <iHaed QAoc,, dcak s 3 InstallCelling Dl 2WT173 ffusa rs(�Acoustical Callings Ins II Sprinkler He Ids @ Acoustics)Callings N ! 40M Seelgm Light 1 2LWi7(D ?7NT170 f� � � 4tID 1 Sasi Concrete Brergas Upl Foalas 2 23MR03 21W'RD3 4�7 lo;WRb6aB�@Seale Curkky 1 Z3^ITiU -- -- - --- - - - - _ nergiza Light Fl tu_res________ ?3W}� Install Rub r Base Serlv Corridor 0 4SiD kzpedO.elxedkrCoxr4xr 0 -- 4880 Install Cdkg Tie 3 Zi'JACD 2 Inspect Overhead or Cover-Up 47A FJa4irdl Trim 2 Install Calling Ile 7.r�FTiD m 4 Electrical Trim t71t1 �C g 5 298FFE3 O%A)00 I _ _ _�_ Install tin � c�� 3 � � Ot3.M1i0 Install Opera le Wall Panels r® --- 4Bt0 CleaMpa Flndtel 2 OBJAM 7 M P 0 Clean-u aPunchlist 49fD CryFrd r 0 OVIVAM P 4!W CalexsedOrupary 0 C➢M411D City Final I spectlon Roof Certlgcats f Occu an 44M laMRodParvk*eaTe-hL,xduc 1 MAIM tOVYJYTi 4B9 � N�gCo?ShsIPOC9Tioke 1 Layout R f Pete tntions',a Tle-In Locatio a 3 11MW>DO 13V FM S Demo -- ng Steel POCL Tie-Ins 4177D DarpEIFS@Tehl�e 2 11MWO 12dW7[D i Demo ELF.S@Tle-In Locations 4E Oi IRdOperrgsfa Qtlnak 1 74M^Fi73 74MW7N 1 Cut-In oof Opsninge for Ductwork `.lbapQrMtdt 1 171 17MW703EM 1 Stub-ApDuctwork irdail ,s�aw-uaccrdaeaPNhmc 7 1edW-u3 - -- -- - - - - - - - — - -- - 27Jt47¢l Install Mec Screen a AHU Condenser PI Norms 5100 C Pdk Rasm re 0 MAIM i Clear Public Redrooms ShePt9 of 11 - 40ft Activity Orlg Early Early ID Description Dur Start Flnlsh 513D VYdlrg Inspection 0 23MRC3 aiding lnapectlon �D `.HfrH'pcdJada 1 in -V7B 9trWYTi 1 t MEP Roof ctlon 8�10 SdA}U&"&Fun&C rd. 1 27AN•FiD Z7tvWli➢ 0 el AHU,Exhaual Fen&Condon r 5170 C�P�ERaslarrs Jacks p ZRJA•FiB . _ - _Condo_ � "RrdWAC&ftubirg PlliU&Va6 5 g� tear Public Restrooms tidal p&UwanlLynas 2 214411 i 3114AF ll WINInstall Roof HVAC&PIumbin Piping&Vents Slit) Frarne Much Soeon Install Refrlgeranl Lines 2 21ANU 31KVM �i t37H7 I dd RodDDAwkSardT &F1B Frame Mach.Screen 61g1 �giae 6 3rNViCD OYFTiN Install loot Ductwork, and Traps&Flre Dampers ME Frerrtg fNroc�l 0 - 51C IneWCom iBoad@Modr Soeen 2 (Tt* FW Framing Ineprctlon 5131 �p� Install Cement Board Q Mech.Screen 9/9an@MahSaear 5 03MFO3 CON'Ti3 ._. -_—__-_ _ Sm Te*UWAC&Plniig Pig 3 OV�FSiRi M Install Plaster System @ Mech.Screen WM i�lEl0dU31@EcM-ai&S-. Q�b 3 pV jjV ® Testing HVAC&Plumbing Iping 51M Faiit Rxkg 3 01� Q Equipment rid Service outlets t- g @ 2 OV4TU U7APFd3 E u 0 IB^Ad3 Install Electrical 5100 PadrFJFS Ten Crates ® Patch RogSn I ® Patch E.I.KS @ Tlaln locations Sm kww RaofEbdi®I 0 08r47701 Inspect Rpof Piping tYfO kahbBfaW RmlP�ig 2 OO+PI300 1044U Inspect Rpof Electrical Ba Pa"Rod & Insulate&Label Roof Piping d E443Pb7orre 3 1WRCD 15WFC3 Paint Roof Stsel,Flsh'g Equip&Plalfa s m 525) &��is 2 1f� flAPRD 0 CleanRoof&Punchlist ME Frd RadkMdon 0 —TW-FC-3 , Pan Flnsl'Roof lne ectioni Pantry Demolition&Grading 5270 FkbmiaF STrlai 3 ®.NFII3 13WD3 ® Relocate Kitchen Equll�mont 44BO SaiaOi3priidasuri& 2 1436M 1516M t9 Safe Qg Sprinklers i SEE Sob&Cap rid 2 141MIIi i5NM1 0 Safe Oil Electrical 513D SeH&��b� 2 141MYn 1S1MII3 Sa66II Cap Plumbing � 4223 DaroAdrhAm 5 15NFL3 22Y4J03 �_.Ibhw Admin.Am 4210 IxroOHWAC@AdMAw 2 2 M —241Mll3 o 4� roe&��A@AdmAw i LI Dimo OM HVAC Admin.Area 231M1 231eA1Tf 1 R move&Saly AHU's @ Admin Area 4� ��'dTtl� 1 21.Nf¢f 24Y4JA 0 C can Admin.Area Interior i 52M Lars m* 1 WA1sFim WhYr7m 0 LaY out We Is SgO Utcut ak&��' 5 1gvWiO3 14MWII1 i Frame all.&Callings! Laplllffig¢nd Flntrg 1 19MM 1U ARQ 1 Layout iderground Plurirbing _ O.eFra1FNAC& rL}� 5 1U.Wi0i 14WM ® Overhe d HVAC&Refit oration Lines 5ia- Oade ElwiW 4 1W 13AMF�3 -__ —____,.-_- _____ _ -_� Overhe id Fire Sprinkle 4 1UlN�l 13vWTA ON Ov.rh. d Electrical 53D OsteedSam1FIoxQUPhv 4 1UVYi303 13A40 i Overfis d Plumbin T U4inspodw�� roC..b UG�R.UU& P 1 11PA^AD3 11MN773jg Sawcut lour@U/G Plumbing&Sump @ Plehg89rry 2 17MMm IZAAFD3 C ncrole @ U/G Plumbing&Sump 13JN>mY")edOHFim�idas 01 Excava U/G Plumbing6 Sumpa g 13vYJ�3 InspectO/H Flro SprinkbnVgxdOHPuTbM 0 13vWm Inspect OM Electrical Inapecl O/H Plumbing ShePl_10 of11 - a Acg Y Activity Drill Early Early ID Description Our Start Finish MID Pater Bxiiai@ Wal 3 1RJ?AITi 1RvWi03 ' (-0n4-Piumbig@ ® Rau h-In Electrical @Wall SIM 3 1�M^AD3 I-M-W t13 m -!!-Out h-In__Plum_bin Walla _ _SSiD Fe>a111G PIrrhg5A F6QsiiaR.Y,ig 2 ----'------ -- � - -- � ------- 9 Y�edCiWAC 1HvWFm 171vFJ703 m Instal IH HVAmbing/Sat Floor Sinks/ ulna SEE 0 1MN� SM Rarrig l�erfn 0 17t�V•f7CD Inspect OM HVAc '�iU Srt@�Aiml0°^rt¢lCars 1 17M4M 171�YPitii �Framing Inspection 5M h5W Tnn:h 1 Set E ecWcal Downllghl Cans SM I�edUGFlrrUng 0 17tw1^f� 17M^}itD -- 1 Instal Sum Tmnch Angle_ 17IrW303 _ _ - 5 EletiidWal �Fedim 0 1B�NJ7T3 hope U/G Plumbing 4D 54® FlmtigWal ttga{on 0 —----- Electrical Wall Inspection MW Baddl3CarpafllGRnrzg Plu bing Wall Inspection 5510 SOICanpacon 0 1tNN:00 1BVW3¢3 B Bac II d Compact U(G Plumbing MWO 5'� halal 2 12dNi01 22AARM _.__- .♦Soil ompaction 6510 Drywai Ina late Walls S 0 21t�YJ"1D M D all ID Saa hcion VB 6590 Tape,1`10eliLFrr6h 5 27✓.^Fb0 a mw Inspection EM 1"BeaRamPar�3Eq¢ret 5 0Y�6 Taps,Float Finish tM Pail cell 2 01APRC0 3filill -Install Beer Room Panels S_Egulpment__— 65D InsIa1Doo;Fraras6Had a 1 OL4Rn3 OLAPFO3 Paint Calling' '.�D FNaiF?oclladia Install Doom,Frames S Hardwam 1 OVF;',m 01AliiB U350 ICI E✓a{ue1T&PaigalartPp g 2 02APF B 03NT 13 Install Roof Ladder ,IUD 5570 AoasoralC�SGnd 1 Ol�lf116 OS^FRD - - - - -- ---- -- B Acoustical oats ll ical Ceiling rridInst s gnt Plping 5R0 FehI CoU RvnTgp}gShb 1 ONAi03 - old Fixt YffiIL'gFl FMaes 1 WeW2B WPR773il�a Topping lab 157 YffiI Ceig D�xsere 2 0 lotall Calling DlRusaers I SPii�l-Ism es 2 WAA3D aWIRM tiU FbdcapBaaRvnUgFis 1 U/APia3 FAFFU3 11 Install Spilnklar Heads �dD raWSriidas@Bee-Roca 1 Wf Q7 I_________ __--._. ____._ 1 Hook Bur Room Lights'_ EEM InpedomheadirCmer up 0 DB^FS32i 1 1 Install Spr nklera @ Beer Room SB] F1ra�UghtFeryraq 1 � 118 Inspect OYerhead for Cove-Up 57d0 Instal Ce7rg Tie 1 096 F413 GINPRIM 0 Er lza Ight Fixtures 5710 PaiWand Coca q 15AFFE3 1 Install Ceiling The 57m SedCarhb �_ SWalled Doom li Paint 5Td1 SdKabarEq¢ret 3 17AfFiD ZWFF113 0 Seal Foncrete Floor 5740 ElerLiral Trim 2 17,W-fiO3 1tWFi03 t Kitchen Equip ant 5793 piombgTim 2 17AfTiA 18�Aim D Electrical Trim S7fll l-krIr IQhat - _D Plumbing Trim W G1Ptet 3 27l�4TO 2taAQ3 5770 C]naraptSFlndd 2 - -'- -- - - --- - --- - -------- ---._.—_ 0 took—up Kitchen ul ment 57® l'2�rFcperfrr 0 !I Clean-up R Pun hllst 57ED Heah Dan i ertlnspecim 0 MAFM3 City Inspection 59M City ReH-l 0 2Y FC3 *Heaith Departm nt Inspection l CedilimiadOmW y D 2 City Final Inape it., Certificate of Occupancy Sheet 11 of 11 O, PALAq SA . City of Palm Springs a Department of Procurement and Contracting C ' s'�p 3200 Tahquirz Canyon Way • Palm Springs, California 92262 q(�FO R� TEL: (760)323-5239 • FAX(760) 322-8372 • TDD(760) 964-9527 CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO ALL TRADE CONTRACTORS PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 2 This Addendum is being issued for the following changes and informational items: 1. Add Part V Scopes of Work(All Trades): 2. Provided for your convenience: Hard copy of Addendum #1 issued December 5, 2002, and transmitted electronically to all plan holders. Note: Includes anticipated master construction schedule, (All Trades) which is also available on the city's web site. Go to www ci palm-springs ca us Go to Departments, Go to Procurement. END OF ADDENDA NO. 2 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs Harold E. Good, CPPO Director of Procurement& Contracting Dated: December 6, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Scopes of Work (All Trades) Courtesy hard copy of Addendum #1 previously issued. Courtesy hard copy of Anticipated Master Construction Schedule (All Trades) Post Office Box 2743 0 Palm Springs, California 92263-2743 11, h OF PALM SAP/� City of Palm Springs Department of Procurement and Contracting 3200 H.Ta6quitz Canyon Way • Palm Springs, California 92262 Oq4 ro V' A Tel:(760)323-8239 • Fax: (760)322-8372 • Web:www.ci.palm-sprmgs.ca.us CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO TRADE CONTRACTORS (ALL TRADES) PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 3 This Addendum is being issued for the following changes and informational items: 1. Replace Table of Contents (3 pages) with revised Table of Contents, pages 1, 2 and 3. 2. Add: To bid Package#32 - Electrical and Fire Life Safety ll. SCOPE OF WORK F. ALLOWANCES Trade Contractor shall build an allowance of$5,000 (five thousand dollars) into the bid for exterior lighting to be specified at a later date. 3. Add to bid Package#01 - Selective Demolition ll. SCOPE OF WORK B.As further clarification, Trade Contractor shall: 58. After their salvage ofAHU#3 and AHU#6 (by other trade contractor) remove steel platforms, their attachments and supports. Post Office Box 2743 • Palm Springs, California 92263-2743 4. Add: to bid Package#28 - Kitchen Equipment It. SCOPE OF WORK A. Add to "A" §10265 -Wall Surface Protection Systems. 5. Replace: Exhibit"D", Document List, pages 1 through 6 with revised Exhibit"D", pages 1 through 6. 6. Replace: Exhibit "F", Temporary Utilities for Construction Purposes, pages 1 through 3, with revised Exhibit "F", pages 1 through 3. 7. Add: to Qualified Bidders List A. Add to attachment to Addendum #1 entitled "Pre-Qualified Trade Contractors for Trades Requiring Pre-qualification and Attendance at Mandatory Pre-Bid Conference" Janikowski Plumbing, Inc. to Trade Bid Package #29 (Plumbing). B. Add to attachment to Addendum #1 entitled "List of Attendees for Those Trade Bids Requiring Attendance at the Pre-Bid Meeting But Did Not Have to Pre-Qualify" B E Mc Murray Construction, Inc. to Trade Bid Package #4 (Concrete & Reinforcing) 8. Add: To PART IV- CONSTRUCTION DRAWINGS AND SPECIFICATIONS as attached. Section 08110 Steel Doors and Frames Section 08211 Flush Wood Doors Section 08305 Access Doors Section 08331 Overhead Coiling Doors Section 08710 Finish Hardware Section 09512 Acoustical Tile Ceiling Section 09651 Resilient Tile Flooring Section 09900 Painting Section 09775 Fibreglass Reinforced Panels Section 10660 Operable Walls Section 10265 Impact- Resistant Wall Protection 9. Informational: Attached Requests for Information with responses by Architect and Engineer. Numbers PB #01 - PB #22 10. Delete Bid Package #9 Doors, Frames & Hardware from the Notice Inviting Bids dated November 11, 2002. Perspective bidders for Bid Package#9 should contact Director of Procurement & Contracting 760-323-8239 for additional information. END OF ADDENDA NO. 3 BY ORDER OF THE CITY OF PALM SPRINGS City of Palmy Springs { Harold E. Good, CPPO Director of Procurement & Contracting Dated: December 12, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Revised Table of Contents (3 pages) Revised Exhibit "D" (6 pages) Revised Exhibit"F" (3 pages) SK-1 (2 pages) Additional Specifications as referenced in Item S above Pre-Bid RFI Log (2 pages) HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 TABLE OF CONTENTS DIVISION 0 - BIDDING REQUIREMENTS To be provided by the City of Palm Springs DIVISION I - GENERAL REQUIREMENTS Section 01010 - Summary of the Work Section 01040 - Coordination Section 01045 - Cutting and Patching Section 01050 - Field Engineering Section 01200 - Project Meetings Section 01300 - Submittals Shop Drawings Product Data and Samples Section 01400 - Quality Control Section 01421 - Reference Standards and Definitions Section 01631 - Substitutions Section 01700 - Contract Closeout Section 01720 - Project Record Documents Section 01730 - Operation and Maintenance Data Section 01740 - Warranties DIVISION 2 - SITE CONSTRUCTION Section 02060 - Building Demolition Section 02222 - Excavation Section 02300 - Earthwork DIVISION 3 - CONCRETE Section 03100 — Concrete Formwork Section 03300 - Cast-In-Place Concrete DIVISION 4 - MASONRY Section 04200 - Unit Masonry DIVISION 5 - METALS Section 05120 - Structural Steel Section 05210 — Steel Joists Section 05310 - Steel Deck Section 05400 - Cold-Formed Metal Framing Section 05500 - Metal Fabrications Section 05810 - Expansion Joint Cover Assemblies Revised 12/12/02 Table of Contents Page 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 DIVISION 6 - WOOD AND PLASTICS Section 06100 - Rough Carpentry DIVISION 7 - THERMAL AND MOISTURE PROTECTION Section 07210 - Building Insulation Section 07241 — Exterior Insulation and Finish Systems — Class PB Section 07533 — Single-Ply Membrane Roofing Section 07716 — Roof Expansion Assemblies Section 07720 — Roof Accessories Section 07811 — Sprayed Fire Resistive Materials DIVISION 8 - DOORS AND WINDOWS Section 08110 - Steel Doors and Frames Section 08211 - Flush Wood Doors Section 08305 - Access Doors Section 08331 - Overhead Coiling Doors Section 08710 - Finish Hardware DIVISION 9 - FINISHES Section 09253 - Gypsum Sheathing Section 09255 — Gypsum Board Assemblies Section 09310 - Ceramic Tile Section 09571 -Acoustical Tile Ceilings Section 09651 — Resilient Tile Flooring Section 09671 — Resinous Flooring Section 09680 - Carpet (Owner Supplied and Installed) Section 09775 — Fiberglass Reinforced Panels Section 09900 - Painting Section 09841 —Acoustical Wall Panels DIVISION 10 - SPECIALTIES Section 10265 - Wall Surface Protection Systems Section 10660 — Operable Walls DIVISION 11 - EQUIPMENT Section 11400 — Food Service Equipment DIVISION 12 - FURNISHINGS - Not Used DIVISION 13 - SPECIAL CONSTRUCTION - Not Used Revised 12/12/02 Table of Contents Page 2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 DIVISION 14 - CONVEYING SYSTEMS - Not Used DIVISION 15 - MECHANICAL Section 15000 — Mechanical Specification Section 15300— Fire Protection Specification Section 15400— Plumbing Specification Section 15855 —Air Handling Units DIVISION 16 - ELECTRICAL Section 16010 — Electrical — General Provisions Section 16110 — Raceways Section 16120—Wire and Cable Section 16140 - Devices Section 16170— Low Voltage Disconnect Switches Section 16181 — Low Voltage Fuses Section 16182 — Low Voltage Circuit Breaker Section 16450 — Grounding System Section 16460 — Low Voltage Transformers Section 16471 — Branch Circuit Panelboards Section 16472 — Distribution Panelboards Section 16485— Motor Controllers Section 16500 — Lighting Fixtures Section 16520— Lighting Control System Revised 12/12/02 Table of Contents Page 3 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer ARCHITECTURAL A0.01 HNTB Sheet Index, Directory 10/30/02 A0.02 HNTB General Notes and Abbreviations 10/30/02 A0.03 HINTS Partition Types 10/30/02 A0.05 HNTB Accessibility Details 10/30/02 AD0.01 HNTB Demolition Plan and Section-Kitchen 10/30/02 AD0.02 HNTB Demolition Plan and Section-Springs Theater 10/30/02 A1.00 HNTB Overall Site Plan 10/30/02 A1.01 HNTB Overall Floor Plan 10/30/02 A1.02 HNTB Overall Existing First Floor Plan 10/30/02 A1.10 HNTB Enlarged Plan- Kitchen Area 10/30/02 A1.11 HNTB Enlarged Plan-Meeting Rooms 10/30/02 A1.20 HNTB Enlarged Roof Plans-Kitchen and Meeting Rooms 10/30/02 A1.21 HNTB Enlarged Restroom: Stairs and Ramp 10/30/02 A2.01 HNTB Exterior Elevations 10/30/02 A2.10 HNTB Building Sections 10/30/02 A3.01 HNTB Wall Sections 10/30/02 A3.02 HNTB Wall Sections 10/30/02 A4.01 HNTB Roof Details 10/30/02 A4.02 HNTB Miscellaneous Details 10/30/02 A6.01 HNTB Interior Elevations-Kitchen 10/30/02 A6.02 HNTB Interior Elevations 10/30/02 A7.01 HNTB Room Finish Schedule 10/30/02 A8.01 HNTB Overall Reflected Ceiling Plan 10/30/02 A8.10 HNTB Enlarged Reflected Ceiling Plan-Kitchen Area 10/30/02 A8.11 HNTB Enlarged Reflected Ceiling Plan-Meeting Rooms 10/30/02 A8.20 HNTB Ceiling Details 10/30/02 A9.01 HNTB Door Schedule and Details 10/30/02 STRUCTURAL S1.01 HNTB General Notes 10/30/02 S1.02 HNTB Typical Concrete Details 10/30/02 S1.03 HNTB Typical Steel Details 10/30/02 S1.04 HNTB Typical Steel Deck Details 10/30/02 S2.01 HNTB Enlarged Floor Plan-Meeting Rooms 10/30/02 S2.02 HNTB Enlarged Roof Plan-Meeting Rooms 10/30/02 S2.11 HNTB Enlarged Floor and Foundation Plan-Kitchen 10/30/02 S2.12 HNTB Enlarged Roof Framing Plan -Kitchen 10/30/02 S3.01 HNTB Sections and Details 10/30/02 S3.02 HNTB Sections and Details 10/30/02 S3.03 HNTB Sections and Details 10/30/02 Page 1 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect Description Date Drawing No. Engineer MECHANICAL MO.01 HNTB Symbols, Abbreviations, and Notes 10/30/02 MO.02 HNTB Mechanical Requirements 10/30/02 MO.03 HNTB Mechanical Schedules 10/30/02 M1.10 HNTB Enlarged Kitchen HVAC Floor Plan 10/30/02 M1.11 HNTB Enlarged Meeting Rooms HVAC Floor Plan 10/30/02 M1.12 HNTB Enlarged Kitchen HVAC Roof Plan 10/30/02 M1.13 HNTB Enlarged Meeting Rooms HVAC Roof Plans 10/30/02 M2.01 HNTB Mechanical Details 10/30/02 M2.02 HNTB Mechanical Details 10/30/02 M2.03 HNTB Mechanical Control Diagrams 10/30/02 ELECTRICAL EO.01 HNTB Symbols List,Abbreviations, and Notes 10/30/02 EO.02 HNTB Partial Single Line Diagram, Light Fixture Schedule and Title 24 10/30/02 EO.03 HNTB Panel Schedule & Load Calculation 10/30/02 E0.04 HNTB Dimming System Riser Diagram 10/30/02 E1.10 HNTB Enlarged Kitchen Power Plan 10/30/02 E1.11 HNTB Enlarged Meeting Rooms Power Plan 10/30/02 E1.14 HNTB Enlarged Kitchen Electrical Roof Plan 10/30/02 E1.15 HNTB Enlarged Meeting Room Electrical Roof Plan 10/30/02 E8.1O HNTB Enlarged Kitchen Lighting Plan 10/30/02 E8.11 HNTB Enlarged Meeting Room Lighting Plan 10/30/02 E9.10 HNTB Special Outlet Details 10/30/02 PLUMBING PO.01 HNTB Symbol List, Abbreviations and Notes 10/30/02 PO.02 HNTB Plumbing Schedules 10/30/02 P1.10 HNTB Enlarged Kitchen Plumbing Plan 10/30/02 P1.11 HNTB Enlarged Pantry Plumbing Plan 10/30/02 P1.12 HNTB Enlarged Kitchen Plumbing Roof Plan 10/30/02 FOOD SERVICES KO-1 HNTB Notes and Symbols 10/30/02 KO-2 HNTB Construction and Installation Details KA-1 HNTB Equipment Plan 10/30/02 KA-2 HNTB Building Conditions Plan 10/30/02 KA-3 HNTB Plumbing Plan 10/30/02 Page 2 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer FOOD SERVICES (con't) KA-4 HNTB Electrical Plan 10/30/02 KA-5 HNTB Refrig/Ventilation Plan 10/30/02 KA-6 HNTB Equipment Elevations 10/30/02 KB-1 HNTB Equipment Plan 10/30/02 KB-2 HNTB Building Conditions Plan 10/30/02 KB-3 HNTB PlumbingNentilation Plan 10/30/02 KB-4 HNTB Electrical Plan 10/30/02 KB-5 HNTB Refrig/Ventilation 10/30/02 Exhibit D Continued on next page Page 3 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 1 —GENERAL REQUIREMENTS 01010 HNTB Summary of the Work 10/30/02 01040 HNTB Coordination 10/30/02 01045 HNTB Cutting and Patching 10/30/02 01050 HNTB Field Engineering 10/30/02 01200 HNTB Project Meetings 10/30/02 01300 HNTB Submittals Shop Drawings Product Data and Samples 10/30/02 01400 HNTB Quality Control 10%30/02 01421 HNTB Reference Standards and Definitions 10/30/02 01631 HNTB Substitutions 10/30/02 01700 HNTB Contract Closeout 10/30/02 01720 HNTB Project Record Documents 10/30/02 01730 HNTB Operation and Maintenance Data 10/30/02 01740 HNTB Warranties 10/30/02 DIVISION 2—SITE CONSTRUCTION 02060 HNTB Building Demolition 10/30/02 02222 HNTB Excavation 10/30/02 02300 HNTB Earthwork DIVISION 3—CONCRETE 03100 HNTB Concrete Formwork 10/30/02 03300 HNTB Cast-In-Place Concrete 10/30/02 DIVISION 4—MASONRY 04200 HNTB Unit Masonry 10/30/02 DIVISION 5—METALS 05120 HNTB Structural Steel 10/30/02 05210 HNTB Steel Joists 10/30/02 05310 HNTB Steel Deck 10/30/02 05400 HNTB Cold-Formed Metal Framing 10/30/02 05500 HNTB Metal Fabrications 10/30/02 05810 HNTB Expansion Joint Cover Assemblies 10/30/02 DIVISION 6—WOOD AND PLASTICS 06100 HNTB Rough Carpentry 10/30/02 Page 4 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 7—THERMAL AND MOISTURE PROTECTION 07210 HNTB Building Insulation 10/30/02 07241 HNTB Exterior Insulation and Finish Systems—Class PB 10/30/02 07533 HNTB Single-Ply Membrane Roofing 10/30/02 07716 HNTB Roof Expansion Assemblies 10/30/02 07720 HNTB Roof Accessories 10/30/02 07811 HNTB Sprayed Fire Resistive Materials 10/30/02 DIVISION 8—DOORS AND WINDOWS 08110 HNTB Steel Doors and Frames 10/30/02 08211 HNTB Flush Wood Doors 10/30/02 08305 HNTB Access Doors 10/30/02 08331 HNTB Overhead Coiling Doors 10/30/02 08710 HNTB Finish Hardware 10/30/02 DIVISION 9—FINISHES 09253 HNTB Gypsum Sheathing 10/30/02 09255 HNTB Gypsum Board Assemblies 10/30/02 09310 HNTB Ceramic Tile 10/30/02 09512 HNTB Acoustical Tile Ceilings 10/30/02 09651 HNTB Resilient Tile Flooring 10/30/02 09680 HNTB Carpet 10/30/02 09775 HNTB Fiberglass Reinforced Panels 10/30/02 09900 HNTB Painting 10/30/02 09841 HNTB Acoustical Wall Panels 10/30/02 DIVISION 10—SPECIALTIES 10265 HNTB Wall Surface Protection Systems 10/30/02 10660 HNTB Operable Walls 10/30/02 DIVISION 11 —EQUIPMENT 11400 HNTB Food Service Equipment 10/30/02 DIVISION 12—FURNISHINGS Not Used Page 5 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect Description Date Number Enoineer DIVISION 13—SPECIAL CONSTRUCTION Not Used DIVISION 14—CONVEYING SYSTEMS Not Used DIVISION 15—MECHANICAL 15000 HNTB Mechanical Specification 10/30/02 15300 HNTB Fire Protection Specification 10/30/02 15400 HNTB Plumbing Specification 10/30/02 15855 HNTB Air Handling Units 10/30/02 DIVISION 16—ELECTRICAL 16010 HNTB Electrical—General Provisions 10/30/02 16110 HNTB Raceways 10/30/02 16120 HNTB Wire and Cable 10/30/02 16140 HNTB Devices 10/30/02 16170 HNTB Low Voltage Disconnect Switches 10/30/02 16181 HNTB Low Voltage Fuses 10/30/02 16182 HNTB Low Voltage Circuit Breaker 10/30/02 16450 HNTB Grounding System 10/30/02 16460 HNTB Low Voltage Transformers 10/30/02 16471 HNTB Branch Circuit Panelboards 10/30/02 16485 HNTB Motor Controllers 10/30/02 16500 HNTB Lighting Fixtures 10/30/02 16520 HNTB Lighting Control System 10/30/02 Page 6 of 6 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES I. Temporary Plumbing A. Scope of work provided by the Plumbing Trade Contractor. The temporary Plumbing, and monthly rental, to be provided, will include, but are not limited to, the following: 1. Temporary water from domestic water. • Water service and hook-up at CM's jobsite trailer for the duration of the project. CM, City, DWA and Convention Center/Hotel shall approve all water service tie-in locations. • Water service with %< " hose bib at areas of expansion and renovation for the duration of the project. CM, City, and Convention Center/Hotel shall approve all water service tie-in locations. • Temporary Construction water meter to be utilized by all required Trade Contractor's for the duration of the project. • (1)114" hose bib at 48"AFF at exterior of CM's jobsite trailer. • System will be sanitized for drinking purposes. • Cost of water to be paid by the City of Palm Springs. 2. Temporary Holding Tank and Toilets. • Holding tank and connection to CM's jobsite trailer restroom, including twice weekly pump-outs for the duration of project. • Four (4) portable toilets with hand-wash stations, including twice weekly pump-outs and water service for duration of project. Locations to be determined by the CM's Project Superintendent. Pagel of 3 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES II. Temporary Electrical and Telephone A. Scope of work provided by the Electrical Trade Contractor. The temporary power, and monthly rental, to be provided, will include, but are not limited to, the following: 1. Temporary Power • Provide temporary power poles, service and hook-up of CM's jobsite trailer from approved designated location (i.e. the Convention Center, Hotel, or other) with pole-mounted metering device for the duration of the project. Service will be 100 amp, 3 phase 240 volts. • Provide temporary power poles and service to the kitchen expansion/renovation area from approved designated location (i.e. the Convention Center, Hotel, or other) with pole-mounted metering device for the duration of the project. Service will be 200 amp, 3 phase 240 volts. • Power temporary power and service to the Springs Theatre/ new meeting room and dry storage renovation area from approved designated location (i.e. the Convention Center, Hotel, or other). Utilize an existing panel for the duration of the project. Service will be 200 amp, 3 phase 240 volts. • Provide up to (6) spider boxes at the areas of expansion/renovation as directed by jobsite Superintendent. • Cost of power will be paid by The City of Palm Springs, Page 2 of 3 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES 2. Temporary Lighting • Provide and install (3) temporary power poles with (2) top-mounted security lights at far corners of construction fencing at CM's jobsite trailer compound area. • Provide temporary overhead lighting within the areas of expansion/renovation of not less than one foot-candle power square foot or as required by CAL-OSHA as need for the duration of the project. Task lighting will be by the respective trade contractors. 3. Temporary Telephone • Provide and install telephone lines and hook-up at CM's jobsite trailer from an approved designated location (i.e. the Convention Center, Hotel, or other)for the duration of the project. Provide a minimum of 4 phone lines. III. Temporary Trash Dumpsters A. Scope of work provided by the Demolition Trade Contractor. The temporary trash dumpster, monthly rental, and disposal fees to be provided, will include, but are not limited to, the following: 1. Temporary Trash Dumpsters • Provide two (2) 40-cuyd temporary trash dumpsters with weekly dump service at each area of the expansion/renovation area for construction trash debris for the duration of the project. These dumpsters are above and beyond the necessary "low-boys" and "other" 40-cuyd dumpsters that will be required for demolition, removal and disposal under the selective demolition scope of work. • Provide one (1) 4 cuyd temporary trash dumpster with weekly dump service at the CM's jobsite trailer for the duration of the project. Page 3 of 3 Revised 12/12/02 4 cil DD-- 1 - xi SA 1 THW &R ^ �yt5 ae^' ff Ron smoof SNEER Moe it i n Jf 1 i & 4 + f� �LJ°, 41 v. .�pl_. ..._.. I�Q .-y'�' ,�. � �' ,...._.. € � � bb jy�, F:.» fill 77M t 11 300 COAL I.(tj Z4x-4 All Ma itTO f s )R bVF G AT 'IIT 1�1'tIGH ;a 3fii SIP II ry r Otte A'f t1 PRE-BID RFI LOG RFI# DATE RFI DETAIL RESPONSE RESPONSE DATE PS-1 11/23/02 There is an area(receiving)in the kitchen which she 12/5/2002 The Health Department has reviewed the exposed ceiling open to structure.This area will be used to ceiling in the Receiving Area and they have not take transport food items from loading to the kitchen.We issue Provide the diffuser indicated in the sketch don't believe that this will be acceptable to the Dept provided by Syska&Hennessey. Health,Please advise. PB-2 11/25/200 Drawings show condensers for kitchen above ceiling, 12/5/2002 The new condenser for this project are indicated to b but CC personal indicate they are on roof. located on the roof. Relocation of existing condense was not included in the scope of the project. The design work required to accomplish this would involv all of the consultants and require input from the original manufacturers relative to the configuration o the condensers and compressors,their weights and centers of gravity and their utility requirements. Sinc these units were not intended for an exterior application,some kind of weatherproof enclosure will need to be designed. This is more work than can be accomplished during the bid process. HNTB concur that relocating the condensers will benefit the project and will perform the design tasks necessary to accomplish this if authorized to do so by the City. PB-3 11/25/200 Is it acceptable to use native sand for fill? 12/5/2002 Per item 5 Appendix C of the4ab rt. PB-4 11/25/200 The drawings show 4"crushed gravel as base,but 12/5/2002 Provide base under interior slordance with spec's indicate vapor barrier w/2"of native sand, the soils report. Please advise if vapor banner/sand alternative is acceptable. PB-5 11/25/200 Currently there is exterior lighting at the dock area,th 12/5/2002 This will be addressed in an a prior to bid. new plans have no provisions for any Is it an oversig t or have all exterior lights been eliminated? PB-6 11/25/200 The HVAC ducts at the S &E.Corridors of the 12/5/2002 This is a contractor's mean ans Springs Theater havehard lid under them.What is the intended method for replacement? PB-7 11/25/200 Still need final specs on the carpet/Flooring Please 12/5/2002 Carpet will be purchased and y the City toadvise. allow them to take advantage arrangementPB-8 11/25/200 What is to become of the existing camera at the 12/5/2002 This will be addressed in an a prior to bid. loading dock area?Does there need to be power and backin for a new one? PB-9 11/25/200 KA 2 shows flooring to be quarry the in Cold Prep Rm 12/5/2002 Resinous Flooring. 111,however,the finish schedules list it as resinous Please clari PB-10 11/25/200 Duplicate of PB-1 1215/20021 Duplicate of PB-1. PB-11 11/25/200 Roof stairs show on the Roof plan drawing,but not o 12/5/2002 The roof ladder comes down in the Telephone Room the floor plan drawing Please clarify where the locati of the roof stairs will be. ey TB-12 11/25/200 The Convention Center indicates that th want the :12/5/2002 Delete all reference to vinyl wall covering in the wall covering to be removed from the S.&E.corridor project. Where vinyl wall covering was previously (only the side abutting the Springs Theater)and to be specified,provided to drywall. finished with of-,to match.Please advise PB-13 11/25/200 It is not clear if any communication/data wiring is 12/5/2002 The scope of communications wiring is limited to included in the scope of work. Please clarify if this conduit,which is show on the drawings. needs to be included. PB-14 11/27/200 A note on drawing M1.10 states to remove and repla 12/5/2002 The Diffusers and air quantities were indicated on th existing air diffusers and grilles with new,these new latest drawings that were issued on November 21, are to have the same air quality as existing.Nothing c 2002 M1.11 will be reissued. the existing is shown on the drawing to determine this scope of work. PB-15 11/27/200 The scope of work note of drawing M1.11 states to 12/5/2002 The Contractor shall field verify the AHU's and remove AHU-6 and AHU-3 and all associated duct ductwork to be removed and needs to refer to the work and piping Nothing of existing is shown. available As-Builts drawings. T71 The scope of work note on drawing M1.11 states to 12/5/2002 Same as PB-15 above. remove the duct work in the hallway and leae existing duffusers.The diffsers aer shown but not the duct work. There is no condensate drain piping shown on the 12/5/2002 Condensate drain is under the HVAC scope not the plumbing drawings for any of the fan coils,split Plumbing and should be routed to the nearest recept systems or the new Air Handler Unit, as noted on Mechanical drawings and per specs. Regarding item PB-17,the condensate drain for the new AHU can be routed to the existing hub drain serving existing AHU-4.As to the fan coil units,the condensate drain can be routed to nearest Floor sink within the Kitchen Area.The split type indoor evaporated can be routed to the adjacent existing Janitor sink PB-16 12/2/2002 Per details 182/53.03,closure plate is required on 12/11/200 Detail 2/53.03 shall apply along deck edge along lines B.6,21.9&21.2 sheet 52.12?What is required Column line 21.9 with 3/6" on the balance of this roof area and what is the bent plate as reference on detail 6/51.04,however,if material? "L"exceed 6 inches, then the stiffener plate should be in triangular shape as called out in detail 6/51.04. Detail 1/53.03 shall apply to column lines B6 and 21.2 Detail 1/51.04 shall apply to all other edges of deck. Dimension"U shall be provided by Architect for all conditions. PB-19 12/2/200 On the finish schedule,room 101,dry storage shows 1Z5/2002 ACT-1 GWB.On reflective ceiling print shows Act-1? PB-20 12/2/2002 Are we to replace all of the T-bar or just what is on th 12/5/2002 Pending finish schedule?—sent request for what areas.MS PB-21 12/9/200 Drawings state that the acoustical ceiling the is 2'x2% but the detail shows 2'x4',plus here is not a specification for type of tile. PB-22 1 Z10/2002 Electrical&fire Life Safety specifications,Para. II,B, 12/11/2002 There is no public address system. line item 72;"Provide conduit,boxes and pull string only for public address systems."A public address system is not defined on the drawings,please clarify. Dec 27 02 01 : 15p FARMERS INS 5629637245 P. 1 COMMERCIAL CERTINCATE OF INSURAUGE Issue Date (MMIDDIYY) AGENCY Name BRUCE HARRINGTON, AGENT 12(30/02 & 1 091 1 ORR & DAY ROAD IBIS cedilieale is issued as a matter of information only and confers no rights Address SANTA FE SPRINGS CALIF. 90670 uponlhe-cerbflealeholder,IAis-Certificatedoes not ammnd,extend or alter (he coverage afluided by the policies shown below. 5 6 2—8 6 8—6 7 4 4 COMPANIES PROVIDING COVERAGE: IPTEArprernnr A_TRUCK-INSURANCE EXCHANGE MOVA- INSURED rIEAPAW Name ANDERSON CHARNESKY STRUCT. STEEL LFNLR H_FAIIIS INSURANCE EXCHANGE & 11 (120 ROSE AVENUE Amin" G MID-CENTURY INSURANCE COMPANY Address FONTANA, CALIF. 92337 ca.+Pmn A D COVERAGES THIS 15 TO PEAVEY THAI 1HE POLICIES Or INSURANCE LISTED BELOW HAVE BEEN ISSUED TO HIE IN ESUB NAMED ABOVE FOR IIIE POLICY PERIOD INDICATED NDTWIFIISTANIANo AEFY nFIIUIREMFNII.ILRM URCONDHICN OF-ANY CULRINACI 0 CINCH DOCILMF_NT WITH RESPECT TO WIIICfi 1111S CERTIFICATE MAY BE ISSUED OR MAY PERIAIN,THE INSURANCE AIfURUfU nY IIIE PDUCIES UESCIIIBEU TIE ItCIId IS$UOJECI IU ALL TILE IFRMS.EXCLUSIONS AIIU CONDITIONS of SUCH POLICIES BEEN-IIEDUCF0 BY PAID CLAIMS CO 7ypE Or INSURANCE POLICY NUMBED POLICY EFFECTIVE POLICY€xPIRAllou - POLICY LIMNS- Lift DATE(MMIOD(YY) DATE IMr1VDORY) FAULVEAUSINGINJURT GEXEnAL LIABILITY $ COMMERCIAL GENERAL LIABILITY COMP!OPS -DCCUMENCE VERSION E- CONIINCIUAI BICIDENIAL ONLY A UWNERS&CUNIMCIGNS PRO( NGINJURY-URRENCE GE(Any ooe roel $ MEDICAL EXPE14SE TAR/one person) $ CONINITO AN101NBILE LIABILITY SINGLE LIMIT $ 1 ,0 0 0, 0 0 0 A ALL OWNER COMMERCIAL AUTOS BODILY INJURY A x SCHEDULED AUTOS 939-1- 42 79 2/1J0 IFER PERSON) $ X 111RED AUTOS -2 2/1 J03 BODILY INJURY X _ NUNOWNEO AU!US IPER Account $ GARAGE CAWLIIY PROPERLY DAMAGE $ GARAGE AGGREGATE $ UMDRELLA LIABILITY LIMIT $ STATUTORY WORRIERS'01APENSALI0 EACH ACCIDENT $ AND DISEASE-EAGII EMPLOYEE EMPLOYERS'LIABILITY DISFASE-POLICY LIMIT $ DESCIIIPTiON OF OPFBAIION$IVEiiICLF51RF5TflICYIOeSISPECIfiL ITEMS: PROJECT: PHASE 1 CONVENTION CENTER EXPANSION. . .CITY PROJECT NO. 02-19-06 PALM S R CS CE911HEA E IIDPEoER- CA.PXFLLATIUN sHoulO ANY Ur 111E ADDVE DCSCNIDEO POLICIES BE CANCELLED BEFORE IIIE EXMMDON DAIS NICREOF. IHC ISSUING COW'ANY WILL fjjc 7tGRN MNL 30 DAYS W'RDIEN 110UCE rD TnF CCANTICAIE HOL UER TURNER CONSTRUCTION COMPANY TIIRIE1E11.qu(�IR!yr!&fdI¢I�Ei�Al1 !,LrP,,J�rfilNlic%M15F�p�IiN6AtHIlF4l!1EM11S�fcDr S55 {'JEST L'IFTH S'i'REE'P, 37th FLOOR flc13N919'kf11c5?Y�'h1kt€w§DkJIR?SFSMYIh£ LOS ANGELES, CALIF. ?0013 � AUflI011lltfi r¢lvFSt"Niriiiit �_�.�. ^_i A-- - <"aPp 12-27-02 04:28pm From- T-030 P 001/003 F-537 H L.1!/Y[J I�CIC 111-I%AIA I G VP L11AMILI 1 T IIVJUt'Cfi,IV IAC crlu G AN0050A 12 -27 02 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Dodge Warren 6 Peters-Torrance ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE LiC. #0543895 HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND,OR 3625 Del Amo Blvd. , #300 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, Torrance CA 90503- Phone: 310-542-4370 Fax:310-542-1H03 INSURERS AFFORDING COVERAGE NAIL usuRED INSURER A' Evanston Insurance Co... Anderson sky Structural Steel, Inc. ; AC ACES INSURER B• Ro al Insurance Co. AT1N — Darla INSURERC 11020 Rose Avenue INsuRERO Fontana CA 92337 _ INSURER E -- GOVERAGL5 THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT,TERµOR-rONOITION DRAW CONTRACT OR-OTHER-OOCUMENTWITH RESPECT TOi RICNTHIS-CER-TIFIEaSEMAY-BEISSUEDOrt MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBEO HEREIN 15 SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS INS bR - .IRASIG LTR ISR IY TYPE OF INSURANCE POLICY NUMBER DATE MMIDDY DAYE MW BA"TI' LIMIT6 GENERALLIABILITY /.� EAGHOCCURRENCE S1,000�Q00 A T: ): -COMCA MERCIAL GENERALLIABILITYCCUR 02=Pl005R71 Ov Iot'Oz Q<,lol(IL3 PREMISES(EA OfGurenEe IE5Q,000 CLAIMS MADE �OCCVR MEO E%P IA�y ane pnrvn) SSrQQQ X 10,000 DEDUCTIBLE CONTRACTORS", pRE[S-F S_ PERsouAL aADV INJURY s1,000 Q0-0- PER OCCURRENCE OPERATIONS INCLUDE GENERALAGCRE INJURY ATE III,000I 000 GEN'POLICYX IPoITAPP4IESRER- Bewd Peam PtoPeryOw.Iav PRODUCTS-COMPIOPAGCI s 1,000,00-0' POLICY X JEGT LOG — I AU.TnMOBILE LIABILITY COMBINED SINGLE LIMIT ANY AUTO (EnemtlanD 5 ALL OWNED AUTQI SC HEOULE0 AUTOS BOOrLYINJURY 8 _ (Por penonJ HIRED AUTOS —' I NON-OWNED AUTOS (PBDDILYerp¢.aeNnpJURY S PROPERTY DAMAG4 �5 _ IPor v_vwvnl) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT ANYAUTO OTHER THAN EA ACC I AUTO ONLY aGG EXCESSIUMBRELLA LIABILITY EACH OCCURRENCE S 4,000,DDO B X OCCUR ❑ CIAIMSMADE PRA204929 02/10/02 02/10/03 AGGREGATE 5A,000 000 DEDUCTIBLE B RETENTION $ - E WORKERS COMPENSATION AND _ EMPLOYERS'LIABILITY TORY LIMITS L EA ANY PROPRIETOPIPARTNER)EXE-BUTIVE �L EACH ACCIDENT 5 CF M FICEREMBER EXCLUDED?f EL DISEASE EA Eh fPLOYEE S IV tl.m',o un aor SPECIA LPROVISIONS IMIq- OTHER L DISEASE-POLICY LIA:IT r i it DESCRIPTON OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS Phase I Convention Center Expansion, City Pro3ect No, 02-19-06. 'e10 day notice IF cancelled for non-payment of premium. CERTIFICATE HOLDER CANCELLATION rTila21VCRC SHOULD ABY OF THE AGOVE DESCRIBED POLICIES BE CANCELLED BEFORE THJSO�"SHALL GATE TI<EREOF.T:IE155VING INSURER YIEL ENDEAVOR TO MAIL *3 0 fiOTICE TOTHE CERTIFICATE HOLDER NAMED TO THE LEFT.BUT FAILURE TO, Turner Construction company i555 W@3t. 51Ch StreCC IMPOSPNOO9LIG. 1..GR%IA5II.TYOF ANY KIND VVQN TH EIN 11�iE R,I $AZO5 A+ngele5 C..A 90013V///IAUTHORIZED REPRESENTgTIVf �J'1 I amari-, Le ea. ss y1 s ! acORD zs lzs hOa�IDa> B ACORD CORP TION 19aa 12-27-02 04:30pm From- T-W P,003/003 F-537 ACCORD f-ERTII-IIL;A I t UI- LIAti1L11 Y INJUhCANt;t ANUP ID jig 1 lz 2z o2_ PRODUCER THIS CERTIFICATES IS ISSUED AS A MATTER OF INFORMATION Dodge Warren 6 Petero-Torrance ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Lic. 00543895 HOLDER TMP,CERTIFICATE DOES NOT AMEND.EX-TEND-OR- 3G25 Bel Amo Blvd. , #3DO ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW, TOrtanra-CA_90a13.- Phone: 310-542-4370 Fax:310-542-1003 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURERA CA State COIDpen9at10n INSURER B Anderson Charne9ky}! Structural _ ----- SkBel- IncO.tpor te Fontana CA 92337 CL INSURER C. F Rose Avenue INSURER �~ onta INSURER E COVERAGES THE POLICIES OF INSURUNCE LISTED BELOW HAVE DEEM ISSUE070 THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING MAY PERTAIN.THE EITERMNCE AFFORDED THE EOLICIES E0.IITHED HEREIN IS 5UB1TH.RETO ALLTETER H-THLRJ_USICNCAND CONDITIONS Or MAYPERTAIN.THEINSURANCE AFFOROA BYTHEPOLICIESDESCRIBEDHEREIN IS SUBJECT f0 ALL THE TERMS,EXCLUSIONS AND CONDITIONS 00 SUCH PDUGIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REOVGED BY PAID CLAIMS LTR NSH TYPE OF INSURANCE POLICY NUMBER D�LTCMMIDD DATE MM/ODm LIMITS GFNERALLIADILITY EACH OCCURRENCE S COMMERCIAL GENERAL LIABILITY PREMISES IEe om cumI) 5 CLAIMS MADE ❑ OCCUR NED EXP IAny one pereePl J i PERSONAL S-AOV-INJUR-Y S- T--- GENERALAGGREGATE S GEN'EAGGRE�ATELIMIFAPPLIESPER- PRODUCTS-COMP/OP AGG S_ — POLICY 7 JECT PRO LOC ALLTOMOEILELIABILITV COMBINED-91NGLELIM�T 3 ANY AUTO IEe BCCIEenlj ALL_DWNETLAUTO& BODILY INJURY -� SCHEDULED AUTOS IPer Permnl IURED AUTDB EODEY Y ALION s NON-OWNED AUTOS IPp!uaimnl) PROPERTYDAMAGE y IPOl occ crop GARAGE LIABILITY AUTDONLY EAACCIDENT E ANYAUTO OTHER THAN FA ACC • ' AUTO ONLY AGG 73 EXCESSIUMBRELLn LIABILITY EACH OCCURRENCE Is OCCUR ❑ CLAIMS MADE AGGREGATE $ _ S DEDUCTIBLE Sr RETENTION S W ORKER5 COMPENSATION AND X '11FILIATI IMITS ER BM PLGYERc'LIABIU A tt I58 Ddr7 0-?fl&;02 f 0-2f1&/0-3 _E•L E_nerr_acclDer•rr si 000: Fi0-0' ANY NY R EEJE%ECDrrvE Of CKIUMEMBEREXCLIJDEOP IeB do6cPBewCer I EL DISEASE ASE AEMPLOYEE I 000,000 OTHER CPROVISTONSeplpw EL DISEASE-POLICY LIMIT B0Q-.QDa OTHER DRSCRIPTTON OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT I SPECIAL PROVISIONS Phase I Convention Center Expansion/ City Project No. 02-19-06 *10 days notice IF for non-payment of premium CERTIFICATE HOLDER_ f ANCRI ATION TVRNERC SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION ` DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL *30 DAYSWRITTEN NOTICE TO THE CERTUP CATE HOLDER NAMED TO THE LEFT.BUT FAILURE TO DO SO SHALL Tur5-55 Wr Construction Company IMPOSE NO ORLIGATON OR L IAUILHT OF ANY RIND UPON THE INSUEEP.ITS A4EN150R S5S Biestr S�t k> cytrggt Los Angeles CA 90013 REPRESENTAnVE9. AUTHDRIXEO REPRESENTAIIV, I __ Zarnartine M. Scttle's ACORD 25(2DC110B) - p ACO 5 CORPORATION 1988 I2-27-02 04:30pm From- T-055 P 002/003 F-537 POLICY NUMHER-o2GLPLdlma CC1MI ERCIALGENERAL LLABILITY INSURED:Anderson Charnesky Structural Sreel,Inc.;ACSS TWS ENDORSEMENT CHANCES THE POLLCY.PLEASE RE.AD1TICAUFFfn t Y, ADDITIONAL INSURED - OWNTERS, LESSEES OR OONTRACT(DRS (FORM B-) This endorsement modifies insurance provided under the following:. COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Person or organization: As Required By Written Contract Turner Construction-Co. And City of jPalm Springs ram:I'drasrL CanventivrrCexterExpntrsiarr, Cirp�r0rectli*ir(tali=0G (If DO ent>y appears above, information required to complete this cndcrsement will be shown inthe Declarations as applicable to this endorsement) WHO IS AN INSURED (Section 11) is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of"your work"for that insured by or for you. It is further agreed that such insurance as is afforded by This policy for die benefit of the Additional Insured shown shall be primary insurance,and any other insurance maintained by the Additional Insured shall be excess and non-contributory, but only as respects any claim, loss or liability arising out of the operations of Cite Named Insured, and only if such claim, loss or liability is determined to be solely the negligence or responsibility of the Named Insured. This coverage is limited to "your work" completed within the policy period "Insureds are advised that certificates of insurance should be used only to provide evidence of insurance oa lieu of an actual copy of the applicable insurance policy. Certificates should not be used m amend, expand, or otherwise alter the terms of the actual policy." ICO2260501