HomeMy WebLinkAbout12/18/2002 - STAFF REPORTS (19) DATE: December 18, 2002 TO: City Council FROM: Director of Public Works/City Engineer PALM SPRINGS SKATE PARK RECOMMENDATION: It is recommended that the City Council approve and adopt the plans, specifications and working details, and authorize advertisement for construction bids for the following two projects: 1) Palm Springs Skate Park Construction, City Project 02-23 2) Swim Center, Pool House & Concession Stand Improvements, City Project 98-21 SUMMARY: Section 7.03.040 of the Procurement and Contracting Code requires that Council approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of these two projects will allow staff to proceed with these public projects, with a total estimated cost of$1,600,000. BACKGROUND: Widespread community support for, as well as previous Council endorsement of construction of a community skate park facility within the Sunrise Park grounds led to the award of a design contract with Site Design Group on April 24, 2002. Development of the conceptual plans forthe skate park facility, designed by Interactive Design Group,following months of community involvement and review by the Parks & Recreation Commission, Planning Commission, as well as previous City Council study session reviews,have resulted in development of plans and specifications for construction bidding of this facility. The City has successfully received over $500,000 in state grants toward the construction of the skate park facility. Due to the fact that the use of state funds requires contract provisions for prevailing wages, staff has divided the construction of this facility into two separate projects. The skate park portion of the project where state grant funds will be used and where prevailing wage rates will apply has been entitled: Palm Springs Skate Park Construction, City Project 02-23; whereas, the swim center renovations and new pool house/concession stand building construction where general funds will be used, and thereby prevailing wage rates will not apply (and by extension, lower construction costs will result), has been entitled: Swim Center, Pool House & Concession Stand Improvements, City Project 98-21. The Palm Springs Skate Park Construction project includes within its scope of work the following: • Removal of existing concrete sidewalk and concrete masonry block walls; • Demolition and removals,and associated hazardous material handling and disposal of the existing pool house building; • Clearing, grubbing, removals and grading of the skate park site; /s';4 Palm Springs Skate Park December 18,2002 Page 2 • Construction of a complete Portland cement concrete skate park with various ledges, basins, pools, bowls, and other elements, including decorative coping, ceramic tile treatment, and steel edging; • Construction of new decorative Portland cement concrete walkways, concrete masonry block walls, and retaining walls; • Construction of decorative wrought iron fencing and gates; and • Installation of landscaping, irrigation, and lighting and electrical systems Following review of the skate park project by Council at its December 11 Study Session, staff was made aware of the fact that the custom cable and canopy system originally conceived by Ralph Raya and presented to the Council would not function appropriately within the skate park itself. On closer inspection of the structural plans, staff was made aware of the fact that additional support columns would be necessary within the skate park area and not limited to its perimeter, representing an obstacle and safety hazard to skate park users. Although Council supported this canopy concept, the structural requirements to support the weight of the canopy and lights are not consistent with the layout of the skate park area. In order to move forward with construction of the skate park, staff has included in the bid documents the following alternative options relating to the park lighting system: 1) Install only the infrastructure (conduit, footings, and basic electrical system)for the traditional 25-feet high pole and 1000-watt flood light system, but with no poles and lights, implying that the City, at least initially, would not operate the park at night.; 2) Install the complete traditional flood light system; 3) A revision to Ralph Raya's original concept, includes only poles and cables to support hanging direct cut-off flood lights, but without the canopy system; and 4) A cantilever canopy system identical to the type installed at the parking structure, providing shade around the perimeter of the skate park facility, (to be included, if structural plans are available for inclusion into the bid documents prior to bidding). The fourth concept is one that would continue to include a canopy-type structure that has received strong Planning Commission and Council support, and allows for the ability of "tying together" the canopy-type forms found at the airport and the new parking structure. Another optional item to be included, in response to Council direction received at the December 11 Study Session, will relate to construction of either a wrought iron fence or masonry block wall along the property line between the skate park and high school. The Swim Center, Pool House & Concession Stand Improvements project includes within its scope of work the following: 1) Construction of a new bath and locker room facility and concession/administration building, complete with all required fixtures; and 2) Removal and replacement of existing swim center filtration, heating and chemical equipment and systems Palm Springs Skate Park [December 18,2002 Page 3 This action is being brought before Council to be in compliance with the Procurement and Contracting Code. The plans and specifications are continuing to undergo final review by City staff through the plan-check process, and minor modifications relating to technical details and specifications may be required following Council's formal approval of the plans and specifications. Upon Council's approval with this action and final plan-check corrections, as required to ensure compliance with applicable building codes and other related issues, staff will schedule bid advertisements, with a tentative bid opening date of January 28, 2003. SUBMITTED: y/x,�, DAVID J. BARAKIAN Director of Public Works/City Engineer APPROVED: VID H RE Y Man er ATTACHMENTS: 1. Minute Order (2) l5,¢� No.3546 CITY OF PALM SPRINGS �.,.- . NOTICE INVITING BIDS For kale ark E Palm Springs Skate Park Construction ' City Project 02-23 I NOTICE IS HEREBY GIVEN that sealed bids for the Palm Springs Skate Park Construction, 5 Cry Project 02-23, will be received at the office' of the Director of Procurement and Conractingg of the City of Palm Springs, California, until 2 00 s P.M. on February 25, 2003, at which time they will be opened and read aloud oy- 4 - + co DESCRIPTION al THE WORK: The Work comprises the removal of existing concrete build[ side- walk and concrete masonry block walls; bWdmgg demolition and removals, and associated hazard- PROOF OF PUBLICATION gru material handling and disposal; clearing, grubbing, removals an tl ending;construction of a complete Portland cement concrete skate park (2UI5.5.C.C.P) with various ledges, basins,de pools, bong and l J J other elements, mcludmd decorative coping, ce- ramic the treatment, an steel edging; construc- tion of new decorative Portland cement concrete walkways, concrete masonry block walls, and re- taining walls; construction of decorative wrought Iran fencing and gates;installation of landscaping, irrigation, and lighting and electrical systems; and all appurtenant work complete and in place. The work shall be coordinated with the concur- rent construction of the separately bid contract for the Swim Center, Pool House & Concession Stand Im rovements, City Project 98-21. In sub- STATE OF CALIFORNIA mitring a liid,bidders agree to all required coordi- nation efforts necessary to stage, phase, and - - County of Plverslde - - schedule the work included with this contract to -- — -- ----- - - be consistent with the timing of Concurrent con- struction by other contractors that will be using pportions of the job site that is,as part of this con- hact, to be prepared in advance of, concurrent with, or after their work. I PRE-QUALIFICATION OF CONTRACTOI All prospective bidders are directed to review the "Contractor Pre-Qualification Package" Issued by the Department of Procurement and Contracting on November 8, 2002, regarding pre-qualification of contractors for this project. Award of this con- tract will ONLY be made to a pre-qualified Class -A general-contractor committing to performthe structural concrete work With its own forces or a I am a citizen of the United States and a resident of Class A general contracto concrete`class C-3)sub-c r utilizing a structural ontractor who has suc- the County aforesaid;I am over the age of eighteen easefully pre-qualified with the City for this project via the pre-qualification process. Bidders are en- years,and hill party to or interested in the couraged to submit pre-qualification packages at the earnest c portunity, or to obtain a listing of above-entitled matter.I am the principal cleric of a J pre-qualified lass C-8 sub-contractors,to ensure compffance with the pre-qualification requirement. printer of the,DESERT SUN PUBLISHING Information regarding the pre-qualification pro- COMPANY a news la er of general circulation, Cb7s, ar a listing of pre-qualified contractors may I P g be obtained % contacting: Mari Lynn Boswell, Printed and published ill the cityOf Palm Springs, Administrative Secretary, at(760) 323-8237, or at; ManLynnB®ci.palm-springs ca.us County Of Riverside,and which newspaper has been Bid proposals submitted by general conil adjudged a ucwspaper Of general circulation by the tors that have faded to successfully pre-quali- fy, or do not use a pre-qualified Class C-8 lo- Superior Court Of the County of Riverside,State of censed sub-contractor, will be considered as California under the slate of March 24, 1988.Case non-responsive and rejected. Number 191236;that the notice,of Which the N-4 AWARD OF CONTRACT: (a) The Work hereunder is set forth in four sepa- anneXed is a printed Copy set in type not smaller rate Bid Schedules A, B, C, and D Bidders are re otred to submit bids on all four Bid Schedules. than non panel,has been published in each regular O9 one Bid Schedule will be awarded,however, and d g Ciitlr'C Issue Of sold newspaper not in any an the City reserves the rl lowest responsive, responsibleht to award to the bidder on the ba- id Schedule chosen far award by the supplem sis of the Bent thereof on the following dates,to wit: Cary Council, and reject all other bids, as it may - - best serve the-interests of the City.The City fur- ther reserves the nghf after-openingg—bids to reject January 25t11 February Ist any or all bids,and to waive any minor informality (non-responsiveness) In a bid. Asa condition of award,the successful bidder will be required _________------------__________________________________________ manta bonds and submit payment and perfor- insurance. All ill the year'2003 I BID SECURITY:each bid shall he accompa- nied by a certified or cashier's check or Bid Bond I certify(Or declare)under penalty Of perjury that the in the amount of IQ percent of the total bid price pay, to the City of Palm Springs. foregoing is true and correct. IBIDS TO REMAIN OPEN: The Bidder shall 3rd guarantee the Total Bid Price for a period of 60 Dated at Palm Springs,California this--------------day calendar days from the date of bid opening February I CONTRACTOR'S LICENSE CLASSIFICA- TION:The Contractor shall possess a valid Class Ot------------------------------- 2003 A Contractor license at the time of submitting / bids. N-8 CALIFORNIAThe Cont WAGE PATE he general III���VVV/ MEN7S: The Contractor shall pay the general ________ revailin rate of per tliem wages as determined y the hector of the Department of Industrial Signature Relations of the State of California for the locality where the work is to be performed A copy said wage rates is file at the office the City ty Engineer The Contractor and any subcontractors ntractors shall pay not less than said rates and shall post a copy of said wagea rates rates at the pro- ject site. I RETAINAGE FROM PAYMENTS: The Con- tractor may elect to receive 100 percent of pay- ments due under the Contract Documents from time to time, without retention of any portion of the payment by the Cry by depositing securities of equivalent value with the Ciiy in accordance with the provisions of Section 22y00 of the Public Contract Code. N-10 PRC—BO VISIT TO WORK SITE: Prospec- tive bidders are requited to stooda-pr�bid-walk through of the proposed work site and existing facilities which will be conducted by the City at 70:00 A.M. on February 11, 2003. Bidders should meet at the Community Center located on Pavil- ion Way, in the Sunrise Park grounds. Failure to participate in the pre-bid walk through may ren- der a bidder as non-responsive. N-11 OBTAINING OR INSPECTING CONTRACT DOCUMENTS: (a)Contract Documents may be insppected without charge at the office of the City Er sneer, 3200 East Tel Canyon Way, Palm Springs, CA 92262. (b) Complete sets of said Contract Documents may be purchased at$75.00 per set and are ob- tainahle from the office of the City Engineer,3200 East Tahquitz Canyon Way, Palm Springs, CA 92262. No refund will be made of any charges for sets of Contract Documents. (c)An additional fee of$35.00 will be charged for sets of documents sent by mail. N-12 ADDRESS AND MARKING OF BIDS: The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs, and shall be delivered or mailed to the Director of Procure- ment and Contracting at 3200 East Tahquitz Can- yon Way, Palm Springs, CA 92262.The envelope shall be plainly marked in the upper left hand car- net with the name and address of the Bidder and -- - - - shall bear the words "Bid Far " followed by the title of the Project and the date and hour of open- ing Bids. l'he certified or cashier's check or Bid Bond shall be enclosed In the same envelope with the Bid Data . By/s1 David J Barakian,PE ;3itv Engineer ^ January 25, February 1, 2003 ®vAL&I o f r S 4", City of Palm Springs Department of Public Works and Engineering 3200 H. Tah uitz Canyon Way Palm Springs, California 92262 x Tel (760) 323-8253 • Pax: (760)322-8360 • Web: www.ci.palm-spxings.ca.us r' t7zsr CITY OF PALM SPRINGS Public Works & Engineering Department P.O. Box 2743 Palm Springs, CA 92263 ADDENDUM NO. 1 To all prospective bidders under Specifications for the Palm Springs Skate Park Construction; City Project No. 02-23, which are to be received by the City of Palm Springs at the office of the Director of Procurement and Contracting at 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262, until 2:00 p.m. on Tuesday, February 25, 2003: I. The following change shall be made in Part I - Bidding and Agreement Forms and Bonds: A. Paragraph N-7 "Contractor's License Classification" shall be revised to read: The Contractor shall possess a valid Class A or Class B license at the time of submitting bids. 11. The following change shall be made in Part II - Conditions of the Contract, Supplementary General Conditions: A. Article 6.4 "Concerning Subcontractors, Suppliers, and Others", subparagraph (e) is revised to require that the Contractor shall perform not less than 0% (zero percent) of the Work included in the original Contract Price with its own forces. III. The following changes shall be documented and considered as revisions to the project drawings: A. Sheet C-4.1 (9a of 37), Sheet C-4.2 (9b of 37) and Sheet E-2 (32 of 37) have been revised. The original sheets shall be discarded and the revised sheets, dated February 10, 2003, shall be used. IV. The Special Provisions as originally issued shall be used in submitting bids, and an acknowledgment of receipt of this Addendum No. 1 shall be entered on Page 2 of the Bid forms. Failure to provide such acknowledgment shall render the bid as non- responsive and subject to rejection. Date: February 18, 2003 BY ORDER OFF THE CITY OF PALM SPRINGS By / David J. Barakian, PE Director of Public Works/City Engineer Civil Engineer C 28931 �' 0 /a3 l � Post Office Box 2743 • Palm Springs, California 92263-2743 PALM s City of Palm Springs l �y �/ Department of Public Works and Engineering ; anl eo / 3200 E.Tahquitz Canyon Way • Palm Springs, California 92262 <iFOi z�s? Tel: (760) 323-8253 • Fax: (760) 322-8360 • Web: www.ci.palm-sprmgs.ca.us CITY OF PALM SPRINGS Public Works & Engineering Department P.O. Box 2743 Palm Springs, CA 92263 ADDENDUM NO. 2 To all prospective bidders under Specifications for the Palm Springs Skate Park Construction; City Project No. 02-23, which are to be received by the City of Palm Springs at the office of the Director of Procurement and Contracting at 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262, until 2:00 p.m. on Tuesday, February 25, 2003: I. The following changes and clarifications shall be documented and considered as revisions to the project drawings: A. Sheet C-1 .1 (2 of 37) does not indicate an existing Verizon phone booth located immediately west of the existing administration building on the pool deck, nor existing light poles and lights around the perimeter of the pool deck, nor existing lockers along the perimeter of the pool deck and adjacent to the existing block walls, nor required demolition and removals of the existing pool deck. Sheet C-1 .1 shall be revised to indicate the following items: 1. The Contractor shall be responsible for removing and relocating (to a location approved by the City adjacent to the new pool house building to be constructed under separate contract as part of City Project 98-21) the existing Verizon phone booth (and associated conduit and service lines), including required coordination with Verizon. 2. The Contractor shall be responsible for removing and relocating the existing lights (and associated conduit/conductors) that are within the demolition and removal area required for construction of the meandering cast-in-place concrete retaining wall/seat wall (as shown on Sheet C-2.1 [3 of 371)• 3. The Contractor shall be responsible for removing and disposing of the existing locker facilities located within the pool deck area. 4. The Contractor shall be responsible for demolition and removal of the existing pool deck required for construction of the meandering cast-in-place concrete retaining wall/seat wall (as shown on Sheet C-2.1 [3 of 371), including replacement of pool deck between the point where removal of existing pool deck occurred and the new meandering cast-in-place concrete retaining wall/seat wall. The cost of items 1, 2, and 3 shall be considered as included in the bid item price for Bid Item 8 "Building Demolition & Removals (includes hazardous materials handling and disposal)" of Bid Schedules A, B, C, or D, and no additional compensation shall be allowed therefore. The cost of item 4 shall be considered as included in the bid item price for Bid Item 18 (Construct Concrete Cast-in-Place Seatwall) of Bid Schedules A, B, C, or D, and no additional compensation shall be allowed therefore. Post Office Box 2743 0 Palm Springs, California 92263-2743 7 , Palm Springs Skate Park Construction City Project 02-23 Addendum No. 2 February 20,2003 B. Bid Item 17 "Construct 6' Wrought Iron Skate Park Perimeter Fence (includes gates)" of Bid Schedules A, B, C, or D, includes the Swim Center entry/exit gate located between the new locker room/rest room building and the administration/concession stand building; and includes the Skate Park separate entrance and exit gates, as shown on Sheet C-2.1 (3 of 37), Sheet C-4.1 (9a of 37) and most clearly on Sheet C-4.2 (9b of 37). The Contractor shall include the cost of furnishing and installing these gates, in coordination with construction of the associated buildings and 8' high walls to be constructed under separate contract as part of City Project 98-21. Shop drawings for these gates shall be provided to the City prior to fabrication, as is indicated for the gate identified by Materials Key Note 27 on Sheet C-2.1 (3 of 37). Four total gates are required for this project; all gates shall be provided with hardware to allow them to be locked. II. The Special Provisions as originally issued shall be used in submitting bids, and an acknowledgment of receipt of this Addendum No. 2 shall be entered on Page 2 of the Bid forms. Failure to provide such acknowledgment shall render the bid as non- responsive and subject to rejection. Date: February 20, 2003 BY ORDER OF THE CITY OF PALM SPRINGS By .*J" David J. Barakian, PE Director of Public Works/City Engineer Civil Engineer C 28931 e CITY OF PALM SPRINGS NOTICE INVITING BIDS For constructing: Palm Springs Skate Park Construction City Project 02-23 N-1 NOTICE IS HEREBY GIVEN that sealed bids for the Palm Springs Skate Park Construction, City Project 02-23 , will be received at the office of the Director of Procurement and Contracting of the City of Palm Springs, California, until 2 : 00 P.M. on February 25, 2003, at which time they will be opened and read aloud. N-2 DESCRIPTION OF THE WORK: The Work comprises the removal of existing concrete sidewalk and concrete masonry block walls; building demolition and removals, and associated hazardous material handling and disposal; clearing, grubbing, removals and grading; construction of a complete Portland cement concrete skate park with various ledges, basins, pools, bowls, and other elements, including decorative coping, ceramic tile treatment, and steel edging; construction of new decorative Portland cement concrete walkways, concrete masonry block walls, and retaining walls; construction of decorative wrought iron fencing and gates; installation of landscaping, irrigation, and lighting and electrical systems; and all appurtenant work complete and in place. The work shall be coordinated with the concurrent construction of the separately bid contract for the Swim Center, Pool House & Concession Stand Improvements, City Project 98-21 . In submitting a bid, bidders agree to all required coordination efforts necessary to stage, phase, and schedule the work included with this contract to be consistent with the timing of concurrent construction by other contractors that will be using portions of the job site that is, as part of this contract, to be prepared in advance of, concurrent with, or after their work. N-3 PRE-QUALIFICATION OF CONTRACTORS: All prospective bidders are directed to review the "Contractor Pre- Qualification Package" issued by the Department of Procurement and Contracting on November 8, 2002 , regarding pre-qualification of contractors for this project . Award of this contract will ONLY be made to a pre-qualified Class A general contractor committing to perform the structural concrete work with its own forces or a Class A general contractor utilizing a structural concrete (Class C-8) sub- contractor who has successfully pre-qualified with the City for this project via the pre-qualification process . Bidders are encouraged to submit pre-qualification packages at the earliest opportunity, or to obtain a listing of pre-qualified Class C-8 sub-contractors, to ensure compliance with the pre- qualification requirement. Information regarding the pre- qualification process, or a listing of pre-qualified contractors may be obtained by contacting: Mari Lynn Boswell, Administrative Secretary, at (760) 323-8237, or at : MariLynnB@ci .palm-springs .ca.us . Bid proposals submitted by general contractors that have failed to successfully pre-qualify, or do not use a pre- qualified Class C-8 licensed sub-contractor, will be considered as non-responsive and rejected. N-4 AWARD OF CONTRACT: (a) The Work hereunder is set forth in four separate Bid Schedules A, B, C, and D. Bidders are required to submit bids on all four Bid Schedules . only one Bid Schedule will be awarded, however, and the City reserves the right to award to the lowest responsive, responsible bidder on the basis of the Bid Schedule chosen for award by the City Council, and reject all other bids, as it may best serve the interests of the City. The City further reserves the right after opening bids to reject any or all bids, and to waive any minor informality (non-responsiveness) in a bid. (b) As a condition of award, the successful bidder will be required to submit payment and performance bonds and insurance. N-5 BID SECURITY: each bid shall be accompanied by a certified or cashier' s check or Bid Bond in the amount of 10 percent of the total bid price payable to the City of Palm Springs . N-6 BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 60 calendar days from the date of bid opening. N-7 CONTRACTOR'S LICENSE CLASSIFICATION: The Contractor shall possess a valid Class A Contractor license at the time of submitting bids. N-8 CALIFORNIA WAGE RATE REQUIREMENTS: The Contractor shall pay the general prevailing rate of per diem wages as determined by the Director of the Department of Industrial Relations of the State of California for the locality where the work is to be performed. A copy of said wage rates is on file at the office of the City Engineer. The Contractor and any subcontractors shall pay not less than said specified rates and shall post a copy of said wage rates at the project site. N-9 RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. N-10 PRE-BID VISIT TO WORK SITE: Prospective bidders are required, to attend a pre-bid walk through of the proposed work site and existing facilities which will be conducted by the City at 10 : 00 A.M. on February 11, 2003 . Bidders should meet at the Community Center located on Pavilion Way, in the Sunrise Park grounds . Failure to participate in the pre-bid walk through may render a bidder as non-responsive. N-11 OBTAINING OR INSPECTING CONTRACT DOCUMENTS: (a) Contract Documents may be inspected without charge at the office of the City Engineer, 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262 . (b) Complete sets of said Contract Documents may be purchased at $75 . 00 per set and are obtainable from the office of the City Engineer, 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262 . No refund will be made of any charges for sets of Contract Documents . (c) An additional fee of $35 . 00 will be charged for sets of documents sent by mail . N-12 ADDRESS AND MARKING OF BIDS: The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs, and shall be delivered or mailed to the Director of Procurement and Contracting at 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262 . The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words "Bid For. . " followed by the title of the Project and the date and hour of opening Bids . The certified or cashier' s check or Bid Bond shall be enclosed in the same envelope with the Bid. Date By David J. Barakian, PE City Engineer ,hot No.3552 NOTICE OF PLANNING COMMISSION MEETING CITY OF PALM SPRINGS PROOF OF PUBLICATION T Case No. 5.0934- PD-281 Southwest corner of Vista Chino Drive (2015.5.C.C.P) and Sunrise Way NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Palm Springs, Callfcr- ins, will hold a ppublic hearing at its meeting of February 11, 2003 (Tuesday). The Planning Com- mission meetingg begins at 1.30 p.m. ub i lic hear- ing start at 2:00 pp.r in the Council ambers at City Hall, 3200 E. ahquitz Canyon Way, Palm Springs. The ppurpose of the hearing is to consider Case 5.0934, a request by McCormack Baron Salazar STATE OF CALIFORNIA Inc., for an amendment to the General Plan Map to redeavate a portion of the property located at COLLnYy Of Riverside _- - - -_ _ the southwest corner of Vista Chino Drive and --- - - - gunnse Way from Professional (P) to Medium - -- — ----- Density Residential 12-15 units/acre (MI5) in or- der to facilitate the construction of 6 transitional housing units. The second request is for 5.09434 - PD-281, an application by McCormack Baron Salazar Inc. to construct Vista Sunrise Health, Housing, and Hu- man Services Complex located at the southwest corner of Vista Chino Drive and Sunrise Way, Zone P and R-2,Section 11.The project will con- sist of an 85 unit transitional housing complex and an approximately 36,114 square foot Family Care Center building complex. The to housing will consist of 48 studio apartments and I am a citizen of the United States and a resident of 36 one and 7 two bedroom units. The 48 studio units are intended to serve the general homeless the County aforesaid;I am over the age of eighteen po ulation with special needs "Special needs" is defined as individuals who meet one of the fol- years,and not a party to or interested in the lowing criteria: are developmentally disabled, are survivors of physical abuse, are homeless, have above-entitled matter.I am the principal clerk of a chronic illness including HIV and mental illness, hinter of the,DESERT SUN PUBLISHING are displaced teenagge parents(or expectant teen- 1 age parents).The 37 one and two bedroom units COMPANY a newspaper of eneral circulation, are intended to be [on term supportive housing g geared towards individuals who have shown a printed and published in the city of Palm Springs, commitment to improve their lives. The Family Care Center building complex will consist of ap- County of Riverside,and which newspaper has been proximately 25,000 square feet for a medical facil- ity to be operated by Riverside County Communi- ty a newspaper of general circulation by the Health Agency, 6,000 square feet of office space for non-profit organizations, and 3,500 Superior Court of the County Of Riverside,State Of square feet far a homeless day center to be oper- California order the date Of March 24,1988.Case sled by Episcopal Community Services Number 191236;that the notice,of which the VICINITYMAP annexed is a printed copy(set in type not smaller than non pa'iel,has been published in each regular and entire issue of said newspaper and not in any supplement thereof on the following dates,to wit: e I ' January 26th --------------------------------------------------------------- ? j --------------------------------------------------------------- All in the year,2003 I certify(or declare)under penalty of perjury that the foregoing is true and correct. - - 27th An Environmental Assessment has been prepared Dated at Palm s,S rin California this--------------day and will be reviewed by the Planning Commission Springs, Y at the meeting A draft Mitigated Negative Decla- January ration of Environmental Impact has been prepared for the subject proposal. Members of the public Of---------------------------------------2003 may view this document in the Department of Planning and Zoning, City Hall, 3200 E. Tahjuitz f - --I --- ---- Canyon Way, Palm So the and submit is ten -- - comments at or prior to the Planning Commission 7 `Z 1 hearing. -------- 5�7�� ------- If any group challenges the action e court, issues SlgllalLLC¢ raised may be limited es only those issues raised v the public hearing described p this notice l - �ning C correspondencemionhearing. at, or-prior to the_Plan- ning Commission hearing. An opportunity will be given at said hearing for all interested persons to be heard Questions regard- ing this case may be directed to Alex Meyerhoff, Principal Planner or Jag Yee, Associate Planner at (760)323-8245. PLANNING COMMISSION /a/Douglas R.Evans Director of Planning and Zoning -- _102 No.31 11 r,"Z _ 1rLf%JIFSTi^EIF-i-6 T Pf7R ATION .OTQR Palm Springs crate Park-! n rrEction l� -;�✓'S1 � , t:f�n}C�'aai`=ct RGc-::3 NOTICE IS HEIREBY GIVEN that the City of Palm Springs has determined that bidders for below designated project must be pre-qualified prior to Q�L submitting a bid on the p,ojeci. c6 ra Palm Springs Skate Park Construction, + Cry Project 02-23 p It is mandatory that the Concac,oi who performs / Y the structural concrete portion of the scope of work on this project be approved by the Cityto be I on the final qualified Bidder's list. The City will ��eO award to EITHER a p e-quaidred Class A general PROOF OF PUBLICATION 7 his is space for Count contractor committing to perform the structural P > concrete work with its own forces OR a Class A (20I5.5.C.C.P general contractor urLIbc g a structural concrete (Class lyp license) subcontractor who has suc- cessfully le pre-quahii with the Cityces for this will eel via this p min air ornr n process. s bid will he accepted from a Contractor that has failed to re comply with these bmit a bid a If two or more business mitres submit a bid as part of a Joint Venture, expect to submit a bid of part of Joint Ventura,tu each entity within the Joint Venture 1 must be separately qualified to bid.The last dais Fr automat a (till), completed C n tract is Friday,encouraged 90,uLr of 5:00 P.M.PM.Contractors STATE OF CALIFORNIA -_ - _ _ _ are encouraged io submit pie-quali'iCz"ion pac!;- County of Riverside ages as soon as possible, so that they may be notified of omissions of information to be reme- died or of their pro-qualification status well in advance of the bid advertisement for this project. Answers to queslions contained in the attached questionnaire,hibernation about current bonding capacity,notarized statement from surety,and the most recent reviewed or audited financial state- ments,with accompanying notes and suPPiemen- tal information, ale required. The City will use 'these documents as the basis of rahag Contractors in respect to the size and scope of contracts upon which each Contractor is qualified to bid.The City of P21m Springs reserves the right i I am a citizen of the United States and a resident of Proof of Public to check other sources available.The City's Sea- the Count aforesaid; I am over the aye of eighteen ------------------ f- Y , e g The City reserves the nigh, to adjust, increase, years,and not a party to or interested in the limit,suspend of rescind the pre-qualification t13 mg based on subsequendy learned information. above-entitled matter.I am the principal clerk of a Contractors whose rating clmnges Suffcreat to printer of the,DESERT SUN PUBLISHING disqualify them will be notified, and given en opportunity for a hearing consistent with the COMPANY a newspaper of general circulation, hearing procedures described below for appeal- printed and published in the city of Palm Springs, a p 9 g Whils it is the inieni County of Riverside,and which newspaper has been of the pre-qualification questionnaire and docu- ments required therewith to assist the City in adjudged a newspaper of general circulation by the determining bidder responsibility pnorto bid and I to aid the City in selecting the lowest responsible Superior Court of the County of Riverside,State of bidder, neither the fact of pre-quahficahon, nor California under the date of March 24, 1988.Case any pre-qualification rating,will preclude the City from a post-bid consideration and determination Number 191236, that the notice,of which the of whether a bidder has he quality, fitness, annexed is a printed copy(set in type not smaller capacity and experience to satisfactorily perform than non pan the proposed work, and has demonstrated theel,has been published in each regular requisite tnrstworthme=_s.The City of Palm and entire issue of said newspaper and not in any Springs,located in the Coachella Valley approxi- mately ,10 miles east of Los Angeles and id0 supplement thereof on the following dates,to wit: miles northeast of San Diego, intends to con- stant a skate park as a recreational facility for the November 26o' use of residents and visitors. - -----_---------------------_-------------------------------- The City Council charged City staff io construct a first class facility that would complement other City amenities.The City structured a design firm ---------------------------------------—---------_---------- selection process that was inclusive of the major' siakehald=_rs in the projects success, including All in the year 2002 members of the local skating community. Site I certify(or declare)under penalty of perjury that the Design Group, of Tempe, AZ, was ultimately selected as the design firm.Site Design,utilizing foregoing is true and correct, input from the local skating Communiy, has 26o' designed a first-class skate park of appro;:ini ly 30,000 square feet to be constructed adjacent Dated at Palm Springs,California this day is the City's Swim Cercer.The qualifications and November experience of the conhacor responsible for can- strucnng the complex concrete bawds Shapes of--------------------------------------,2002 and farms that are components of the desicm will be critical to the success of the skate park. For thrs reason the City is choosing to pre-qualily the general or sub-contractor who will construct -------- ----------------`---- these intricate skating surfaces. Signature It is anticipated that the oia process will conmin options for awarding is EITHER a pre-qual ned Class A general contractor committing to perform ilia structural concrete wort:with its own forces 11Y'� OR a Class A gooeial contractor utilizing a souc- o J l(2 ,L7 tural concrete (Class C-8 license) subcontractor I who has succeSSfUlly pro-qualified with the City for this project via this pre-qualification / thechic, in e City reserves ,iv nire to structure the tore m a manner deputed by tits Grty is be in its host iniervst. The piojecd, r-`.,f[Jsd C'Ey rmjcci 02-23 Patin in!in^s Il.2te PeJc f,;o19imch0n,vtilL no 31MUlla- re.usly whit wo,K an the adjacent Smrm Cem`o tr,;,,pF.�,o�,c-:• ,d,t C=n'",; i>nci House.qn K.Uce 'fo Grass A General Contrastor� Who �Concossion-„a,' ;.ip�'gvemenis) Coordination l 'Io"'G'd , i - €1,4 _o iae,,- F,, TLo of the two adjacent, separately funded projects Solnst_ral c`.;aac:e.e i-.V1 ons 0P The FN'cr:: will be done by staff of the Crty's D-apartment of Please he advised that the City of Palm Springs Public Works. will require structural concrete subcontractors to be Ine-qualified.Not ice to Structural Concrete In general, the skald pack work consists oc com- (C-8) (Sub)CoriteiC,Drs: F, list of pre-qualified plete clearing, grubbing and removals, building structural concrete (C-8) subcontractors will be demo,and construction of the skete park(all con- provided to all Class A general contractors bid- crate and decorative amenities,landscaping vn- ding this job. (Class A general contractors who gafion, lighting, sauces, walls, subsurface pre-qualify for structural concrete work via this drainage,etc,),It is contemplated that bids will be pre-qualification process and who commit to per- opened for this project in January of 2003.The farm the work with their own,pre-qualified,,`orces pie qualification packages should be submitted will not be required to subcontract this trade.) under seal and masked 'CONFIDENTIAL' to: TO ACQUIRE PRE-QUALIFICATION DOCU- I Jarold E.Good,CPP0 MENTS.Complete sets of pre-qualification dean- Director of Procurement&Contracting ments may be obtained by downloading them on City of Palm Springs ilia City's website at: 3200 East Tahqud<Canyon Way Palm Springs,CA 92262 www.chpahn-springs.ca.us. The pre-qualification packages (questionnaire From the main web page,go to ADepartmentsn. answers and financial statements) submitted by From Departments go to"Procurement". Contractors are not public records and are not open to public inspection.All information provid- QUESTIONS AND COMMUNICATIONS: All ed will he kept confidential to the extent permit- questions and communications relative to this I ed by law. Howevei, the contents may he cis- Work shall be directed to Harold E.Good,CPPO, closed to third parties for purpose of venfication, Director of Procurement & Contracting at 760- or investigation of substa"Sal allegations, or in 323-8239 or e-mailed to HaroldGOci.palm- the appeal hearing State law requires that the i springs.cams. names of contractors applying for pre-qualihca- HAROLD E.GOOD,CPPO tion status shall be public records subject to dis- Director of Procurement&Contracting crams, and the first page of the questionnaire Date:November 22,20g2 will he used for that purpose. 'ub:November 26,2002 Each questionnaire must be signed under penalty of perjury In the manner designated at the end of --- ----- the form, by an individual who has the legal authority to Gind the Contractor on whose behalf that person is signing.if any information provided by a Contractor becomes inaccurate, the Contractor must Immediately notify the City and piovide updated accurate inform=^non in writing, under penalty of perjury. The City reserves the right to waive minor irregu- lanties and omissions in the information con- rained in the pre-qualification application submit- ted, to make all final determinations, and to determine at any time that the pie-qualification procedures will not be applied to a specific future public works project. Contractors may submit pic-qualification pack- ages during regular working hours on any day that !Ilia offices of the City are open.Contractors who submit a complete pre-qualification package will t be notified of their Ml hficaiion status no later than ten business days after submission of the information, The City of Palm Springs may afuse to grant pre- qualification where the requested information and materials are not provided, or not provided by 5:00 PM, January 10, 2003. There is no appeal from a refusal for an incomplete or late applica- tion, but re-application for a later project is per- mitted. The closing time for bids will not be changed in order to accommodate supplementa- tion of incomplete submissions, or late suhmis- sions.Where a timely and completed application results in a rating below that necessary to pre- qualify, an appeal can be made. An appeal is begun by the Contractor delivering notice to City of Palm Springs of its appeal of the decision with respectto its pre-qualification rating,no laterthan ten business days prior to the closing time for the receipt of bids for this public works project. Without a timely appeal, the Contractor waives any and all rights to challenge the decision of City of Palm Springs, whather by administrative process, judicial process or any other legal Process or proceeding. Note:A Contrectoi may Iae found not pre-quali- ffed for bidding on a specific project fo be let by the City of Palm Springs, until the Contractor meets the Criy=s requirements. In addition, a Contractor may be found not pre-qualified far either: (H Onvstaou of roqucs,cd information or (2)Falsification of information MINUTE ORDER NO. APPROVING AND ADOPTING THE PLANS, SPECIFICATIONS AND WORKING DETAILS, AND AUTHORIZING ADVERTISEMENT FOR CONSTRUCTION BIDS FOR THE PALM SPRINGS SKATE PARK CONSTRUCTION, CITY PROJECT 02-23 I HEREBY CERTIFY that this Minute Order, approving and adopting the plans, specifications and working details, and authorizing advertisement for construction bids for the Palm Springs Skate Park Construction,City Project 02-23,was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 18`" day of December, 2002. PATRICIA A. SANDERS City Clerk 15� MINUTE ORDER NO, APPROVING AND ADOPTING THE PLANS, SPECIFICATIONS AND WORKING DETAILS, AND AUTHORIZING ADVERTISEMENT FOR CONSTRUCTION BIDS FOR THE SWIM CENTER, POOL HOUSE & CONCESSION STAND IMPROVEMENTS, CITY PROJECT 98-21 I HEREBY CERTIFY that this Minute Order, approving and adopting the plans, specifications and working details, and authorizing advertisement for construction bids for the Swim Center, Pool House&Concession Stand Improvements,City Project 98-21,was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 181h day of December, 2002. PATRICIA A. SANDERS City Clerk