Loading...
HomeMy WebLinkAbout7/1/2009 - STAFF REPORTS - 1.B. Message Page I or Jay Thompson From: Dolores Strickstein Sent: Tuesday, June 30, 2009 6:05 PM To: Jay Thompson Subject: FW:Viceroy CUP VdPa= 5�14&eC4a &4 4 P46M sA.ed O�(M d(tla erty. &C7Z (760) 323-8204 Fax: (760) 322-,F332 27oEw.eC.StrlciceteGc((��GnP+xeluia�gs-ca,9av cauad.�Pos,dfnie,9d.-ea.� . . From: Sheryl (bizy) Hamlin [mailto:sheryl@bizyinc.ccm] Sent: Monday, June 29, 2009 10:56 AM To: Chris Mills; Ginny Foat; Lee Weigel; Rick Hutcheson; Steve Pougnet Cc: CityClerk@palmsprings-ca.gov; Craig Ewing Subject: RE: Viceroy CUP Dear Mayor and Council Members, As a point of history, this is the third set of plans proposed for the Cahuilla streetscape. The first was in response to the 2003 appeal the neighborhood filed and won regarding the streetscape. This plan included a weathered, curved sidewalk, colored concrete and lush landscaping. The second plan was submitted in 2007 after a neighborhood meeting where the KOR Group informed the neighborhood that the 2003 plan was too expensive. This second plan removed the weathered look and reduced the plantings. Now this third plan removes the meandering sidewalks, retains the colored concrete and proposes minimal planting. They have eliminated the Belardo road improvements completely. Furthermore, the Viceroy owners have proposed an utterly ridiculous rollout plan that involves their average room rate revenue, putting the city in the role of revenue administrator- The Planning Commission rejected the Viceroy rollout plan and proposed the following schedule: . Phase 1 (June 1, 2009 — October 31, 2009) Cahuilla Road hardscape improvements (for pedestrians and parking areas) and paving of Cahuilla Road; this work should be in accordance with the street improvement plans approved by the city in July of 2007. . Phase 2 (November 1, 2009 —April 30, 2010): Landscaping improvements . Phase 3 (May 1, 2010 through December 31, 2010) Belardo Road improvements; this work should be constructed in accordance with the street improvement plans approved by the city in July of 2007. - So effectively, the Planning Commission is telling the Viceroy to utilize the 2007 plans under a specific construction schedule- J 7- 07 6/30/2009 % � Message Page 2 of 2 Note, that in 2007, when the neighborhood met regarding the 'downsized' plans, the KOR Group had already spun off the hotel into a local limited partnership, which has no access to KOR Group funds, of which there are plenty, and supposedly is living on its own revenues. This ownerhip transfer was never pointed out to the neighbors. Furthermore, the 'downsized' proposal in 2007 did NOT include the entire Cahuilla streetscape. They eliminated landscaping the property in front of La Serena saying they couldn't afford it. Our 2007 meeting was PRIOR to their requesting demolition for La Serena, so it is obvious now that they did not want to landscape La Serena because they planned to demolish it. When the KOR Group received the CUP, they also were granted a parking variance. They are short 15 spaces and could use another lot, particurly for the big film shoots they do where there are rigs parked along Cahuilla for blocks, so demolishing La Serena would give them the parking they need now. The 2007 meeting speaks to their continuing disingenuousness with the neighborhood and the city of Palm Springs. I question if the KOR Croup can transfer a CUP to a limited partnership. Was this a legal transfer? AT A MINIMUM, the Planning Commission's recommendation should be upheld, but frankly, I would revoke the CUP because they have not met up to their responsibilities under the CUP. 6/30/2009 ;OFpALAI Sp4 iy u ,n ' F Oaa�P°.roaR City Council Staff Report DATE: July 1, 2009 PUBLIC HEARING SUBJECT: VICEROY HOTEL CONSIDERATION OF A REVOCATION OR MODIFICATION OF AN EXISTING CONDITIONAL USE PERMIT LOCATED AT 415 SOUTH BELARDO ROAD (CASE 5.090-CUP) FROM: David H. Ready, City Manager BY: Office of the City Clerk SUMMARY: The item was noticed to be heard at the June 3, 2009, meeting. The applicant had requested this item be continued to July 1, 2009. Additional correspondence has been received from the applicant to continue this item to July 15, 2009. RECOMMENDATION: 1. Continue the Public Hearing to July 15, 2009, with no public testimony. 2. Direct the City Clerk to post a notice of continuance. mes Thompson City Clerk J David H. Ready, Esq., Ph City Manager Item No. 1 . B . pF P A L 4 { y `\ �l City Of office oC[lie Cicy Clerk y ` f )200 b."lulu}ujrr(nnynn \y/:ry' ° P;,Im $prinks, Cnlifarnm 92262 \C'PFo?, Tel. (760) 323-920zi " P.0 (760) 322-8332 ° %Vcb: www.palmYprinL�Y-ca.gov NOTICE OF CONTINUANCE NOTICE IS HEREBY GIVEN that the Regular Meeting of June 3, 2009, Public Hearing Item No. 1.8. VICEROY HOTEL CONSIDERATION OF A REVOCATION OR MODIFICATION OF AN EXISTING CONDITIONAL USE PERMIT LOCATED AT 415 SOUTH BELARDO ROAD, CASE 5.090-CUP: By a unanimous vote of the City Council of the City of Palm Springs the public hearing was continued to Wednesday, July 1, 2009, Council Chamber, 3200 E. Tahquitz Canyon Way, at 6:00 p.m., or as soon thereafter as possible. AFFIDAVIT OF POSTING State of California ) County of Riverside ) ss. City of Palm Springs ) I, James Thompson, City Clerk of the City of Palm Springs, California, certify this Notice of Continuance was posted at or before 5:30 p.m., June 4, 2009, as required by established policies and procedures. ames Thompson City Clerk NOTICE OF CONT-ViceroyHatel 06.03.2009 doc Pose Office Box 2743 ° Palm Springs, California 92263-2743