HomeMy WebLinkAbout7/1/2009 - STAFF REPORTS - 1.B. Message Page I or
Jay Thompson
From: Dolores Strickstein
Sent: Tuesday, June 30, 2009 6:05 PM
To: Jay Thompson
Subject: FW:Viceroy CUP
VdPa= 5�14&eC4a
&4 4 P46M sA.ed
O�(M d(tla erty. &C7Z
(760) 323-8204
Fax: (760) 322-,F332
27oEw.eC.StrlciceteGc((��GnP+xeluia�gs-ca,9av
cauad.�Pos,dfnie,9d.-ea.� . .
From: Sheryl (bizy) Hamlin [mailto:sheryl@bizyinc.ccm]
Sent: Monday, June 29, 2009 10:56 AM
To: Chris Mills; Ginny Foat; Lee Weigel; Rick Hutcheson; Steve Pougnet
Cc: CityClerk@palmsprings-ca.gov; Craig Ewing
Subject: RE: Viceroy CUP
Dear Mayor and Council Members,
As a point of history, this is the third set of plans proposed for the Cahuilla streetscape.
The first was in response to the 2003 appeal the neighborhood filed and won regarding
the streetscape. This plan included a weathered, curved sidewalk, colored concrete
and lush landscaping. The second plan was submitted in 2007 after a neighborhood
meeting where the KOR Group informed the neighborhood that the 2003 plan was too
expensive. This second plan removed the weathered look and reduced the plantings.
Now this third plan removes the meandering sidewalks, retains the colored concrete
and proposes minimal planting. They have eliminated the Belardo road improvements
completely.
Furthermore, the Viceroy owners have proposed an utterly ridiculous rollout plan that
involves their average room rate revenue, putting the city in the role of revenue
administrator- The Planning Commission rejected the Viceroy rollout plan and proposed
the following schedule:
. Phase 1 (June 1, 2009 — October 31, 2009) Cahuilla Road hardscape
improvements (for pedestrians and parking areas) and paving of Cahuilla Road;
this work should be in accordance with the street improvement plans approved by
the city in July of 2007.
. Phase 2 (November 1, 2009 —April 30, 2010): Landscaping improvements
. Phase 3 (May 1, 2010 through December 31, 2010) Belardo Road improvements;
this work should be constructed in accordance with the street improvement plans
approved by the city in July of 2007. -
So effectively, the Planning Commission is telling the Viceroy to utilize the 2007 plans
under a specific construction schedule- J 7-
07
6/30/2009 % �
Message Page 2 of 2
Note, that in 2007, when the neighborhood met regarding the 'downsized' plans, the KOR
Group had already spun off the hotel into a local limited partnership, which has no access to
KOR Group funds, of which there are plenty, and supposedly is living on its own revenues.
This ownerhip transfer was never pointed out to the neighbors.
Furthermore, the 'downsized' proposal in 2007 did NOT include the entire Cahuilla
streetscape. They eliminated landscaping the property in front of La Serena saying they
couldn't afford it. Our 2007 meeting was PRIOR to their requesting demolition for La Serena,
so it is obvious now that they did not want to landscape La Serena because they planned to
demolish it. When the KOR Group received the CUP, they also were granted a parking
variance. They are short 15 spaces and could use another lot, particurly for the big film shoots
they do where there are rigs parked along Cahuilla for blocks, so demolishing La Serena would
give them the parking they need now. The 2007 meeting speaks to their continuing
disingenuousness with the neighborhood and the city of Palm Springs.
I question if the KOR Croup can transfer a CUP to a limited partnership. Was this a legal
transfer?
AT A MINIMUM, the Planning Commission's recommendation should be upheld, but frankly, I
would revoke the CUP because they have not met up to their responsibilities under the CUP.
6/30/2009
;OFpALAI Sp4
iy
u ,n
' F Oaa�P°.roaR City Council Staff Report
DATE: July 1, 2009 PUBLIC HEARING
SUBJECT: VICEROY HOTEL CONSIDERATION OF A REVOCATION OR
MODIFICATION OF AN EXISTING CONDITIONAL USE PERMIT
LOCATED AT 415 SOUTH BELARDO ROAD (CASE 5.090-CUP)
FROM: David H. Ready, City Manager
BY: Office of the City Clerk
SUMMARY:
The item was noticed to be heard at the June 3, 2009, meeting. The applicant had
requested this item be continued to July 1, 2009. Additional correspondence has been
received from the applicant to continue this item to July 15, 2009.
RECOMMENDATION:
1. Continue the Public Hearing to July 15, 2009, with no public testimony.
2. Direct the City Clerk to post a notice of continuance.
mes Thompson
City Clerk
J
David H. Ready, Esq., Ph
City Manager
Item No. 1 . B .
pF P A L
4 { y
`\ �l City Of
office oC[lie Cicy Clerk
y ` f
)200 b."lulu}ujrr(nnynn \y/:ry' ° P;,Im $prinks, Cnlifarnm 92262
\C'PFo?, Tel. (760) 323-920zi " P.0 (760) 322-8332 ° %Vcb: www.palmYprinL�Y-ca.gov
NOTICE OF CONTINUANCE
NOTICE IS HEREBY GIVEN that the Regular Meeting of June 3, 2009, Public Hearing
Item No. 1.8.
VICEROY HOTEL CONSIDERATION OF A REVOCATION OR
MODIFICATION OF AN EXISTING CONDITIONAL USE PERMIT
LOCATED AT 415 SOUTH BELARDO ROAD, CASE 5.090-CUP:
By a unanimous vote of the City Council of the City of Palm Springs the public hearing
was continued to Wednesday, July 1, 2009, Council Chamber, 3200 E. Tahquitz
Canyon Way, at 6:00 p.m., or as soon thereafter as possible.
AFFIDAVIT OF POSTING
State of California )
County of Riverside ) ss.
City of Palm Springs )
I, James Thompson, City Clerk of the City of Palm Springs, California, certify this Notice of
Continuance was posted at or before 5:30 p.m., June 4, 2009, as required by established
policies and procedures.
ames Thompson
City Clerk
NOTICE OF CONT-ViceroyHatel 06.03.2009 doc