9</FORN�� CITY COUNCIL STAFF REPORT m
v
DATE: June 17, 2009 OLD BUSINESS
SUBJECT: LOFT PARTNERS PALM SPRINGS LLC — CASE NO. 5.1132 PLANNED p
DEVELOPMENT DISTRICT 333, AND CASE NO. 3.3002, TENTATIVE m
TRACT MAP NO. 35236 FOR THE DEVELOPMENT OF 200 HOTEL
ROOMS AND UP TO 200 CONDOMINIUM UNITS ON APPROXIMATELY C
10.47 ACRES LOCATED AT THE NORTHWEST CORNER OF AMADO rn
ROAD AND AVENIDA CABALLEROS
r
FROM: David H. Ready, City Manager O
BY: Department of Planning Services T1
m
SUMMARY Z
On April 22, 2009, the Planning Commission approved an amendment to the Final -I
Planned Development District (PDD) for the proposed Mondrian Hotel project. The
proposed amendment will accomplish the following:
• Development of the project in three phases.
• Parking to be accommodated as surface parking.
• Underground parking replaced with surface parking
• Hotel parking is provided on the approximately 1 acre parcel on the eastern edge CA
of the parcel along Caballeros and Amado. —�
• The site plan remains fairly consistent with the original site plan.
• The 5 story rear hotel structure will not extend as far north as previously planned.
• The front lobby area, which was previously 4 stories, is now only 2 stories.
• The hotel no longer has a drive in motor court but instead has a front drive with C7
drop off directly at the front entrance. ..i
• The theater no longer has fixed seating allowing for different uses and
reconfiguration.
Item No. T • V e
City Council Staff Report .tune 17,2009
Case:5.1132—PD 333 MM35236 Page 2 of 2
This report is provided to the City Council to complete a requirement of the Disposition
and Development Agreement (DDA). The applicant / developer will be available for
questions at the meeting; however, no Council action is necessary. r
FISCAL IMPACT: a
z
No fiscal impact. z
� rn
-'rag Awing, lCP Thomas Wilson(/Assistant City Manager