Loading...
HomeMy WebLinkAbout6/17/2009 - STAFF REPORTS - 2.L. U City Council Staff Repo Date: June 17, 2009 CONSENT CALENDAR Subject: AWARD OF CONTRACT FOR THE ARABY CIRCLE DRAINAGE IMPROVEMENTS PROJECT NO. 07-16 From: David H. Ready, City Manager Initiated by: Public works and Engineering Department SUMMARY Approval of this item will award the construction contract for installation of drainage improvements at the east end of Araby Circle to rectify a long standing drainage issue. RECOMMENDATION: 1) Approve Agreement No. in the amount of $69, 204.00 with Contreras Construction Co. Inc., for the Araby Circle Drainage Improvements, City Project 07-16. 2) Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: Over the past several years Engineering staff has been actively pursuing a design that would rectify a long standing drainage problem that exists for the residents at the east end of Araby Circle adjacent to the Palm Canyon Wash. Drainage flows down the public street and due to the channel levee and block wall, has no outlet and therefore ponds onto the adjacent property. The design as initially proposed, was to construct a storm drain with an outlet through the levee into the wash, which is maintained by the Riverside County Flood Control and Water Conservation District (RCFCWCD). Staff pursued permission to construct this drain through the encroachment permit process with RCFCWCD, however in July, 2008, just before the time when a permit was expected, district staff reconsidered the permission and informed us that a different design would need to be pursued. This was due to district staff fearing backflow into the public street at times when the Palm Canyon Wash was flowing in a condition where the water surface was at a significant depth in the channel. Staff therefore redesigned the improvements such that the drain would outlet into a series of drywells to be maintained by City staff. Item No. 2 . L . The plans and specification were prepared by Department staff, and on April 30 and May 7, 2009, the project was advertised for bids, and at 2:00 p.m. on June 2, 2009, the Procurement and Contracting Division received construction bids from the following contractors: 1. Contreras Construction; Indio, CA; $69,204.00 2. Dateland Construction; Indio, CA; $72,908.00 3. Tri Star Contracting Inc.; Desert Hot Springs, CA; $76,435.00 4. G & M Construction; Palm Springs, CA; $77,970.00 5. KZC Construction Inc.; Riverside, CA; $83,000.00 6. TBU Inc.; Beaumont, CA; $89, 555.00 7. Way Service Inc.; Cherry Valley, CA; $94, 959.00 S. NPG Corporation; Perris, CA; $98,910.00 9. JH Thompson and Sons; Bermuda Dunes, CA; $104,435,00 10. International Pavement Solutions; Mentone, CA;$105,390.00 11. MCZ Construction Inc.; Redlands, CA; $128,753.00 12, Kelly's Underground and Co.; Apple Valley, CA; $130,854.00 13. Granite Construction Co.; Watsonville, CA; $136,660.00 14. O'Connell Engineering; Winchester, CA; $397,214.50 The Engineer's estimate for this project was $90,000.00 The lowest responsive bidder is Contreras Construction Co., Inc. The company is a California corporation and its officers are: Enrique Contreras, President; and Ruben Contreras, Secretary. FISCAL IMPACT: Sufficient funds are available in Gas Tax Accounts 133-4298-50250 (Araby Drainage) and 133-4298-50242 (City Wide Curbs). No local funds are required for this project. �U David J. Barakian Thomas J. Wilson Director of Public Works/City Engineer Assistant City Manager David H. Ready, C er ATTACHMENTS: 1. Agreement from specifications , v AGREEMENT THIS AGREEMENT made this day of , 2009, by and between the City of Palm Springs, a charter city, organized and existing in the County of Riverside, under and by virtue of the laws of the State of California, hereinafter designated as the City, and Contreras Construction Co. hereinafter designated as the Contractor. The City and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 -- THE WORK The Contractor shall complete the Work as specified or indicated under the Bid Schedule(s) of the City's Contract Documents entitled: ARABY CIRCLE DRAINAGE IMPROVEMENTS CITY PROJECT NO. 07-16 The Work is generally described as follows: Removal of existing roll curb and asphalt concrete pavement, and construction of new roll curb, asphalt concrete pavement, catch basin, storm drain and drywell system, located at the east end of Araby Circle. ARTICLE 2 -- COMMENCEMENT AND COMPLETION The Work to be performed under this Contract shall commence on the date specified in the Notice to Proceed by the City, and the Work shall be fully completed within the time specified in the Notice to Proceed. The City and the Contractor recognize that time is of the essence of this Agreement, and that the City will suffer financial loss if the Work is not completed within the time specified in Article 2, herein, plus any extensions thereof allowed in accordance with applicable provisions of the Standard Specifications, as modified herein. They also recognize the delays, expense, and difficulties involved in proving in a legal proceeding the actual loss suffered by the City if the Work is not completed on time. Accordingly, instead of requiring any such proof, the City and the Contractor agree that as liquidated damages or delay (but not as a penalty), the Contractor shall pay the City the sum of $675 for each calendar day that expires after the time specified in Article 2, herein. In executing the Agreement, the Contractor acknowledges it has reviewed the provisions of the Standard Specifications, as modified herein, related to liquidated damages, and has made itself aware of the actual loss incurred by the City due to the inability to complete the Work within the time specified in the Notice to Proceed. ARABY CIRCLE DRAINAGE IMPROVEMENTS AGREEMENT FORM CITY PROJECT NO.07-16 AGREEMENT AND BONDS-PAGE 1 4127109 ARTICLE 3 -- CONTRACT PRICE The City shall pay the Contractor for the completion of the Work, in accordance with the Contract Documents, in current funds the Contract Price(s) named in the Contractors Bid and Bid Schedule(s). ARTICLE 4 --THE CONTRACT DOCUMENTS The Contract Documents consist of the Notice Inviting Bids, Instructions to Bidders, the prevailing rate of per diem wages as determined by the Director of the California Department of Industrial Relations, the accepted Bid and Bid Schedule(s), List of Subcontractors, Non-collusion Affidavit, Bidder's General Information, Bid Security or Bid Bond, this Agreement, Worker's Compensation Certificate, Performance Bond, Payment Bond, Standard Specifications, Special Provisions, the Drawings, Addenda numbers 1 to 2, inclusive, and all Change Orders and Work Change Directives which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto. ARTICLE 5 -- PAYMENT PROCEDURES The Contractor shall submit Applications for Payment in accordance with the Standard Specifications as amended by the Special Provisions. Applications for Payment will be processed by the Engineer or the City as provided in the Contract Documents. ARTICLE 6 -- NOTICES Whenever any provision of the Contract Documents requires the giving of a written Notice, it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or Certified mail, postage prepaid, to the last business address known to the giver of the Notice. ARTICLE 7 -- MISCELLANEOUS Terms used in this Agreement which are defined in the Standard Specifications and the Special Provisions will have the meanings indicated in said Standard Specifications and the Special Provisions. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The City and the Contractor each binds itself, its partners, successors, assigns, and legal representatives, to the other party hereto, its partners, successors, assigns, and legal representatives, in respect of all covenants, agreements, and obligations contained in the Contract Documents. ARABY CIRCLE DRAINAGE IMPROVEMENTS AGREEMENT FORM CITY PROJECT NO.07-16 AGREEMENT AND BONDS-PAGE 2 4/27/09 IN WITNESS WHEREOF, the City and the Contractor have caused this Agreement to be executed the day and year first above written. APPROVED BY THE CITY COUNCIL: ATTEST: CITY OF PALM SPRINGS, CALIFORNIA Date By Agreement No. City Clerk APPROVED AS TO FORM: By City Attorney Date CONTENTS APPROVED: By City Engineer Date By City Manager Date ARABY CIRCLE DRAINAGE IMPROVEMENTS AGREEMENT FORM CITY PROJECT NO.07-16 AGREEMENT AND BONDS-PAGE 3 L1 arvios Corporations require two notarized signatures: One signature must be from Chairman of Board, President, or any Vice President. The second signature must be from the Secretary, Assistant Secretary, Treasurer, Assistant Treasurer,or Chief Financial Officer. CONTRACTOR: Name: Check one:_,Individual_Partnership_Corporation Address: By: By' Signature (notarized) Signature (notarized) Name: Name: Title: Title: (This Agreement must be signed in the above This Agreement must be signed in the above space by one of the following: Chairman of the space by one of the following: Secretary, Chief Board, President or any Vice President) Financial Officer or any Assistant Treasurer) State of _ State of L County of 1 Iss County of ss On On before me, before me, personally appeared personally appeared who proved to me on the basis of satisfactory who proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) evidence to be the person(s) whose name(s) is/are subscribed to the within instrument and is/are subscribed to the within instrument and acknowledged to me that he/she/they executed acknowledged to me that he/she/they executed the same in his/her/their authorized capacity(ies), the same in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the and that by his/her/their signatures(s) on the instrument the person(s), or the entity upon behalf instrument the person(s), or the entity upon behalf of which the person(s) acted, executed the of which the person(s) acted, executed the instrument. instrument. I certify under PENALTY OF PERJURY under the I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing laws of the State of California that the foregoing paragraph is true and correct. paragraph is true and correct. WITNESS my hand and official seal. WITNESS my hand and official seal, Notary Signature: Notary Signature: Notary Seal: Notary Seal: ARABY CIRCLE DRAINAGE IMPROVEMENTS CITY PROJECT NO.07.16 AGREEMENT FORM 4/2710e AGREEMENT AND BONDS-PAGE 4