Loading...
HomeMy WebLinkAbout11/7/2001 - STAFF REPORTS (8) DATE: November 7, 2001 TO: City Council FROM: Assistant City Manager- Special Projects AIRPORT HOLD ROOM DESIGN CONTRACT- FABRIC ROOF CHANGE ORDER RECOMMENDATION: It is recommended that City Council approve Amendment No. 1 to Agreement No. A4382 with Genslerto incorporate a subcontract special structural engineering forthe fabric roof structure in an amount not to exceed $14,375. SUMMARY: This item would add a sub consultant to provide the special engineering needed for the fabric roof portion of the addition. BACKGROUND: The Airport has begun the design work for the replacement of the temporary holdrooms with the Airport Architect Gensler. The preliminary design includes an expansion of the fabric roof structure. That structure is a sole source proprietary product which effects the structural design of the building. The proposed Amendment would authorize Gensler to subcontract with Birdair for the structural reaction load design which is needed to complete the remainder of the structural design. Total cost of the subcontract is$14,375, including reimbursables. The cost is 90%reimbursable from an FAA grant with the remainder coming from the Airport Fund. Actual funds are available in account No. 415-6600-56046. A copy of the contract Amendment is attached, along with a Minute Order for City Council consideration. ALLEN F. SMOOT, AAE Assistant City Manager- Special Projects APPROVED-� ��F City Manager '�TT ATTACHMENTS: 1. Minute Order 2. Amendment No. 1 REVIEWED BY DEPT. OF FINANCE AMENDMENT NO. 1 AGREEMENT#A4382 -AIRPORT ARCHITECTURAL DESIGN THIS FI RSTAM ENDMENTto Agreement#A4382 for contract services,(herein"Agreement") made and entered into on the day of , 2001, by and between the CITY OF PALM SPRINGS (herein "City") and GENSLER (herein "Architect") is hereby amended effective , 2001, as follows: 1. Exhibit "A" Scope of Services, is hereby amended by adding the following: FABRIC ROOF PRELIMINARY DESIGN SCOPE At the request of the City of Palm Springs, Gensler has agreed to retain Birdair forthe preliminary structural design of the new fabric structures that are part of the project. The structural design will include only those elements required to provide structural reaction loads of the fabric structures to the foundation attachment points, for use by Gensler's project structural engineering consultant, Brandow Johnston, in the design of the foundations. The remainder of the fabric structure design and fabric structure structural design ("Remainder Services') will be separately performed by Birdair as part of the Construction Contract, and is not part of Gensler's Contract. The Scope of Work by Birdair is as follows: 1. Develop computer generated shape and analysis model of the design, along with color graphic. 2. Develop project specifications. 3. Provide reaction loads of the fabric structure to its attachments points, design of which shall be by the project structural engineer. Coordinate with project structural engineering consultant any interface between the fabric structure and conventional structure. 4. One trip by Birdair project engineer to either Palm Springs project site or Gensler's Santa Monica offices. Neither Birdair nor Gensler shall be obligated to perform the Remainder Services by this Work Authorization, nor shall Gensler bear any liability, risk or responsibility for the "Remainder Services' ultimately performed by Birdair or any other consultant under separate contract with the City of Palm Springs or its Contractor. 2. Exhibit "B" Special Requirements, is hereby amended by adding an approved subcontractor to Section 4.3 of Birdair. 3. Exhibit "C" Schedule of Compensation is hereby amended by adding a Special Pay item entitled"Fabric Roof Preliminary Structural Design" at a fixed fee of$14,375 to include reimbursables. 4. Exhibit"D"Schedule of Performance is hereby amended by including the Fabric Roof Preliminary Structural Design work item #2 in the Schedule of Performance. Except as specifically worded herein, all terms and conditions of the agreement shall remain in full force and effect and performance of services under the Amendment shall be governed by the provisions of the Agreements. � Z IN WITNESS WHEREOF,the parties have executed and entered into this Agreement as of the date first written above. ATTEST: CITY OF PALM SPRINGS, CALIFORNIA By City Clerk City Manager APPROVED AS TO FORM: City Attorney CONTRACTOR: (Check One: individual, partnership, corporation) (NOTARIZED) By: Signature Print Name and Title (NOTARIZED) By: Signature Print Name and Title Mailing Address: (Corporations require two signatures; one from each of the following: A. Chairman of Board, President,any Vice President;ANDB. Secretary,Assistant Secretary,Treasurer,Assistant Treasurer, or Chief Financial Officer.) End of Signatures .��9 3 MINUTE ORDER NO. APPROVING AMENDMENT #1 TO AGREEMENT #A4382 WITH AIRPORT ARCHITECT GENSLER TO ALLOW FOR SPECIAL ENGINEERING RELATED TO THE FABRIC ROOF STRUCTURE INAN AMOUNT NOT TO EXCEED $14,375. I HEREBY CERTIFY that this Minute Order approving Amendment #1 to Agreement #A4382 with Airport Architect Gensler to allow for special engineering related to the fabric roof structure in an amount not to exceed $14,375, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 7" day of November 2001. PATRICIA A. SANDERS City Clerk