City Council Staff Report
JULY 25, 2007 CONSENT CALENDAR
Subject: AWARD OF CONTRACT FOR THE GENE AUTRY TRAIL WIDENING,
(VISTA CHINO TO UPRR), CITY PROJECT NO. 02-03
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
The Public Works and Engineering Department, through its consultant, HDR
Engineering, has prepared construction documents for the Gene Autry Trail Widening,
City Project No. 02-03. This project is the first of three planned major roadway projects
on Gene Autry Trail, extending from Vista Chino to Interstate 10. Award of this contract
will allow staff to proceed with the roadway improvements on Gene Autry Trail.
RECOMMENDATION-
1) Adopt Minute Order No. "APPROVING AGREEMENT NO. IN THE
AMOUNT OF $4,383,933 WITH MC KENNA GENERAL ENGINEERING INC.,
FOR BID SCHEDULES A AND B, FOR THE GENE AUTRY TRAIL WIDENING,
(VISTA CHINO TO UPRR), CITY PROJECT NO. 02-03;" and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
On March 3, 2003, City Council awarded a contract services agreement to HDR
Engineering, Inc., for the widening of Gene Autry Trail from two to four lanes through
the Whitewater River, and from two to six lanes with a raised median between Vista
Chino and Via Escuela, with a new traffic signal at Gene Autry Trail and Via Escuela.
This project is the first of three projects to construct a completely widened transportation
corridor along Gene Autry Trail from Vista Chino to Interstate 10.
This project also includes construction of a public sewer extension in Gene Autry Trail
from Vista Chino to Via Escuela. The Alexander Village development by Contempo
Homes located on Via Escuela previously approved by Council requires the sewer
extension, and has been conditioned to construct the extension. Included in Council's
City Council Staff Report
July 25, 2007- Page 2
Gene Autry Trail Widening (CP 02-03)
approval was the requirement to coordinate with the City's planned widening of Gene
Autry Trail, and in the event the City's project preceded the development project, the
City would include the sewer construction in its contract to be paid by the developer. In
discussions with Contempo Homes, the developer was intending on constructing the
sewer extension in April 2007, however, as their schedule has slipped over the last
several months, the sewer construction is included in the scope of work. The City's
costs for the sewer extension will ultimately be reimbursed by the developer.
The plans and specifications were prepared by the City's consultant, HDR Engineering,
and on June 19 and 26, the project was advertised for bids, and at 3:00 P.M. on July 23,
2007, the Procurement and Contracting Division received construction bids from the
following contractors:
1. Hazard Construction Company, San Diego: $4,775,335
2. Granite Construction Company, Indio; $4,839,405
3. Mc Kenna General Engineering Inc., Corona; $4,383,933
4. Skanska USA Civil, Riverside; $4,395,000
Refer to Attachment 1 for the Bid Summary.
The Engineer's Estimate was $4,482,088.29 for Bid Schedule A, $498,500 for Bid
Schedule B, for a total of $4,980,588.29. The law bid was submitted by Mc Kenna
General Engineering, Inc. The company is a California corporation, and its officers are:
Tim McKenna, President; Ham Kazerooni, Vice President/Secretary; and Jason
Caufield, Vice President.
FISCAL IMPACT:
All costs associated with this project are reimbursed up to 75% by Regional Measure A
funding. Currently, Agreement No. 4393 with CVAG provides the City with $7,875,000
in Regional Measure A funding for the Gene Autry Trail projects. In accordance with
Agreement No. 4393, sufficient funding is available in Regional Measure A account 134-
4497-50217. Funding is also available in Local Measure A account 134-4498-50217.
Sufficient funding associated with the sewer construction work is available through
sewer funds, in account 420-6800-50000, to be reimbursed in the future by Contempo
Homes pursuant to its Subdivision ImprovemeAgreement with the City.
David J. Barakian Thomas J. Win
Director of Public Works/City Engineer Assistant City Manager
David H. Ready, City ger
ATTACHMENTS: 1. Bid Summary, 2. Minute Order
w
ATTACHMENT
BID SUMMARY
�1
,Y
.1`
�r
h
J
GENE AUTRY TRAIL WIDENING
CITY PROJECT 02-03
BID SUMMARY
BID SCHEDULE A
Bid Schedule Engineers Estimate Hazard Construction Company Granite Construction Company
ID ITEIVI DESCRIPTION UANTI UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
1 Mobilization 1 LS 5129 493 29 512949329 s478 000 00 Sd78 000 00 $574,000 DD 5574 000 00
2 Traffic Control 1 LSES143,00000
$200 000 00 5169 000.00 $189 000 00 5275 00 0DO $275 000,00
3 Environmental Requiremen15I5WPPP-BMP 1 LS 5143 000 00 $294,000,00 5394,00000 $125000.00 S125,00000
Com liance
4 Remove Fxcshn A C.Pavement 23500 SF $47 000 00 3035 $8 225 e0 $200 54700000
5 Remove Exlstln Curb and Gutter 650 LF 3325000 $$.00 51 950 00 $1400 S910000
6 Remove Existin Block Wall 570 LF0 $2 850 00 $1600 $9120.00 s1 D 00 5570000
7 Remove Existin Wood Fence ISO LF S1 50000 S1700 S2 550.DD $1600 3240000
6 Remove Exlshn Chain Link Fence goo LF0 $9 00D 00 $11 00 $990000 312.00 $%$00.00
9 Remove Existiin A C Berm 110 LF0 $220DO S800 5880.00 81400 S1 540.00
10 Remove Existin Concrete Pavement 3 850 SF0 S7 700 00 $0.90 $3 4$5 00 03.00 $11 550 00
11 Cold Mill Existinq A C.Pavement 351 500 5F 3025 $87 675 00 SO 25 $67 a75.00 SO.10 $35 150.00
12 Construct Variable Thickness(2'Min.)A.C. SaO0 TON $100 00 $380 000 00 $73 50 5499,800,00 $72,00 $489,600,00
Pavement Overly
13 Construct 5W A C Pavement 7 150 TON $100.00 $715 000 00 S73 50 $525 525.00 S86 00 5614 900.00
14 Construct$'A.0 Pavement 1,350 TON $100 00 5135 OOO.OD $73.50 S90 225,00 $92 00 S124 200 00
15 Construct 4"Class 2 Aggregate Base 4,700 TON $45 00 S211 500 00 $25.00 1117500 00 $32 DO $150 400 00
16 Construct 3'CI255 2 Aggregate Base 1 200 TON 34500 $54 000 00 $25 00 S30 000 00 $29 00 $34 800 DO
17 Construct 4"P C.C.Sidewalk 18 000 SF $6 00 $108 000 00 $$70 S66 600 00 $5 OD S108 000 00
18 Construct P.C.C.Bus Tum-Out 1,500 SF $10.00 S15 ODD 00 310.50 $15 750.00 $28.00 $42 000.00
19 Construct Type A Curb Ram 4 EA 51 000.00 $4,000 00 51 000.00 $4,000.00 S3 200.00 312 800.00
20 Construct Tvpe C Curb Ram 1 EA 31 000,00 $1 000.00 $1 000 00 S1 OOO.OD S3 400 00 S3 400 00
21 Construct A.C.Curb Ramp $1,000 OD 3100000 $100000 $1 000 00 $1,80000 $160000
22 Construct 8"Curb and Gutter 2,150 1 LF 350.00 $107,$0000 $17.00 $36,550.00 S18.00 $35,700.00
23 Construct 6'Curb 2 600 LF S40.00 $104 000 00 51000 526 000.00 $15 00 S39 000,00
24 Construct P C C.Curb Return and Cross" 2 800 5F $10 DO $29,000 00 S8.50 $23 a00.00 514.00 339 200.00
Gutter
25 Construct Block Wall H=G 270 LF S175.00 54725000 $100 00 327 000 DD $260 00 S70 200 00
25 Construct Block Wall H=8 650 LF $2$0 OO S162 500 00 $250 00 $182 000 Do 527500 $178 7S0.00
27 Construct Retaining Wall(H=6)with Block 325 LF 333000 $107 25000 S645,00 $209 625 00 $305 00 599,125.00
Wall H=6
28 Construct Retaining Wall(H=8)with 81ook Wall H=6' 150 LF $440 00 S66,000 00 $650.00 $99,000 00 0435.00 $$5,2$0.00
29 Construct Retaining Wall(1-1=10')with Block 200 LF 357000 $114 000 00 372000 $144 000.00 S475,00 595 000.00
Wall H=6
30 Construct Retaining Well(H=12)with Block 250 LF S720 00 5180 000 00 $7$5.00 5183,750 00 $490 00 $122,500 00
Wall H=6'
31 Construct P.C.C.Cut-Off Wall 1,000 LF $100.00 $100 000.00 $260.00 $260,000.00 S145.00 $145 000.00
32 Unclassified Excavation 4 670 CY S25.00 0115 750.00 $22.00 $102 740.00 $65 00 S303 550 00
$$ Unclassified FIII 17 650 CY $25 00 S441 25D 00 5550 $97 075 00 $1.00 $17 650.00
34 Select Material 200 CY 33500 $7 000.00 $38.00 07,600.00 S74 00 514 8OO.OD
35 Structural Excavation 880 CY E25 00 522 000 00 39,00 S7 920,00 $45.00 $39,600 cc
36 Structural Backfill 1 910 CY 540.00 $7$,400 00 S31.00 $59 210.00 SHOD S105 050.00
37 Modify Existing Metal Gate 1 E4 S5 000.00 S5,D00 00 S11,00000 S11,000.00 $8,000.00 $8 000 00
3$ Adjust Water Valve to Grade 2 FA $500 00 $1 000.00 $600,00 S1 600 00 $1,600.00 $3 600 Oc
39 Ad'ust Storm Drain Manhole to Grade 2 EA s1 00O 00 S2 000 00 S900.00 $1,8W.00 $2 400 00 $4,a00.00
40 Install 4"PVC 240 LF $20.00 $4 500 00 S55 00 513 200.00 S31.00 $7 440 00
Al Install Type E Loop Detector 16 Fes. 5500 00 38 000 00 $aaD oD S6 400 00 $3 00.00 $4$00.00
42 Traffic Signal,Lighting&Electrical System 1 LS $150 000 00 3150,000 00 9207,000 00 $207 000 OD S250 000 00 $250 000.00
Gene Autry Trail aI Via Escuela
43 ITraffic Stioinq,Si na e&Markings 1 1 1,5 1 375 000.00 1 $75 000 00 S55 OOO 00 555 000.00 $78 000 00 S78,000.00
Bid Schedule A: $4,482,08$,29 Bid Schedule A: $4,$07,635.00 Bid Schedule Ac $4,419,155.00
Bid Schedule B: $498.500,00 Bid Schedule 6: $467,700.00 Bid Schedule B: $420,250,00
Total Bid: $4,980,533.29 Total Bid: $4.775.335.00 Total Bid: $4,83%405.00
GENE AUTRY TRAIL WIDENING
CITY PROJECT 02-03
BID SUMMARY
BID SCHEDULE A
Bid Schedule McKenna General Engineering Inc Skanska USA Clvil
57Re!M!0vn
DESCRIPTION UANTI UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL
ation 1 LS $135,00000 $135,000.0 $387,845.00 5387,845.0
Control 1 LS 5214 000.00 $214.000.0 5200,000.00 $200,000 0
mental RequirementslSWPPP-BMP 1 LS $334,000 00 $834.000,0 $400,000.00 5400,000 0
ance
e Existing A.C.Pavement 23,500 5F $1.24 $29,140.0 $1.00 523,500.0
e Existing Curb and Gutter 550 LF $15 3o S9 945.00 %4.50 52,925.0
e Existm Block Wall 570 LF 526.50 $15 105.0 $28.00 $151960.0
ove Existing Wood Fence 150 LF $23.80 $3,570.001 S1 950.0
a Remove Existing Chain Link Fence 900 LF $10.50 $9.450 0 S8.0o $7,200.00
9 Remove Existn A,C.Berm 110 LF $22 40 52.464.0 $330.00
10 Remove ExistingConcrele Pavement 3,850 SF 53.38 $13,013.0 52.00 $7,700.0
11 Cold Mill Existin A.C.Pavement 351 500 SF so 19 $6G,785.0 5025 $87,875.0
12 Construct Variable Thickness(2'Min.)A.0 6,800 TON $87 62 5595,816.0 5$1100 5414,800.0
Pavement Overly.
13 Construct 5'G"A.C.Pavement 7,150 TON $86 00 5614 900.0 $$Cl $429,000.0
14 Construct 3"A.C.Pavement 1 350 TON $91.00 $122 850 0 $60.00 $81 000.0
15 Construct 4"Class 2 Aggregate Base 4 700 TON $84 00 5159,800.0 $19 00 $89,300.0
16 Construct 3"Class 2 A re ale Base 1,200 TON 541.00 $49 200.0 519.00 $22,800 0
17 Construct 4"P.C.C.Sidewalk 18,000 SF $4,15 S74 700.0 "a3.50 563,000.0
18 Construct P.C.C.Bus Turn-Out 1 500 SF $11.73 517,595 0 511.00 $16 500.0
19 Construct Type A Curb Ram 4 EA $2 840 00 511,360.0 S$50.00 S3,400.0
20 Construct T e C Curb Ram 1 EA S4 350.00 $4,350 0 5845.00 $845.00
21 Construct A.C.Curb Ram 1 EA 55,100.00 $5,100.00 $1,200 00 S1,200001
22 Construct 8"Curb and Gutter 2,150 LF $21.24 S45 666.0 '$18.00 $38,700 0
23 Construct 6' Curb 2 G00 LF $19 88 $51,688.0 $21 00 $54,600.0
24 Construct Curb Return an Toss- 2,800ILF
13.89 $38 892 OD 59.00 25 200.00
25 Construct Block Wall H=6' 270 $129.00 $34,830.0 $275.00 $74250.0
20 Construct Block Wall H=8' 650 5324.00 5210,600 0 $285Ao $185.250.0
27 Construct Retaining Wall(H=6')with Block 325 $487.00 $158,275 0 5500 00 $1G2,500,0
Wall H 6'
28 Construct Retaining Wall(H=B')with Block 150 5670.00 $100.500.0 5625.00 $93,750 0Wall H=6'29Construct Retaining Wall(H=10')with Block P00 aS692.0C $188,400 11 $725.00 5145,000 0Wall H=6'30 Construct Retainng Wall(H=12')with Block 25o 5166,250 0 $77500 $193,750.0Wall H=6'31 Construct P.C.C.Cut-Off Wall 1 000 LF5179 810.0 $200,00 5200 000.032 unclassified Excavation 4,G7p CY $39695 0 $30.00 $140,100.033 Unclassified Fill 17,650 CY51588500 $11,00 5194,150.034 Select Material 200 CY819,200.0 530.00 $6 000 035 Structural Excavation 880 CY $11 440.0 $12 00 S10 560.0
36 Structural Backfill 1 910 CY 529.00 $55 390.0 518.00 $34 380 0
37 ModifyExistingMetal Gate 1 EA $12,000.00 512,000.0 S10 000.00 S10 E;
38 lAdjust Water Valve to Grade 2 EA $1 220.00 $P,440.0 5800.00 $1 600,0
39 �Ad ust Storm Drain Manhole to Grade 2 EA $750.00 11 500.0 $1,100.00 S2,2oo.0
40 Insta 4 24o LF 530.00 $7 200.00 522.00 S528000
280 00
41 Install 7 e E Leo Detector 1G EA $669.00 S10 704.0 $550 00 $8,800.0
42 Traffic Signal,Lighting&electrical System 1 LS 5224 oop 00 $224 000.0 $210,000 be $210 000.0
Gene AutryTrail at via Escuela
43 Traffic Striping Si na e&Markin s 1 LS $58 850.00 $58.850.0 $6Q0D0.00 S6o,000.0
Bid Schedule A: $4,214,323.00 Bid Schedule A: $4,113,200.00
Bid Schedule B: $169,610.00 Bid Schedule B: $281,800.00
Total Bid: 54,383,933.00 Total Bid: $4,395,000.00
GENE AUTRY TRAIL WIDENING
CITY PROJECT 02-03
BID SUMMARY
BID SCHEDULE e
Bid Schedule Engineer's Estimate Hazard Construction Company Granite Construction Company
ID ITEN DESCRIPTION UANTI UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
1 Sheeting,Shoring&Bracing(or Equivalent 1 LS $50 000.00 $50,000.00 $5,000.00 $5,000.00 $22,000.00 522,000.00
Method
2 Construct 8"V.C.P.Sewer Main 1 450 LF $250 00 $362,500.00 5280.00 $406 000,00 $215.00 5311,750.00
3 Construct 8"D.LP.Sewer Main 20 LF $300 00 $6 000.00 5300 00 $6,000.00 $225.00 $4,500 00
4 Construct Sewer Manhole 6 EA S7 500 00 S45 000 00 $4,500.00 $27 000 00 $7,000.00 $42,000.00
5 Construct Sewer Clean-Out 1 EA S5 000 00 $5 000 00 $2 100 00 $2,100.00 $4,000.00 $4,000,00
6
Grind&Overlay Existing A.C. Pavement(Depth=0.15' 12,000 SF $2 50 530,000.00 $1.80 521,600.00 $3.00 $36,000,00
$493,500.00 $467,700.00 $420.250.00
GENE AUTRY TRAIL WIDENING
CITY PROJECT 02-03
BID SUMMARY
BID SCHEDULE B
Bid Schedulo McKenna General Engineering Inc Skanska USA Civil
ID ITEN DESCRIPTION QUANTI UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL
1 Sheeting,Shoring&Bracing or Equivalent 1 LS $8,400.00 58,400 00 $9,500.00 S9 500.00
2 Construct 8"V.C.P.Sewer Main 1,450 LF $83.00 $120.350 00 5150.00 $217,500 00
3 Construct 8"D.I.P,Sewer Main 20 LF $84 50 57.690.00 $130.00 52,600.00
4 Construe Sewer Manhole 6 EA $4 560.00 S27 360 00 $5 500.00 S33 000.00
5 Construct Sewer Clean-Out 1 EA $530 00 5530 00 S1 200.00 $1,200.00
5 Grind&Overlay Existing A.C. Pavement 12.000 SF $0,94 511,280.00 $1 501 S18 000.00
$169,610.00 $281,800.00
� rr.
,r
1 `
ATTACHMENT
MINUTE ORDER
.1
'G
r
MINUTE ORDER NO.
APPROVING AGREEMENT NO. IN THE
AMOUNT OF $4,383,933 WITH MC KENNA
GENERAL ENGINEERING INC., FOR BID
SCHEDULES A AND B, FOR THE GENE AUTRY
TRAIL WIDENING, (VISTA CHINO TO UPRR), CITY
PROJECT NO. 02-03
I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that
this Minute Order approving Agreement No. in the amount of $4,383,933
with Mc Kenna General Engineering, Inc., for Bid Schedules A and B, for the
Gene Autry Trail Widening (Vista Chino to UPRR), City Project 02-03, was
adopted by the City Council of the City of Palm Springs, California, in a meeting
thereof held on the 25th day of July, 2007.
James Thompson, City Clerk
;o pPLM gA�
i2
G
� N
nn
�° oqrto
City Council Staff Repo
JULY 25, 2007 CONSENT CALENDAR
Subject: AWARD OF CONTRACT FOR THE GENE AUTRY TRAIL WIDENING,
(VISTA CHINO TO UPRR), CITY PROJECT NO. 02-03
From, David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
The Public Works and Engineering Department, through its consultant, HDR
Engineering, has prepared construction documents for the Gene Autry Trail Widening,
City Project No. 02-03. This project is the first of three planned major roadway projects
on Gene Autry Trail, extending from Vista Chino to Interstate 10. Award of this contract
will allow staff to proceed with the roadway improvements on Gene Autry Trail.
RECOMMENDATION:
1) Adopt Minute Order No. "APPROVING AGREEMENT NO, IN THE
AMOUNT OF $ WITH FOR BID SCHEDULES A AND
B, FOR THE GENE AUTRY TRAIL WIDENING, (VISTA CHINO TO UPRR),
CITY PROJECT NO. 02-03;" and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
On March 3, 2003, City Council awarded a contract services agreement to HDR
Engineering, Inc., for the widening of Gene Autry Trail from two to four lanes through
the Whitewater River, and from two to six lanes with a raised median between Vista
Chino and Via Escuela, with a new traffic signal at Gene Autry Trail and Via Escuela.
This project is the first of three projects to construct a completely widened transportation
corridor along Gene Autry Trail from Vista Chino to Interstate 10.
This project also includes construction of a public sewer extension in Gene Autry Trail
from Vista Chino to Via Escuela. The Alexander Village development by Contempo
Homes located on Via Escuela previously approved by Council requires the sewer
extension, and has been conditioned to construct the extension. Included in Council's
ITEM NO.—2
City Council Staff Report
July 25, 2007- Page 2
Gene Autry Trail Widening (CP 02-03)
approval was the requirement to coordinate with the City's planned widening of Gene
Autry Trail, and in the event the City's project preceded the development project, the
City would include the sewer construction in its contract to be paid by the developer. In
discussions with Contempo Homes, the developer was intending on constructing the
sewer extension in April 2007, however, as their schedule has slipped over the last
several months, the sewer construction is included in the scope of work. The City's
costs for the sewer extension will ultimately be reimbursed by the developer.
The plans and specifications were prepared by the City's consultant, HDR Engineering,
and on June 19 and 26, the project was advertised for bids, and at 3:00 P.M. on July 23,
2007, the Procurement and Contracting Division received construction bids from the
following contractors:
1.
Refer to Attachment 1 for the Bid Summary.
The Engineer's Estimate was $5,000,000. The low bid was submitted by
The company is a , and its principal officer(s) is(are)
FISCAL IMPACT:
All costs associated with this project are reimbursed up to 75% by Regional Measure A
funding. Currently, Agreement No. 4393 with CVAG provides the City with $7,875,000
in Regional Measure A funding for the Gene Autry Trail projects. In accordance with
Agreement No. 4393, sufficient funding is available in Regional Measure A account 134-
4497-50217. Funding is also available in Local Measure A account 134-4498-50217.
Sufficient funding associated with the sewer construction work is available through
sewer funds, in account 420-6800-50000, to be reimbursed in the future by Contempo
Homes pursuant to its Subdivision Improvement Agreement with the City.
David J. Barakian Thomas J. son
Director of Public Works/City Engineer Assistant City Manager
David H. Ready, I y ger
ATTACHMENTS:
1. Bid Summary
2. Minute Order
L+000O �
ATTACHMENT
BID SUMMARY
TO BE PROVIDED AFTER THE BID OPENING.
OZ003
M
ATTACHMENT
MINUTE ORDER
r
i
U00���
MINUTE ORDER NO.
APPROVING AGREEMENT NO. IN THE
AMOUNT OF $ WITH
FOR BID SCHEDULES A AND B, FOR THE GENE
AUTRY TRAIL WIDENING, (VISTA CHINO TO
UPRR), CITY PROJECT NO. 02-03
I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that
this Minute Order approving Agreement No. in the amount of $
with , for Bid Schedules A and B, for the Gene Autry Trail
Widening (Vista Chino to UPRR), City Project 02-03, was adopted by the City
Council of the City of Palm Springs, California, in a meeting thereof held on the
25th day of July, 2007.
James Thompson, City Clerk