HomeMy WebLinkAbout9/19/2001 - STAFF REPORTS (5) l
DATE: September 19, 2001
TO: City Council
FROM: Director of Public Works/City Engineer
CONSTRUCTION CHANGE ORDER NO, 4 TO E.L. YEAGER CONSTRUCTION CO.
RECOMMENDATION:
That the City Council approve Construction Change Order No. 4 to E.L. Yeager
Construction Co., for an increase of $45,150.54 for the East Palm Canyon/Gene
Autry Trail Widening, City Project No. 92-36
SUMMARY:
Balancing change orderforall bid items that went over and under contract quantities
and providing 8 each, 36 in. box trees, to Summerset Springs complex.
BACKGROUND:
On May 17, 2000, City Council of the City of Palm Springs awarded E.L. Yeager
Construction Co. "the contract for the E. Palm Canyon/Gene Autry Trail Widening
project.
All increased and decreased bid items were field measured by both the City
Inspector and Contractor. Total quantities were agreed by both parties. For bid item
13, AC pavement (Type B), this increase was due to Caltrans. They required the
pavement section to be 6 in. thick in lieu of 4 in. thick, per the plan. This pavement
section change was only in the Caltrans right-of-way.
The City proposes to provide the Summerset Springs complex with 8 African Sumac
trees, 36 in. box, due to the major landscape changes between existing and
proposed that resulted in open areas between the reduced parkway and the
residences. The Association agrees to continue to maintain the irrigation and
landscape from the property line along E. Palm Canyon to the new aligned curb,
including the eight new trees.
The Association will conform with the following conditions:
(1) The contractor will deliver the 8 trees to the site where the Association will
designate the unloading area for these trees. The Association will inspect
the condition of these trees prior to unloading them.
(2) The Association will unload the trees.
(3) The Association will excavate and plant the trees, including any soil
amendments they need to provide for each tree.
(4) The Association will provide all the necessary irrigation for these trees.
(5) The Association will maintain the new trees.
(6) The City and the City's contractorwill be held harmless of any liability if these
trees are damaged when they are unloaded and if any of the new trees die
after they are planted. The City will not provide any maintenance on these
new trees.
ZA
Change Order No. 4 to CP#92-36
September 19, 2001
Page 2
(7) The Association will walk with the City Inspector to locate where the new
trees will be planted.
Funds are available in Measure A Regional Share account number 4497-50174 (E.
Palm Canyon/Gene autry Trail Widening). This project is 74% reimbursable from
Riverside County Transportation Commission (RCTC).
DAVID J. BARAKIAN
Director of Public Works/City Engineer
APPROVEn�A7
���
City Manager
Attachments:
1. Minute Order
2. Change Order No. 4
3. Agreement
REVIEWED BY DEPI OF FINANCE
3AZ
o1-1 >°A.
City of Palm Springs
Engineering Department
A \•�O•A1 k0�n 1
3200 Tahqurtz Canyon Way• Palm Springs,CaLfornia 9226?
TEL (760)323-8253 • FAX(760)322-8360 •Too(760)964-9527
August 22,2001
Summerset Springs Homeowners Association
2601 S. Broadmoor Drive,#6
Palm Springs, CA 92264
Attention: David H. Greiner,PtSiElrrl-H.O.A.
Reference: City Project 92-36 East Palm Canyon Drive/Gene Autry Trail Widening
-Agreement and Conditions for trees the City will provide
The City of Palm Springs will be providing Summerset Springs Association with eight(8)African Sumac, 36
in. box trees. The Association agrees to continue to maintain the irrigation and landscape from the property
line along East Palm Canyon to the new aligned curb, including the eight new trees.
The Association will conform with the following conditions in receipt of the eight(8) new trees the City will
provide:
1. Yeager's contractor, Marina Landscape,will deliver the eight(8)African Sumac, 36 in. box trees to
the site where the Association will designate the unloading area for these trees.The Association
will inspect the condition of these new trees prior to unloading them.
2. The Association will unload the trees.
3. The Association will excavate and plant the trees, including any soil amendments they need to
provide for each tree.
4. The Association will provide all the necessary irrigation for these trees.
5. The Association will maintain the new trees.
6. The City of Palm Springs and the City's contractor will be held harmless of any liability if these
trees are damaged when they are unloaded and if any of the new trees dies after they are planted.
The City will not provide any maintenance on these new trees.
7. The Association will walk with the City Inspector to locate where the new trees will be planted for
as-built purposes.
If you have any questions, please call me (760)323-8253,x8735.
A4-2— I"
Pe .Agres mmerset Springs Representative
cc: Dave Barakian, Director of Public Works/City Engineer
Tom Cartwright, Engineering Field Supervisor
David Aleshire, City Attorney
Scott Mikesell, Director of Facilities/Parks
Post Office Box 2743 • Palm Springs, California 92263-2743 ��
CITY OF PALM SPRINGS
CONTRACT CHANGE ORDER
To: E.L. YEAGER CONSTRUCTION CO. Date: August 23, 2001
P.O. Box 87 Project No.: C.P. #92-36
Riverside. CA 92502 Project Name: E. Palm Canyon/Gene
Autry Trail Widening
Change Order No.: Four(4)
Attn: Gary Baxter- Superintendent Contract Purchase No.: 909476
Account Number(s): 4497-50174
Agr.#4223 M.O. #6618
A. CHANGES IN WORK:
Increase to Contract Bid Items:
Item Description
6 Remove Existing Curb and Gutter
7 Remove Existing PCC Sidewalk
13 AC Pavement (Type B)
15 8 in. PCC Curb and Gutter
17 Standard Gray PCC Sidewalk
22 38 in. x 60 in. Elliptical (Oval) CL II RCP
32 Adjust Manhole to Grade
39 Detail 10 Traffic Striping
41 Detail 23 Traffic Striping
42 Detail 32 Traffic Striping
44 Detail 36 Traffic Striping
47 Detail 38C Traffic Striping
49 Type IV Arrow
50 Type VI Arrow
51 12 in. White Line
Decrease to Contract Items:
16 PCC Cross Gutter and Spandrel
18 Colored PCC Sidewalk
25 18 in. RCP (D-2000)
33 Adjust Water Valve to Grade
38 Detail 9 Traffic Striping
43 Detail 33 Traffic Striping
45 Detail 37B Traffic Striping
46 Detail 38 Traffic Striping
Increase to Contract Items (New)
N Provide 8 each -African Sumac 36 in. box trees
3Ay
C.P.#92-36, EPC/GAT Widening
Change Order No. 4
Page 2 of 3
B. CHANGES IN CONTRACT COST:
Increase to Contract Bid Items:
Item Description
6 Remove Existing Curb and Gutter 50 L.F. @ $3.50 $ 175.00
7 Remove Existing PCC Sidewalk 507 s.f. @ $1.10 $ 557.70
13 AC Pavement (Type B) 1088.08 Tons @ $33 $35,906.64
15 8 in. PCC Curb and Gutter 118 L.F. @ $10 $ 1,180.00
17 Standard Gray PCC Sidewalk 1,932 L.F. @ $2.20 $ 4,250.40
22 38 in. x 60 in. Elliptical (Oval) CL II RCP 42 L.F. @ $158 $ 6,636.00
32 Adjust Manhole to Grade 1 Ea. @ $450 $ 450.00
39 Detail 10 Traffic Striping 52 L.F. @ $0.50 $ 26.00
41 Detail 23 Traffic Striping 70 L.F. @ $1 $ 70.00
42 Detail 32 Traffic Striping 40 L.F. @ $0.40 $ 16.00
44 Detail 36 Traffic Striping 118 L.F. @ $0.50 $ 59.00
47 Detail 38C Traffic Striping 100 L.F. @ $1 $ 100.00
49 Type IV Arrow 1 Ea. @ $50 $ 50.00
50 Type VI Arrow 1 Ea. @ $75 $ 75.00
51 12 in. White Line 32 L.F. @ $1.50 $ 48.00
Sub-Total: $49,599.74
Decrease to Contract Items:
Item Description
16 PCC Cross Gutter and Spandrel 142 S.F. @ $6 ($ 852.00)
18 Colored PCC Sidewalk 1,781 S.F. @ $3 ($5,343.00)
25 18 in. RCP (D-2000) 9 L.F. @ $60 ($ 540.00)
33 Adjust Water Valve to Grade 4 Ea. @ $250 ($1,000.00)
38 Detail 9 Traffic Striping 229 L.F. @ $0.20 ($ 45,80)
43 Detail 33 Traffic Striping 8 L.F. @ $1 ($ 8.00)
45 Detail 37B Traffic Striping 4. L.F. @ $1 ($ 4.00)
46 Detail 38 Traffic Striping 10 L.F. @ $0.40 ($ 4.00)
Sub-Total ($7,796.80)
Increase to Contract Items (New)
Item Description
N 8 each -African Sumac 36 in. box trees 8 Ea. @ $418.45 $3,347.60
TOTAL NET CHANGE ORDER = $ 45,150.54
NOTE: No additional markup will be added to any items in this Contract Change Order.
C. REASON FOR CHANGE:
All increased and decreased bid items were field measured by both the City Inspector and the
Contractor. Total quantities were agreed upon by both parties. For bid item 13 (AC Pavement (Type
B),this increase was due to Caltrans. They required the pavement section to be 6 in. thick in lieu of 4
in. thick per plan. This pavement section change was only in the Caltrans R/W.
ITEM N The City agreed to provide the Summerset Springs complex with 8 African Sumac trees, due
to the major landscape changes between exising and proposed that left open areas. The City will
provide these trees per the following conditions:
3 40450ft
C.P.#92-36, EPC/GAT Widening
Change Order No. 4
Page 3 of 3
1) The City delivers the 8 trees but the complex unloads the trees from the truck
2) The complex installs the trees, including trenching and adding soil amendments
3) The complex will provide irrigation for these trees
4) The City will be held harmless of any liability for any tree conditions that might occur
5) The City will not provide any maintenance period for these trees
D. SOURCE OF FUNDS:
Gene Autry Trail/E. Palm Canyon Widening Account No. 4497-50174 $45,150.54
Summary of Costs Cnntract Tima
Original Contract Amount: $1,198,952.00 Original Completion Date: Nov. 8, 2000
This Change Order: $ 45,150.54 Days Added for this C.C.O.:
Previous Change Order(s): $ 93,302.83 Previous Days Added: 137
Revised Contract Amount: $1,337,405.37 Revised Completion Date: June 8, 2001
i
I have received a copy of this Change Order and the City Approval:
above AGREED PRICES are acceptable to the
contractor. Submitted By Date
Field Engineering Supervisor
By Approved By Date
Director of Public Works/City Engineer
Title
Approved by Date
Date City Manager
Distribution:
Original Conformed Copies Conformed-File Copy
Engineering (1) Engineering File (1)
Finance (1) Engineering Field Inspector (1)
Contractor (1) Engineering Field Supervisor (1)
City Clerk (1) Purchasing Agent (1)
3440
MINUTE ORDER NO.
APPROVING CONSTRUCTION CHANGE ORDER NO.4 TO
E.L. YEAGER CONSTRUCTION CO. FOR AN INCREASE
OF $45,150.54 FOR THE EAST PALM CANYON/GENE
AUTRY TRAIL WIDENING, CITY PROJECT NO. 92-36
I HEREBY CERTIFY that this Minute Order approving Construction Change Order No. 4 to
E. L. Yeager Construction Co. for an increase of $45,150.54 for the East Palm
Canyon/Gene Autry Trail Widening, City Project No. 92-36,was adopted by the City Council
of the City of Palm Springs, California, in a meeting thereof held on the 19th day of
September 2001.
PATRICIA A. SANDERS
City Clerk
34