Loading...
HomeMy WebLinkAbout9/12/2001 - STAFF REPORTS (4) DATE: September 5, 2001 TO: City Council FROM: Director of Public Works/City Engineer BRIDGE REPAIRS PROJECT RECOMMENDATION: It is recommended that City Council approve the First Amendment to Agreement No. 4389 with the City of Cathedral City; and, approve Contract Change Order No. 1 to Commercial Diversified, Inc., for an increase of$74,999.84, for a total contract amount of $117,000.20, for the Bridge Repairs Project, City Project No. 97-20. SUMMARY: Initially, Agreement No. 4389 limited the amount of reimbursement to a level consistent with the Engineer's estimate, which was significantly lower than the actual bids received. The First Amendment to Agreement No. 4389 will increase the amount of reimbursement to reflect the actual bid received for the Ramon Road bridge repair work. Contract Change Order No. 1 will add the Ramon Road bridge repair work (Bid Schedule A) to the contract. BACKGROUND: On August 1, 2001, the City Council approved Agreement No. 4389 with the City of Cathedral City to secure reimbursement of costs associated with repair of the expansion joints on the Ramon Road bridge. As this bridge is jointly shared by both the City of Palm Springs and Cathedral City, maintenance costs are equally divided. The Agreement limited the amount of reimbursement to $15,000.00, or half of the Engineer's estimate of$30,000.00 for the repair work. On August 1, 2001, the City Council also awarded Commercial Diversified, Inc., a contract for the Bridge Repairs Project, City Project 97-20. That award was for Schedule B only, for the Sunrise Way bridge repair work. Bid Schedule A, for the Ramon Road bridge repair work, was not awarded, as the low bid significantly exceeded the Engineer's estimate, and coordination with Cathedral City was required to determine if additional funding would be made available to cover the actual bid received. As a result, on August 8, 2001, the Cathedral City Council approved an increase in funding to $42,500.00 to cover half of the cost for the Ramon Road bridge repair work and associated project administration and inspection costs. The proposed Amendment to the Reimbursement Agreement with Cathedral City will increase the maximum amount of reimbursement to$37,500.00 for construction costs, or half of the approximate$75,000.00 bid for the work. An additional$5,000 is funded by Cathedral City to reimburse half of project administration and inspection costs. Bridge Repairs Project September 5, 2001 Page 2 The proposed Contract Change Order covers the following items: Increase to Contract Items (New): Bid Schedule A, consisting of Item No. 1 (Traffic Control)and Item No. 2 (Joint Seal Assembly). Decrease to Contract Items: None. Ten additional work days will be added by this Contract Change Order. Sufficient funds are available in account no. 134-4498-50120 (Bridge Repairs). "�,J9 r yQq, DAVID J. BARAKIAN U ` Director of Public Works/City Engineer APPROVED: �l City Manager ATTACHMENTS: 1. Resolution 2. First Amendment to Agreement No. 4389 3. Contract Change Order No. 1 REVIEWED BY DEPT.OF FINANCE FIRST AMENDMENT TO AGREEMENT NO. 4389 WITH THE CITY OF CATHEDRAL CITY FOR RAMON ROAD BRIDGE REPAIRS CITY PROJECT NO. 97-20 Paragraph (a) of Section 2, CCC's Reimbursement Payments, of Agreement No. 4389 is hereby amended to read as follows: (a) Payment for half of all construction costs of the Project. Both parties agree that the total initial bid for construction of the Project is Seventy-Five Thousand Dollars ($75,000), of which CCC is responsible for fifty percent (50%), or Thirty-Seven Thousand Five Hundred Dollars($37,500). Payment shall be made in accordance with the bid item prices, as bid by the construction contractor. Except as specifically amended by this Amendment No. 1, all terms and provisions of Agreement No. 4389 remain in full force and effect. ATTEST: CITY OF PALM SPRINGS, a municipal corporation By: By: City Clerk City Manager APPROVED AS TO FORM: By: City Attorney Reviewed: CITY OF CATHEDRAL CITY, a municipal corporation By: By: City Engineer City Manager APPROVED AS TO FORM: GREEN, de BORTNOWSKY & QUINTANA, LLP By: Steven B. Quintanilla, City Attorney for City of Cathedral City CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: Commercial Diversified, Inc. Date: August 21, 2001 72033 Twentynine Palms Highway Project No. 97-20 Twentynine Palms, CA 92277 Project Name: Bridge Repairs Change Order No. One (1) Attn: Richard Corbalis Contract Purchase No: Account Numbers: 134-4498-50120 Agr.# 4388 M.O.# 6897 Res. # A. CHANGES IN WORK: Increase to Contract Quantities: Bid Schedule A: Item No. 1 Traffic Control LUMP SUM Item No. 2 Joint Seal Assembly (MR = 3") 134 LF Decrease to Contract Quantities: NONE B. CHANGES IN COST: Increase to Contract Quantities: Bid Schedule A: Item No. 1 LUMP SUM $15,000.00 Item No. 2 134 LF @ $447.76 per LF $59,999.84 SUBTOTAL $74,999.84 Decrease to Contract Quantities NONE SUBTOTAL ($0.00) TOTAL NET CHANGE ORDER AMOUNT $74,999.84 C. REASONS FOR CHANGES: Increase Items: Bid Schedule A, Items 1 and 2: Bid Schedule A was not originally awarded due to the fact that the cost was higher than estimated and budgeted by both the City of Palm Springs and Cathedral City. As the Ramon Road bridge is shared jointly by bath cities, coordination with Cathedral City was required to determine if additional funding over the Engineer's estimate was available to allow the work to proceed through implementation of a change order. That additional funding was secured by Cathedral City, and allows for this work to be added by this change order. Decrease Items: NONE. Ten (10) additional working days will be added to the contract as a result of this change order. NOTE: No additional markup will be added to any items in this Contract Change Order. All costs per each item are final. D. SOURCE OF FUNDS: Funds are available in the following account: Acct# 1 34-449 8-501 20 (Bridge Repairs) Summary of Costs Contract Time Original Contract Amount: $42,000.36 Original Completion Date: This Change Order: $74,999.84 Days Added for this C.C.O.: -10 Previous Change Order(s): $0.00 Previous Days Added: -0- Revised Contract Amount: $117,000.20 Revised Completion Date: I have received a copy of this Change Order and City Approval: the above totals are acceptable to the contractor. Submitted by By Date Engineering Field Supervisor Date Approved By Date City Engineer Approved By Date City Manager Distribution: Original Conformed Copies Conformed-File Copy Engineering (1) Engineering File (1) Finance (1) Engineering Field Inspector (1) Contractor (1) Engineering Field Supervisor (1) City Clerk (1) Purchasing Agent (1) 4P (0