HomeMy WebLinkAbout6/6/2007 - STAFF REPORTS - 2.L. ?ALM Sp U m 4 �``FOTL City Council Staff Report JUNE 6, 2007 CONSENT CALENDAR Subject: AWARD OF CONTRACT FOR THE PATENCIO LANE DRAINAGE IMPROVEMENTS, CITY PROJECT NO. 06-17 (PHASE 1) From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY This year, there are two locations where localized drainage improvements are proposed to cure drainage and flooding problems; one is located on Patencio Lane, and the other is located on Araby Circle. Award of this contract will allow staff to proceed with the drainage improvements proposed on Patencio Lane. RECOMMENDATION: 1) Adopt Minute Order No. "APPROVING AGREEMENT NO. IN THE AMOUNT OF $50,990.00 WITH B & T WORKS, INC., FOR THE PATEN= LANE DRAINAGE IMPROVEMENTS, CITY PROJECT NO. 06-17 (PHASE 1)," and 2) Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: The Public Works and Engineering Department previously budgeted funds for localized drainage improvements at two locations: Patencio Lane and Araby Circle. Staff has proceeded with the Patencio Lane project, which will cure a localized flooding problem on that street. Currently, Patencio Lane drains to its east end, where a private residence has constructed a trench drain and sump pump to intercept street runoff and drain it off-site (onto adjacent private property). In larger storms, the private residence has had flooding problems. The proposed improvements include reconstruction of Patencio Lane with an inverted cross-section, and construction of new catch basin and storm drain pipe to outlet the street runoff through the adjacent property downstream to South Monte Vista Drive, ITEM NO. City Council Staff Report June 6, 2007 - Page 2 Patencio Lane Drainage Improvements (CP 06-17 Phase 1) The plans and specifications were prepared by Department staff, and on April 24 and May 1, the project was advertised for bids, and at 2:00 P.M. on May 22, 2007, the Procurement and Contracting Division received construction bids from the following contractors: 1. Vasily Company, Inc.; Shadow Hills, CA 2. Tri Star Contracting, Inc.; Desert Hot Springs, CA 3. O'Dufty Construction; Romoland, CA 4. Sim Engineering, Inc.; Fallbrook, CA 5. B & T Works, Inc.; Wildomar, CA Refer to Attachment 1 for the Bid Summary. The Engineer's Estimate was $35,580. The low bid was submitted by B & T Works, Inc. The company is a California corporation, and its principal officer is Giovanni Nanci, P res i d e nt/Secreta ry/Tre a s u re r. FISCAL_ IMPACT: Funding for this project is available in Gas Tax account 133-4298-50250 (Drainage Araby/Patencio). David J. Barakian Thomas J. Wilsoh Director of Public Works/City Engineer Assistant City Manager David H. Ready, City M ATTACHMENTS. 1. Bid Summary 2. Minute Order PATE NCI 0 LANE DRAINAGE IMPROVEMENTS CITY PROJECT 06-17(PHASE t) 810 SUMMARY Bid Schedule Engineer's Estimate VASILY COMPANY, INC. TRiSTAR CONTRACTING la ITE DESCRIPTION UANTI UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL i Mobilization i LS $1,500.00 $1,500.06 $1,50040 $i,500.00 $1,500.00 $1,500.00 2 Traffic Control 1 LS $1,500.00 $1,500.60 $i,590.00 $1:500.-00 $2,500.00 $2,500.50 3 Sheeting, Shoring & Bracing, or Equivalent Method 1 LS $2,000.00 $2,0013.00 $2.500.00 $2,500 00 $4,500.00 $4.500 00 4 Remove Existing AC. Pavement I 2,6D0 SF $0.50 $1,30000 $400 $10.40000 $5.00 $13,000.00 5 Construct 2`/"A.C. Pavement 2,200 SF $2 80 $6,160 00 $2.50 $5,500.00 $7.00 $15,400.00 6 Construct 3"A.C. Pavement 200 SF $3.40 $680 00 $7.00 $1.400.00 $10.00 $2,000.00 7 Construct 4"Crushed 2,200 SF $2,640 Da $1.59 $3,300 00 $3.50 $7,700 04 Miscellaneous Base $1 20 8 Contract Type Al 6 Curb(Variable Height) 80 LF $20.06 81,600.OD $31250 $25,000.00 $20.00 $1,60000 9 Construct Type B2 Cross Gutter 80 LF $30.00 $2,400 00 $35 00 $2,800.00 $15.00 $1.200.00 10 Construct Storm Drain Catch Basin i EA $3,750 00 $3,750.00 $3,000 00 $3,000.00 $B,500.00 $6,500.D0 Detai]9, Sheet'Al 11 Construct Storm Drain Parkway 1 EA $2.600.00 $2,600.66 $3,000.00 $3,000.00 $6,000.00 $6,000 00 Manhole Detail 12, Sheet 3 12 Construct Storm Drain Outlet 1 EA $3,850.00 $3,85000 $4,000.00 $4,00000 $5,00000 $5.000.00 Structure Detail 13, Sheet 2 13 Install 12"Storm Drain 130 LF $40.00 $5,2W 00 $130.00 $i6,900.40 $120.00 $15,600.00 14 Install8"Storm Drain 10 LF $40.00 $400.00 $150.00 $1,50o 00 $100.00 $1,OOD.00 $35,580.00 $82,300.00 $33,500.00 Bid Schedule O'DUFFY COtUC11,) SIM ENGINEERING B&T WORKS, INC. ID ITE DESCRIPTION UANTiT UNIT UNIT PRICEUNIT PRICE TOTAL UNIT PRICE TOTAL 1 Mobilization 1 LS $1,500.00 $1,500.00 $1,50004 $1,50000 $1,500.00 2 Traffic Control i LS $2.000.00 $3000 00 $3,00000 $4.00000 $4,000.00 3Sheeting, Shoring& Bracing, or i LS $2,000.000 $300000 $3,00000 $4,000.00 $4,00000 E uivalenf Method4 Remove Existin A C. Pavement 2.600 SF $4620 SS Op $13,000.00 $1.00 $2.600.00 5 Conslruct2'/d'AC Pavement 2200 SF 8909p $4.55 $10,Oi000 $3.25 $7.150.00 6 Construct 3"A C Pavement 200 SF $15.38 $3,076.00 $4.55 $910.00 $4.00 $aaD.Do 7 ConstructMiscellaneous Based 2,200 SF $3.95 $8.690 00 $3.00 $6,600 00 $1.25 $2.750.00 Miscellaneous Base 8 ContruHeightcfTypeAl-6Curb[Variable 80 HEA $62.50 $5,00000 $62.50 $5,00000 $20.00 $1,690.OD Height) 9 Construct Type B2 Crass Gutter 80 $50.00 $4,000.00 $37.59 S3 000.00 $28.00 $2,240.00 10 Construct Storm Drain Catch Basin 1 $4,000.DD $4,000 00 $10,000 00 $10,000.00 $3,500 00 $3,500.00 Detail 9, Sheel3) 11 Construct Storm Drain Par eet""'ay 1 EA $4,00o-.00 $4,000.00 $4.000.00 $4,000.00 $3,500.00 $3,500 00 Manhole Detail 12, Sheet 3 t Construct Storm Drain Cutlet 12 i EA $4,500.00 $4,50000 $4,D00.00 $4.000 00 $3,500.00 $3,50D.00 Structure Detail13, Sheet2 J 13 Install 12" Drain 130 LF $15000 $113,500.00 $7700 $10,010.00 $99.00 $12,87000 14 Install B"Storm Dram 10 LF 1 $122.50 $1,225.00 $ MO 00 $3,000.00 $98.00 $980.00 $91,501.00 $77,030.00 $60,990.00 MINUTE ORDER NO. APPROVING AGREEMENT NO. IN THE AMOUNT OF $50,990.00 WITH B & T WORKS, INC., FOR THE PATENCIO LANE DRAINAGE IMPROVEMENTS, CITY PROJECT NO. 06-17 (PHASE 1) I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that this Minute Order approving Agreement No. in the amount of $50,990.00 with B & T Works, Inc., for the Patencio Lane Drainage Improvements, City Project 06-17 (Phase 1), was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 6th day of June, 2007. James Thompson, City Clerk