HomeMy WebLinkAbout6/6/2007 - STAFF REPORTS - 2.L. ?ALM Sp
U m
4
�``FOTL City Council Staff Report
JUNE 6, 2007 CONSENT CALENDAR
Subject: AWARD OF CONTRACT FOR THE PATENCIO LANE DRAINAGE
IMPROVEMENTS, CITY PROJECT NO. 06-17 (PHASE 1)
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
This year, there are two locations where localized drainage improvements are proposed
to cure drainage and flooding problems; one is located on Patencio Lane, and the other
is located on Araby Circle. Award of this contract will allow staff to proceed with the
drainage improvements proposed on Patencio Lane.
RECOMMENDATION:
1) Adopt Minute Order No. "APPROVING AGREEMENT NO. IN THE
AMOUNT OF $50,990.00 WITH B & T WORKS, INC., FOR THE PATEN=
LANE DRAINAGE IMPROVEMENTS, CITY PROJECT NO. 06-17 (PHASE 1),"
and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
The Public Works and Engineering Department previously budgeted funds for localized
drainage improvements at two locations: Patencio Lane and Araby Circle. Staff has
proceeded with the Patencio Lane project, which will cure a localized flooding problem
on that street. Currently, Patencio Lane drains to its east end, where a private
residence has constructed a trench drain and sump pump to intercept street runoff and
drain it off-site (onto adjacent private property). In larger storms, the private residence
has had flooding problems.
The proposed improvements include reconstruction of Patencio Lane with an inverted
cross-section, and construction of new catch basin and storm drain pipe to outlet the
street runoff through the adjacent property downstream to South Monte Vista Drive,
ITEM NO.
City Council Staff Report
June 6, 2007 - Page 2
Patencio Lane Drainage Improvements (CP 06-17 Phase 1)
The plans and specifications were prepared by Department staff, and on April 24 and
May 1, the project was advertised for bids, and at 2:00 P.M. on May 22, 2007, the
Procurement and Contracting Division received construction bids from the following
contractors:
1. Vasily Company, Inc.; Shadow Hills, CA
2. Tri Star Contracting, Inc.; Desert Hot Springs, CA
3. O'Dufty Construction; Romoland, CA
4. Sim Engineering, Inc.; Fallbrook, CA
5. B & T Works, Inc.; Wildomar, CA
Refer to Attachment 1 for the Bid Summary.
The Engineer's Estimate was $35,580. The low bid was submitted by B & T Works, Inc.
The company is a California corporation, and its principal officer is Giovanni Nanci,
P res i d e nt/Secreta ry/Tre a s u re r.
FISCAL_ IMPACT:
Funding for this project is available in Gas Tax account 133-4298-50250 (Drainage
Araby/Patencio).
David J. Barakian Thomas J. Wilsoh
Director of Public Works/City Engineer Assistant City Manager
David H. Ready, City M
ATTACHMENTS.
1. Bid Summary
2. Minute Order
PATE NCI 0 LANE DRAINAGE IMPROVEMENTS
CITY PROJECT 06-17(PHASE t)
810 SUMMARY
Bid Schedule Engineer's Estimate VASILY COMPANY, INC. TRiSTAR CONTRACTING
la ITE DESCRIPTION UANTI UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TOTAL
i Mobilization i LS $1,500.00 $1,500.06 $1,50040 $i,500.00 $1,500.00 $1,500.00
2 Traffic Control 1 LS $1,500.00 $1,500.60 $i,590.00 $1:500.-00 $2,500.00 $2,500.50
3 Sheeting, Shoring & Bracing, or Equivalent Method 1 LS $2,000.00 $2,0013.00 $2.500.00 $2,500 00 $4,500.00 $4.500 00
4 Remove Existing AC. Pavement I 2,6D0 SF $0.50 $1,30000 $400 $10.40000 $5.00 $13,000.00
5 Construct 2`/"A.C. Pavement 2,200 SF $2 80 $6,160 00 $2.50 $5,500.00 $7.00 $15,400.00
6 Construct 3"A.C. Pavement 200 SF $3.40 $680 00 $7.00 $1.400.00 $10.00 $2,000.00
7 Construct 4"Crushed 2,200 SF $2,640 Da $1.59 $3,300 00 $3.50 $7,700 04
Miscellaneous Base $1 20
8 Contract Type Al 6 Curb(Variable
Height) 80 LF $20.06 81,600.OD $31250 $25,000.00 $20.00 $1,60000
9 Construct Type B2 Cross Gutter 80 LF $30.00 $2,400 00 $35 00 $2,800.00 $15.00 $1.200.00
10 Construct Storm Drain Catch Basin i EA $3,750 00 $3,750.00 $3,000 00 $3,000.00 $B,500.00 $6,500.D0
Detai]9, Sheet'Al
11 Construct Storm Drain Parkway 1 EA $2.600.00 $2,600.66 $3,000.00 $3,000.00 $6,000.00 $6,000 00
Manhole Detail 12, Sheet 3
12 Construct Storm Drain Outlet 1 EA $3,850.00 $3,85000 $4,000.00 $4,00000 $5,00000 $5.000.00
Structure Detail 13, Sheet 2
13 Install 12"Storm Drain 130 LF $40.00 $5,2W 00 $130.00 $i6,900.40 $120.00 $15,600.00
14 Install8"Storm Drain 10 LF $40.00 $400.00 $150.00 $1,50o 00 $100.00 $1,OOD.00
$35,580.00 $82,300.00 $33,500.00
Bid Schedule O'DUFFY COtUC11,) SIM ENGINEERING B&T WORKS, INC.
ID ITE DESCRIPTION UANTiT UNIT UNIT PRICEUNIT PRICE TOTAL UNIT PRICE TOTAL
1 Mobilization 1 LS $1,500.00 $1,500.00 $1,50004 $1,50000 $1,500.00
2 Traffic Control i LS $2.000.00 $3000 00 $3,00000 $4.00000 $4,000.00
3Sheeting, Shoring& Bracing, or i LS $2,000.000 $300000 $3,00000 $4,000.00 $4,00000
E uivalenf Method4 Remove Existin A C. Pavement 2.600 SF $4620 SS Op $13,000.00 $1.00 $2.600.00
5 Conslruct2'/d'AC Pavement 2200 SF 8909p $4.55 $10,Oi000 $3.25 $7.150.00
6 Construct 3"A C Pavement 200 SF $15.38 $3,076.00 $4.55 $910.00 $4.00 $aaD.Do
7 ConstructMiscellaneous
Based 2,200 SF $3.95 $8.690 00 $3.00 $6,600 00 $1.25 $2.750.00
Miscellaneous Base
8 ContruHeightcfTypeAl-6Curb[Variable 80 HEA
$62.50 $5,00000 $62.50 $5,00000 $20.00 $1,690.OD Height)
9 Construct Type B2 Crass Gutter 80 $50.00 $4,000.00 $37.59 S3 000.00 $28.00 $2,240.00
10 Construct Storm Drain Catch Basin 1 $4,000.DD $4,000 00 $10,000 00 $10,000.00 $3,500 00 $3,500.00
Detail 9, Sheel3)
11 Construct Storm Drain Par
eet""'ay 1 EA $4,00o-.00 $4,000.00 $4.000.00 $4,000.00 $3,500.00 $3,500 00
Manhole Detail 12, Sheet 3
t Construct Storm Drain Cutlet
12 i EA $4,500.00 $4,50000 $4,D00.00 $4.000 00 $3,500.00 $3,50D.00
Structure Detail13, Sheet2
J
13 Install
12" Drain 130 LF $15000 $113,500.00 $7700 $10,010.00 $99.00 $12,87000
14 Install B"Storm Dram 10 LF 1 $122.50 $1,225.00 $ MO 00 $3,000.00 $98.00 $980.00
$91,501.00 $77,030.00 $60,990.00
MINUTE ORDER NO.
APPROVING AGREEMENT NO. IN THE
AMOUNT OF $50,990.00 WITH B & T WORKS, INC.,
FOR THE PATENCIO LANE DRAINAGE
IMPROVEMENTS, CITY PROJECT NO. 06-17
(PHASE 1)
I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that
this Minute Order approving Agreement No. in the amount of $50,990.00
with B & T Works, Inc., for the Patencio Lane Drainage Improvements, City
Project 06-17 (Phase 1), was adopted by the City Council of the City of Palm
Springs, California, in a meeting thereof held on the 6th day of June, 2007.
James Thompson, City Clerk