HomeMy WebLinkAbout5/16/2007 - STAFF REPORTS - 2.I. p A`M Spy •2 c+ U N x e O °neexa.n'. -0'CIFOR %9 CITY COUNCIL STAFF REPORT DATE: May 16, 2007 Consent Agenda SUBJECT: ENGINEERING DESIGN SERVICES FOR EXPANSION OF THE RENTAL CAR READY/RETURN LOT AT THE AIRPORT, AMENDMENT NO. 11 TO AGREEMENT NO. 4487 WITH VSA AIRPORTS, INC. FROM: David H. Ready, City Manager BY: Department of Aviation SUMMARY This action would approve an amendment to the existing engineering services agreement with VSA Airports to design the expansion of the rental car ready/return lot. RECOMMENDATION: 1) Adopt Minute Order No, Approving Amendment No. 11 to Agreement No. 4487 with VSA Airports, Inc. for Engineering Design Services for expansion of the rental car ready/return lot at the Airport, in the amount of $190,000.; and 2) Authorize the City Manager to execute the amendment to the agreement. A4487. STAFF ANALYSIS: Recently the City Council approved a per rental fee (CFC) to be charged to the rental car companies at the airport. This fee is restricted to development of facilities that benefit the rental car companies. As part of the consultation effort that went into the development of this new fee the Airport agreed to immediately begin the process to develop an expansion to the ready return facility north of the baggage claim area. The commitment was to try and have the facility in operation as soon after Signature gives back the ramp in front of their existing terminal building; contractually set to happen on January 1, 2008. To meet such a timing commitment it is important to immediately begin the design process. The ready/return facility design is heavily impacted by restrictions placed on the parking of vehicles in close proximity to a building following the events of 911. VSA Airports was the firm that worked closely with the airport to design the current lot configuration and thus staff sought a quote from them for this work. VSA still has an open contract Item 2 . 1 . i City Council Staff Report May 16, 2007- Page 2 Rental Car Ready/Return Lot Engineering Design with the airport for engineering services. Staff has negotiated a price of $190,000 for the design work which includes the landscaping plans and the necessary reviews by the Planning Commission and other review bodies, as well as the necessary field engineering during construction. The estimated construction cost for the project will be between $1 million and $1.1 million. This item was reviewed by the Airport Commission at their May 9, 2007 meeting and is recommended by the Commission for adoption by City Council, FISCAL IMPACT: IFinance Director Review: The contract amount of $190,000 engineering fees will be paid from the new CFC fee. The fee was first collected in March of 2007 and has already generated over $250,000 in collections in the first month. If this item is approved an Offsetting Budget Amendment will be processed through Finance to set up the design dollars for the project. Allen F. Smoot, onstruction Project Administrator David H. Ready, City Mars r Attachments: Minute Order Amendment No. 11 to VSA Agreement MINUTE ORDER NO_ APPROVING AMENDMENT NO. 11 TO AGREEMENT NO. 4487 WITH VSA AIRPORTS, INC. FOR ENGINEERING DESIGN SERVICES FOR EXPANSION OF THE RENTAL CAR READY/RETURN LOT AT THE AIRPORT IN THE AMOUNT OF $190,000. I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that this Minute Order approving Amendment No. I I to Agreement No. 4487 with VSA Airports, Inc., for engineering design services for expansion of the rental car ready/return lot at the airport in the amount of$190,000, was adopted by the City Council of the City of Palm Springs, California in a meeting thereof held on the 16th day of May 2007. James Thompson, City Clerk AMENDMENT#11 AGREEMENT NO. 4487, AIRPORT ENGINEERING SERVICES THIS ELEVENTH AMENDMENT TO AGREEMENT NO. 4487 FOR CONTRACT SERVICES, (herein "Amendment") is made and entered into on the_day of 2007, by and between the CITY OF PALM SPRINGS (herein "City") and VSA AIRPORTS, Inc. (herein "Contractor"). (The term Contractor includes professionals performing in a consulting capacity.), is hereby effective 2007 as follows: RECITALS A. The City and Contractor entered into that certain Contract Services Agreement No. 4487 for Airport Engineering Services ("Agreement"), as duly amended from time to time- s. The parties wish to amend the Agreement pursuant to the terms of this Amendment to add additional services to be performed by Contractor and increase the Contract Sum to authorize payment for such additional services. NOW, THEREFORE, the parties hereto agree as follows: Section 1: Section 2.1 of the Agreement entitled "Contract Sum" shall be amended as to the reference to the Contract Sum to include the fees added with this Amendment, as described in the revision to Exhibit "C" below (for $190,000.00), so that the revised Contract Sum shall read "Three Million Seven Hundred Sixty Nine Thousand and 00/100 Dollars ($3,769,000.00)", with all other provisions of Section 2.1 remaining unmodified and in full force and effect. Section 3: Exhibit "A" Scope of Services, Part V — Project Specific Scopes, is hereby amended by adding Project No.2d with all other provisions of Exhibit "A" remaining unmodified and in full force and effect: Project# Project Title/Description Task Assignments* 2. Airport Roadway Systems (300' Mitigation Rule) d. Rental Car(Ready/Return) Temporary Parking Lot Expansion A, C, D, F, G, 1, K 'tasks as defined in the original contract Section 4: Exhibit "C" Schedule of Compensation, Part 11 — Project Specific Compensations is hereby amended by adding Project No. 2b, with all other provisions of Exhibit "C" remaining unmodified and in full force and effect Project# Project Title/Description Compensation (Not To Exceed) 2. Airport Roadway Systems (300' Mitigation Rule) d. Rental Car(Ready/Return) Temporary Parking Lot Expansion $190,000,00 Section 5: Exhibit "D" Schedule of Performance is hereby amended by adding the dates for Project No.2d, with all other provisions of Exhibit "D" remaining unmodified and in full force and effect: VSA AIRPORTS,Inc.,Agreement 4487,Amendment S11 1 Project# Project Title/Description Commence Complete 2. Airport Roadway Systems (300' Mitigation Rule) d. Rental Car(Ready/Return) Temporary Parking Lot June 1, 2007 May 1, 2008 Expansion Section 6: Full Force and Effect. Except as expressly modified herein all other provisions of the Agreement shall remain unmodified and in full force and effect. Section 7: Corporate Authority. The persons executing this Amendment on behalf Of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment on behalf of said part, (iii) by so executing this Amendment, such party is formally bound to the provisions of this Amendment, and (iv) the entering into this Amendment does not violate any provision of any other agreement to which said party is bound. (Signature Page Follows) L7' VSA AIRPORTS,Inc.,Agreement 4487,Amendment 911 ���1� 2 IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above. ATTEST: CITY OF PALM SPRING a municipal corporation By: By City Clerk City Manager APPROVED AS TO FORM: By: City Attorney CONTRACTOR: Check one: —Individual _Partnership __Corporation Corporations require two notarized signatures: One from each of the following: A. Chairman of Board, President, or any Vice President: AND B. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer, or Chief Financial Officer. By: By: Signature(notarized) Signature(notarized) Name: Name: Title: Title: State of State of County of County of On before me, On before me, personally appeared personally appeared personally known to me(or proved to me on personally known to me (or proved to me on the basis of satisfactory evidence) to be the the basis of satisfactory evidence)to be the person(s)whose name(s) is/are subscribed person(s)whose name(s) is/are subscribed to the within instrument and acknowledged to the within instrument and acknowledged to me that he/she/they executed the same to me that he/she/they executed the same in his/her/their authorized capadty(ies), and in his/her/their authorized capacity(ies), and that by his/her/their signatures(s) on the that by his/her/their signatures(s) on the instrument the person(s), or entity upon instrument the person(s), or entity upon behalf of which the person(s) acted, behalf of which the person(s)acted, executed the instrument. executed the instrument. WITNESS my hand and official seal. WITNESS my hand and official seal. Notary Signature: Notary Signature: Notary Seal: Notary Seal: VSA AIRPORTS,Inc.,Agreement 4487,Amendment#11 3 Airport Engineering Services Exhibit"A'- Scope of Services VSA AIRPORTS TASK Trr FJDsSCRIpTION RSSIGNMENf' y Preliminary Design - As required by the speclfic project, provide preliminary design sketch(es)of initial project concepts to define parameters,concepts and/or scope of work, in accordance with the Airport Layout Plan(ALP)and other applicable regulations/drawings. Quantity and content of the sketches to be determined bythe Engineer. F3 Design Charette-The Engineer and all necessary sub-consultants for the specific project shall meet at the Palm Sprlrgs international Airport fora one(1)day'brain storming'session. The outcome of these session(s)will be to explore and define all possible issues related to the specific project. DELIVERABLES; A summary reportlminutes of the session(s) and charette findings,consisting of ten (10) color copies in 11"x 17"format. Booklet to include concept sketches and outline of key design issues&findings of the charette.. C Topographic Surveying- Perform topographic surveys of proposed construction areas, as required,for design. D Soils Testing/Pavement Design - Perform necessary geotechnical services of proposed construction areas, as required, For design. E Schematic design-The lead designer, as assigned by the Engineer and agreed to by the City,shall review the Design Charette findings for the specific project,and develop three(3) alternatves and associated sketches for the specked project; develop project specific phasing plans;coordinatetheestablishmentofbid proposals into schedules to allow flexibility of award to match the funds available.DELIVERABLES:A booklet/report documenting the three(3)alternatives and corresponding Engineers Report.Said documentation shall consist of five(5)color copies in 11"x 17"format documenting in sketch form the project as defined in the design charette summary report.This booklet will be based on a maximum of three (3) alternates and would Include, as required, a plot plan, elevation and floor plan, a preliminary construction schedule and order of magnitude cost, by construction discipllne. F Design Review Package(for submittal to Planning DepartmentlCity Council, etc.)-These items shall be used to obtain approval by, but not limited to, the Airport Commission, Planning Commission and City Council for the City of Palm Springs. Coordinate the establishment of bid proposals into schedules to allow flexibility of award to match the funds available. Prepare the final plans and specifications for submission and review by the City and the FAA. DELIVERABLES: Based on one (1) selected Schematic Design Task, the Engineer will furnish to the City color presentation boards, including color elevations, site plans, profile drawings/presentation boards,floor plans,etc.for the specified project.A City of Palm Springs major architectural review application is shown in Attachment 1. The Engineer shall ensure the distribution of applicable drawings and in formation to complete the City submittal.If requested by the City,3D color renderings are available for an additional fee of$4,000 each. VSA Airports Engineering Agreement Page 13 of 26 :r u Airport Engineering Services Erhibit'A"-Scope of Services VSA AIRPORTS TASK 717LEVE'scPJP77oN ASSfGMMEN7 G Civil Design/Eld Package (engineering drawings, general conditions, special provisions, ® technical spaciFicatlons, etc.) - Develop and submit for City review and approval, the necessary civil design and/or bid package documents. Provide complete sets of approved plans,specifications and contract documents for the bidding of the project;arrange for and conduct Pre-bid conferences and projectfamiliarizaflon tours;assistwith the bid opening and processing of bid documents and make recommendations to the City for award of contract schedules; redesign the project or adjust the scope via the use of bid schedules at no additional cost if project bids are higher than the approved budget- All bid packages shall include any and all applicable Department of Transportation (DOT)/Federal Aviation Administration(FAA)contract assurances.DELIVI=RABLES= Preparation and assembly In City and/or FAA bid document format.To the extent practicable,all bid documents shall be prepared for publication and advertising via the Int,emet- FI Environmental Assessment - Limited to preparing the City's Environmental Assessment/application forms for submission to the City of Palm Springs, Department of Planning& Building. If required,more in-depth environmental review for the specific project may be required with other specialized sub-consultants, and Is outside the scope of this agreement. I ArchitecturalDesign,including landscaping/Bid Package-(plains and specifications,general conditions, special provisions, technical specifications,etc.)- Develop and submit for City review and approval, the necessary architectural design and/or bid package documents; provide complete sets of approved plans, specifications and contract documents for the bidding of the project;redesign the project or adjust the scope via the use of bid schedules at no additional cast if project bids are higher than the approved budget. All bid packages shall include any and all applicable Department of Transportation (DOT)/Federal Aviation Administration (FAA)contract assurances.DELIVERABLES; Preparation and assembly in City andlor FAA bid document format-To the extent practicable,all bid documents shall be prepared for publication and advertising via the Internet- Architectural, including landscaping construction administration - The Architectural sub- consultant, in conjunction with the Engineer, shall prepare all addition and deletion architectural related change orders and supplemental agreements for approval by the City as required.After acceptance of the Construction Contract by the Contractor,copies will be submitted to the City and the FAA for approval and signature before proceeding with the work. As required on a project by project basis,the Architectural sub-consultant,In conjunction wlttl the Engineer,shall review the submitted weekly contractors payroll,review and as required, approve,shop drawings and construction submittals, and prepare and maintain necessary records of construction progress. Upon acceptance of the project, the Architectural sub-consultant, in conjunction with the Engineer, shall prepare the "Record Drawings", including any field surveying required to compute final quantities,and[he Construction Engineering Report,and shall provide the City and the FAA with one (1) set of reproducible"Record Drawings"and one (1) copy of the Constructlen Engineering Report. On completion of the project, the Architectural sub-consultant, in conjunction with the Engineer,shall prepare and supply the City with any maintenance manuals and/or programs for the improvements constructed under the project. VSA Airports Engineering Agreement Page 14 of 26 Airport Engineering Services Exhibit A'-Scope of Services VSA AIRPORTS TASK 77TLEIDESCR7P770N AssrsNmrENT K Fielp'Engineering-Arrange for and conduct Pre-Constructionconferences.Provide complete O resident engineering coordination of the constructonworkwith sufficient qualifiedinspectors who shall be present during all construction operations to observe that construction is accomplished in accordance with the plans and specifications.It is expressly understood that the terra "engineering coordination' does not mean that the Engineer will assume any responsibility that usurps or replaces the duties and authority of a construction Superintendent or other Contractor agent charged with responsibility for the construction operation. In carrying out his responsibillties for engineering coordination,the Engineer shall guard the City against defects and deficiencies in the permanent work constructed by the Contractor, but does not guarantee the performance of the Contractor. The above disclaimers do not in any way abrogate the responsibility of the Engineer as agent for the City to exercise technical competence, expertise, skill and engineering judgment so that the Contractor's construction products are provided in accordance with the construction contract documents. The Engineer shall issue such instructions to the Contractor's Construction Superintendent as are necessary to protect the City's interests to the same extent as would the City, itself. The Engineer shall provide sufficient surveys and observe and check surveys conducted by the Contractor in accordance with the plans and specifications- The Engineer shall act as the City's agent during construction to protect the City's interest and shall have the authority to recommend to the Citythat the construction be stopped if not in accordance with the plans and specifications. The Engineer will furnish a weekly construction progress and inspection report to the City and the FAA. The Engineer shall prepare all addition and deletion change orders and supplemental agreements for approval by the City as required_ After acceptance of the Construction Contract by the Contractor,copies will be submitted to the City and the FAA for approval and signature before proceeding with the work. The Engineer shall review the submitted weekly contractor's payroll, check shop drawings and construction submittals, and prepare and maintain necessary records of construction progress. When the project has been completed and is ready forf[nal acceptance,the Engineer shall arrange for inspection of the finished work by the FAA, the City, the Contractor and the Engineer,following which the final estimate for the work will be considered by the City. Upon acceptance of the project,the Engineer shall preparethe"Record Drawings",including any field surveying required to computer final quantifies,and the Construction Engineering Report, and shall provide the City and the FAA with one (1) set of reproducible "Record Drawings"and one(1) copy of the Construction Engineering Report. On completion of the project, the Engineer shall prepare and supply the City with any maintenance manuals and/or programs for the improvements constructed under the project. Perform the duties of the Engineer/Architect as set forth in the General Conditions of the Construction contract. VSAAirports Engineering Agreement Page-15of 26 �1�1r1�