HomeMy WebLinkAbout4/18/2007 - STAFF REPORTS - 2.D. a�,�F p`M SA4
.y
u m
City Council Staff Repo
APRIL 18, 2007 CONSENT CALENDAR
Subject: APPROVAL OF PROGRAM SUPPLEMENT AGREEMENT NO. 021-N,
WITH THE STATE OF CALIFORNIA FOR USE OF HIGHWAY BRIDGE
PROGRAM (HBP) FEDERAL-AID FUNDS FOR THE BOGERT TRAIL
BRIDGE REHABILITATION, CITY PROJECT NO. 07-03, FEDERAL-AID
PROJECT NO. BHLO-5282(026)
From: David H. Ready, City Manager
Initiated by. Public Works and Engineering Department
SUMMARY
Approval of Program Supplement Agreement No. 021-N will formally authorize the
disbursement and use of up to $655,786 in federal-aid funds for the Bogert Trail Bridge
Rehabilitation, City Project No. 07-03, Federal Aid Project No. BHLO-5282(026),
RECOMMENDATION:
1) Adopt Resolution No. "A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF PALM SPRINGS, CALIFORNIA APPROVING PROGRAM
SUPPLEMENT AGREEMENT N0. 021-N TO ADMINISTERING AGENCY-
STATE AGREEMENT FOR FEDERAL-AID PROJECTS NO. 08-5282R WITH
THE STATE OF CALIFORNIA, IN THE AMOUNT OF $740,750 ($655,786 HBP
FEDERAL FUNDS / $84,964 MEASURE A FUNDS), FOR THE BOGERT TRAIL
BRIDGE REHABILITATION, CITY PROJECT NO. 07-03, FEDERAL-AID
PROJECT NO. BHLO-5282(026), AND AUTHORIZING THE CITY MANAGER
TO EXECUTE THE AGREEMENT ON BEHALF OF THE CITY OF PALM
SPRINGS;" and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
In 2005, the Public Works and Engineering Department applied for funding through the
Highway Bridge Program (HBP) for widening and rehabilitation of the existing Bogert
Trail bridge over the Palm Canyon Wash. The existing bridge has been identified by
Caltrans as functionally obsolete, and its widening and repairs are eligible for funding
ITEM NO.—7� _
City Council Staff Report
April 18, 2007 - Page 2
Program Supplement Agreement No 021-N
through the HBP. This project will retrofit and repair the existing bridge, and widen the
bridge deck width to match the existing roadway width of 40 feet either side of the
bridge, including new sidewalks. The City's grant application applied for $4,328,187 in
HBR federal-aid funds, or 88.53% of the estimated total project cost of$4,888,950. The
initial, or Preliminary Engineering (PE) Phase, was estimated to cost $740,750 of which
88.53% or $655,786 is federally funded.
The City operates under a "Master Agreement" with the state of California, identified as
the "Administering Agency -- State Agreement No. 08-5282R" for use of federal funds
on City projects. The Master Agreement is amended by each successive use of federal
funds on a project, and upon the first "authorization" or obligation of the use of federal
funds on a project, the City is provided with a "Program Supplement Agreement", or
amendment, to the Master Agreement.
In light of the City's authorization to proceed with the preliminary engineering phase for
this project, using HBP federal funds, Caltrans has submitted to the City for approval
Program Supplement Agreement No. 021-N, which will facilitate the City's use of federal
funds for this project. Local Match portion budgeted in Measure A Funds, account
number 134-4498-50244.
FISCAL IMPACT: IFinance Director Review:
Approval of Program Supplement Agreement No. 021-N with Caltrans will formally
authorize the disbursement and use of up to $655,786 in federal-aid funds for the
Bogert Trail Bridge Rehabilitation, City Project No. 07-03, Federal Aid Project No.
BHLO-5282(026).
Submitted:
David J. Barakian Thomas J. Wils
Director of Public Works/City Engineer Assistant City onager
Approved:
David H. Ready
City Manager
ATTACHMENTS:
1. Program Supplement Agreement No. 021-N
2. Resolution
PROGRAM SUPPLEMENT No- N021 Data:March 14,2007
to Location:08-RIV-0-PSP
ADMINISTERING AGENCY-STATE AGREEMENT Project Number:61rL0-52S2(026)
FOR FEDERAL-AID PROJECTS NO. 08-5282R E.A. Number.08.924970
This Program Supplement hereby incorporates the Administering Agency-State Agreement for Federal Aid which was entered into
between the Administering Agency and the State on 02/07/07 and is subject to all the terms and conditions thereof.This Program
Supplement is executed in accordance with Article I of the aforementioned Master Agreement under authority of Resolution No
,approved by the Administering Agency on (See copy attached).
The Administering Agency further stipulates that as a condition to the payment by State of any funds derived from sources noted
below obligated to this project,the Administering Agency accepts and will comply with the Special covenants or Remarks setforth
on the following pages.
PROJECT LOCATION:
East Bogert Trail over Palm Canyon Wash east of Andreas Palms Drive
TYPE OF WORK_Bridge rehabilitation DENGTR: 0,1 (MILES)
Estimated Cost Federal Funds Matching Funds
I,110 $655,786.00 LOCAL OTHER
$740,750.00 $84,964-00 $0.00 $0.00
CITY OF PALM SPRINGS STATE OF CALIFORNIA
Department of Transportation
By By
Date Chief, Office of Project Implementation
Division of Local Assistance
Attest
Date
Title
I hereby certify upon my pergoaal knowledge that budgoted funds are availab7-e got thin ancumbranco:
Accounting officer,� �-,A. ,�— Date1A /q, $655,786,00
chapter statutes p Stem Heat Program BC Category Fund Source AMOIINP
47 2006 2660-102-890 2006-2007 20.30,010-300 C 224060 892-F 655,786.00
Program Supplement 08-5282R-N021- ISTEA page l of 3
08-RIV-0-PSP 0 1/1 412007
r
BHLO-5282(026)
SPECIAL COVENANTS OR REMARKS
1. The ADMINISTERING AGENCY will advertise, award and administer
this project in accordance with the current published Local
Assistance Procedures Manual_
2. Award information shall be submitted by the ADMINISTERING AGENCY
to the District Local Assistance Engineer within 60 days after
the project contract award. A copy of the award package shall
also be included with the submittal of the ADMINISTERING AGENCY's
first invoice for the construction contract to:
Department of Transportation
Division of Accounting
Local Programs Accounting Branch, MS #33
P. O_ Box 942874
Sacramento, CA 94274-0001_
Failure to do so will cause a delay in the State processing
invoices for the construction phase. Please refer to Section
15.7 "Award Package" of the Local Assistance Procedures Manual.
3. ADMINISTERING AGENCY agrees that it will only proceed with work
authorized for specific phase(s) with an "Authorization to
Proceed" and will not proceed with future phase(s) of this
project prior to receiving an "Authorization to Proceed" from the
STATE for that phase(s) unless no further State or Federal funds
are needed for those future phase(s) _
4. Any State and Federal funds that may have been encumbered for
this project are only available for disbursement for a period of
five (5) years and seven (7) years, respectively, from the start
of the fiscal year(s) that those funds were appropriated within
the State Budget Act. All project funds not liquidated within
these periods will revert unless an executed Cooperative Work
Agreement extending these dates is requested and is approved by
the California Department of Finance per Government Code Section
16304 . The exact date of each fund reversion will be reflected
in the approved finance letter(s) issued for this project.
Notwithstanding the unliquidated sums of project specific State
and Federal funding remaining and available to fund project work,
any invoice for reimbursement that is not submitted to the
Department on or before 60 days after that applicable fixed fund
Program Supplmont 08-52821k-N021• ISTEA Page 2 of 3
08-RIV-0-PSI' 03/14/2007
BI7I.0-5282(026)
SPECIAL COVENANTS OR REMARKS
reversion date will not be paid from that fiscal year' s
encumbered funds because all of these unexpended funds will be
irrevocably reverted by the Department 's Division of Accounting
on that date_
Pursuant to a directive from the State Controller' s Office and
the Department of Finance, the last date to submit invoices for
reimbursed work in each fiscal year is May 15th in order for
payment to be made out of those then current appropriations.
Project work performed and invoiced after May 15th will be
reimbursed only out of available funding that might be encumbered
in the subsequent fiscal year, and then only when those funds are
actually allocated and encumbered as authorized by the California
Transportation Commission and the Department's Accounting Office.
5. ADMINISTERING AGENCY agrees, as a minimum, to submit invoices at
least once every six months commencing after the funds are
encumbered for each phase by the execution of this Project
Program, Supplement Agreement, or by STATE' s approval of an
applicable Finance Letter. STATE reserves the right to suspend
future authorizations/obligations, and invoice payments for any
on-going or future federal-aid project by ADMINISTERING AGENCY if
PROJECT costs have not been invoiced by ADMINISTERING AGENCY for
a six-month period.
If no costs have been invoiced for a six--month period,
ADMINISTERING AGENCY agrees to submit for each phase a written
explanation of the absence of PROJECT activity along with target
billing date and target billing amount.
ADMINISTERING AGENCY agrees to submit the final report documents
that collectively constitute a "Report of Expenditures" within
one hundred eighty (180) days of PROJECT completion. Failure of
ADMINISTERING AGENCY to submit a "Final Report of Expenditures"
within 180 days of PROJECT completion will result in STATE
imposing sanctions upon ADMINISTERING AGENCY in accordance with
the current Local Assistance Procedures Manual.
Program Supplement 08-5282R-NO21- ISTEA Page 3 af� 3
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
PALM SPRINGS, CALIFORNIA APPROVING PROGRAM
SUPPLEMENT AGREEMENT N0. 021-N TO
ADMINISTERING AGENCY-STATE AGREEMENT FOR
FEDERAL-AID PROJECTS NO. 08-5282R WITH THE
STATE OF CALIFORNIA, IN THE AMOUNT OF $740,750
($655,786 HBP FEDERAL FUNDS / $84,964 MEASURE A
FUNDS), FOR THE BOGERT TRAIL BRIDGE
REHABILITATION, CITY PROJECT NO. 07-03, FEDERAL-
AID PROJECT NO. BHLO-5282(026), AND AUTHORIZING
THE CITY MANAGER TO EXECUTE THE AGREEMENT
ON BEHALF OF THE CITY OF PALM SPRINGS
WHEREAS, the City of Palm Springs has submitted to the California Department of
Transportation a request for authorization to proceed with the Preliminary Engineering
(PE) Phase for the Bogert Trail Bridge Rehabilitation, requiring obligation of$655,786 of
HBP federal-aid funds; and
WHEREAS, the California Department of Transportation has prepared Program
Supplement Agreement No. 021-N, an amendment to administering Agency-State
Agreement No. 08-5282R with the state of California, obligating $655,786 in federal-aid
funds for the Bogert Trail Bridge Rehabilitation, City Project No. 07-03, Federal Aid
Project No. BHLO-5282(026).
THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY RESOLVE
AS FOLLOWS:
SECTION 1. Program Supplement Agreement No. 021-N, an amendment to
administering Agency-State Agreement No. 08-5282R with the state of California,
obligating $655,786 in federal-aid funds for the Bogert Trail Bridge Rehabilitation, City
Project No, 07-03, Federal Aid Project No. BHLO-5282(026), is approved.
SECTION 2. The City Manager is authorized to execute and administer the Program
Supplement Agreement as may be necessary.
Resolution No,
Page 2
ADOPTED THIS 18th day of April, 2007.
David H. Ready, City Manager
ATTEST:
James Thompson, City Clerk
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF PALM SPRINGS )
I, JAMES THOMPSON, City Clerk of the City of Palm Springs, hereby certify that
Resolution No. _ is a full, true and correct copy, and was duly adopted at a regular
meeting of the City Council of the City of Palm Springs on April 18, 2007, by the
following vote:
AYES:
NOES:
ABSENT:
ABSTAIN:
James Thompson, City Clerk
City of Palm Springs, California