HomeMy WebLinkAbout9/5/2001 - STAFF REPORTS (3) DATE: September 5, 2001
TO: City Council
FROM: Director of Public Works/City Engineer
FEDERAL FISCALYEAR 2001/2002 DISADVANTAGED BUSINESS ENTERPRISE(DBE)
PROGRAM FOR FHWA FUNDED PROJECTS
RECOMMENDATION:
That the City Council approve the City of Palm Springs' Disadvantaged Business
Enterprise Program for FHWA funded projects in Federal Fiscal Year 2001/2002.
SUMMARY:
Federal regulations regarding Disadvantaged Business Enterprises(DBE's)require
that agencies receiving Federal Highway Administration (FHWA) funding update
their DBE Programs on an annual basis, corresponding with each Federal Fiscal
Year.
BACKGROUND:
The California Department of Transportation (Caltrans) has been delegated
oversight responsibility for DBE implementation throughout the state for all public
works projects receiving FHWA funds. For the upcoming Federal Fiscal Year
2001/2002, beginning October 1, 2001, Caltrans required that local agencies
submit for review by June 15, 2001, proposed changes to their DBE Program and
their recalculated DBE Goal.
Staff reviewed upcoming federal projects and the availability of DBE firms within
the southern California area, and determined that no changes have occurred since
adoption of the previous DBE Goal, and recommended continuing with a DBE
Annual Overall Goal of 16%for Federal Fiscal Year 2001/2002. Caltrans reviewed
and concurred with staff's recommendation.
Pursuant to the DBE Federal regulations, a Public Notice was published in the
Desert Sun on June 29, 2001, providing for a 30-day review and concurrent 45-day
public comment period. No public comments were received, and following receipt
of proof of publication, Caltrans officially approved the City's DBE Program for
Federal Fiscal Year 2001/2002. Although Caltrans is the designated agency by
FHWA giving final approval to all local agency annual DBE Programs, Council's
concurring approval of the City's DBE Program at this time registers the City's DBE
Program at the local level. The DBE Program is available for review in the Public
Works and Engineering Department.
�Gh DAVID J. BARAKIAN
Director of Public Works/City Engineer
APPRO—
City Manager
ATTACHMENTS:
1. Minute Order
PALM, _
ti 0Al
� �
City of Palm Springs
Engineering Department
3200 T hgwa Canyon Way • Palm Spnng,,Cdhfamia 9776,
V 1 FO R� TEL (760)323-8253 • FAX(760)322-8360 • TDD F60,864-9527
ANNUAL OVERALL GOAL INFORMATION
TO: CALTRANS DISTRICT 08
District Local Assistance Engineer
The amount of overall goal, methodology, breakout of estimated race-neutral and race-conscious
participation, and any DBE program updates are presented herein in accordance with Title 49 of
the Code of Federal Regulations Part 26, and as described in the Local Assistance Procedures
Manual.
The City of Palm Springs submits our annual overall goal information (and any needed updates
of our DBE program) for your review and comment. We propose an annual overall DBE goal of
16% for the Federal Fiscal Year 2001/2002, beginning on October 1, 2001 and ending on
September 30, 2002.
Methodology
I. DOT-ASSISTED CONTRACTING PROGRAM FOR IFFY 2001/02
The following represents the City of Palm Springs' projected FHWA funded contracts and
expenditures by work category and corresponding NACIS Code for FFY 2001/02:
STPL 5282 (013); City Project 99-14 — Gene Autry Trail Sidewalk and Bikeway Project
TEA Grant, 88.53% Federal Participation
Type of Work: Concrete Construction — SIC 1611, NAICS 2357
[Preliminary Engineering previously authorized and obligated — not included in total]
Construction/Construction Engineering to be authorized
Construction Estimate: $300,000; Federal —$266,000
CML 6164 (010); City Project 99-21 — 1999/2000 PM-10 Paving Projects
CMAQ/TEA 21 PM10 Project, 88.53% Federal Participation
Type of Work: Highway & Street Construction — SIC 1611, NAICS 23411
[Preliminary Engineering previously authorized and obligated — not included in total]
Construction/Construction Engineering to be authorized
Construction Estimate: $300,000; Federal — $266,000
STPLER 5282 (014); City Project 2000-01 —Gene Autry Trail/Ramon Road Median Landscaping
TEA Grant; 79% Federal Participation
Type of Work: Landscaping — SIC 0781, NAICS 44422 and 56173
[Preliminary Engineering previously authorized and obligated — not included in total]
Construction/Construction Engineering to be authorized
Construction Estimate: $550,000; Federal — $435,000
Post Office Box 2743 0 Palm Springs, California 92263-2743
,STPLG 5282 (010); City Project 2000-05 —Tahquitz Canyon Way Traffic Signal Interconnect
STP Grant; 100% Federal Participation
Type of Work: Electrical — SIC 1611, NAICS 2353
[Preliminary Engineering previously authorized and obligated — not included in total]
Construction/Construction Engineering to be authorized
Construction Estimate: $600,000; Federal — $600,000
STPL 5282 (016); City Project 2000-10 — Indian Canyon Drive Widening, south of Garnet
STP Grant; 88.53% Federal Participation
Type of work: Highway & Street Construction
Preliminary Engineering, Construction/Construction Engineering to be authorized
Engineering Estimate: $20,000; Federal — $18,000
Construction Estimate: $180,000; Federal —$160,000
Summarized in the following Table:
Estimated % of Federal
Work Category SIC Category NAICS Category Federal Dollar Funding by
Value Work Category
Highway & Street 1611 23411 $426,000.00 24.41%
Construction
Electrical 1611 2353 $600,000.00 34.38%
Concrete 1611 2357 $266,000.00 15.24%
Landscaping 0781 44422/56173 $435,000.00 24.93%
Civil Engineering Consulting 8711 54133 $18,000.00 1.04%
Totals>` ; Kk $1,745,000.00 100.00%
U. GOAL METHODOLOGY
Step 1: Determination of a Base Figure
To establish the City of Palm Springs' Base Figure of the relative availability of DBE's in relation
to all comparable firms available for the City's FFY 2001/02 DOT-assisted contracting program,
the City has elected to utilize the Caltrans DBE Directory of certified firms (filtered to represent
only DBE firms within the City's relevant market area of Los Angeles, Orange, San Bernardino,
Riverside, Imperial and San Diego Counties)forcalculating the numerator and the County Census
Bureau Data within the same geographical market area to calculate the denominator, as follows:
For the numerator: Caltrans' DBE Directory
For the denominator: Census Bureau's Business Pattern Database (CBP)
Or, Number of Ready, Willinq and Able DBE's
Number of All Ready, Willing and Able Firms
Numerator (Caltrans DBE's within Market Area)
Note: Information was obtained using the Caltrans DBE Calcert file, extracting DBE firms
by Work Category Code (WCC), and filtering for firms located within the market area.
For Highway & Street Construction; Work Type NAICS 23411 (WCC 2201): 17 DBE's
For Electrical; Work Type NAICS 23531 (WCC 8602): 19 DBE's
For Concrete; Work Type NAICS 23571 (WCC 4010): 25 DBE's
For Landscaping; Work Type NAICS 56173 & 44422 (WCC 0620): 8 DBE's
For Civil Engineering Consulting; Work Type NAICS 54133 (WCC 8720): 82 DBE's
Denominator (Firms within Market Area)
Note: Information was obtained by extracting the U.S. Census Bureau's Business Pattern
Database for firms by NAICS work type for each County within the market area, summarized in
the following Table:
NAICS Work Type Code
County 23411 23531 23571 44422 54133 56173
Riverside 60 330 181 60 168 393
Los Angeles 118 1520 359 180 1464 958
San 51 303 136 38 185 210
.Bernardino
Orange 74 681 236 71 1009 658
San Diego 98 557 245 83 849 728
Imperial 3 17 8 19 10 29
Totals 404 3408 1165 451 3685 2976
Base Figure = (0.2441) (DBE's in NAICS 23411) _ (0.2441)(17) = 0.1037
CBP's in NAICS 23411 (404)
+ (0.3438)(DBE's in NAICS 2353) + (0.3438)(19) = 0.0019
CBP's in NAICS 2353 (3408)
+ (0.1524)(DBE's in NAICS 2357) + (0.1524)(25) = 0.0033
CBP's in NAICS 2357 (1165)
+ (0.2493)(DBE's in NAICS 44422) + (0.2493)(8) = 0.0006
CBP's in NAICS 44422 (3427)
+ (0.0104)(DBE's in NAICS 54133) + (0.0104)(82) = 0.0002
CBP's in NAICS 54133 (3685)
Base Figure = (0.1037) + (0.0019) + (0.0033) + (0.0006) + (0.0002) = 0.1097 = 11%
Step 2: Adjusting the Base Figure
Upon establishing the Base Figure, the City reviewed and assessed other known relevant
evidence to determine what additional adjustments, if any,were needed to narrowly tailor the Base
Figure to the City's marketplace. Factors considered in determining the City's DBE participation
that can be expected, absent discrimination, included the following:
A. Current Capacity of DBE's Measured by Actual Attainments
The volume of work that DBE's performed in the City's DOT-assisted contracting program for
Fiscal Years 1998/1999 and 1999/2000 based on actual DBE utilization paid report summaries,
summarized in the following Table:
3 ;,,• „ Project
STPLE 5282 STPLG 5282 STPLZ 5282 STPLG 5282 STPLG 5282
Fiscal Year (004) (006) (007) (008) (009) Average DBE
City Project City Project City Project City Project City Project Participation
93-49/93-50 95-38 96-43 95-27 96-29
m +tea.
1998/99 %�E�� 10.01% i'R Er 12.12% 8.92% 10.35%
.:
1999/00 22.00% '.+ ,eq s 17.63% No; 19.82%
For Fiscal Year 1998/99, the following represented the City's FHWA funded contracts and
expenditures by Work category and and corresponding NACIS Code:
STPLG 5282 (006); City Project 95-38 — Mid Valley Parkway Phase 1 Landscaping
TEA Grant, 88.53% Federal Participation
Type of Work: Landscaping —SIC 0781, NAICS 44422 and 56173
Construction Total: $249,633.00; Federal — $221,000.00
STPLG 5282 (008); City Project 95-27 — Gene Autry Trail /Tachevah Drive Traffic Signal
STP Grant, 100.00% Federal Participation
Type of Work: Electrical —SIC 1611. NAICS 2353
Construction Total: $125,933.29; Federal —$125,933.29
STPLG 5282 (009); City Project 96-29 — Sunrise Way/ Racquet Club Drive Traffic Signal
STP Grant; 100.00% Federal Participation
Type of work: Electrical
Construction Total: $137,000.00; Federal — $137,000.00
Summarized in the following Table:
Estimated DBE Goal
Work Category SIC Category NAICS Category Federal Dollar
Attainment
Value
Electrical 1611 2353 $262,933.29 10.52%*
Landscaping 0781 44422156173 $221,000.00 10.01%
Average � '` y 10.35%
*Average DBE Goal Attainment for both Federal Projects.
For Fiscal Year 1999/00, the following represented the City's FHWA funded contracts and
expenditures by Work category and and corresponding NACIS Code:
STPLE 5282 (004); City Project 93-49 & 93-50— Heritage Trail Sidewalk/Bikeway Project
TEA Grant; 82.25% & 88.53% Federal Participation
Type of Work: Concrete Construction — SIC 1611, NAICS 2357
Construction Total: $873,781.00; Federal — $733,756.00
STPLZ 5282 (007); City Project 96-43 — Indian Avenue Overhead Seismic Retrofit
STP Grant; 100.00% Federal Participation
Type of work: Highway & Street Construction
Construction Total: $212,898.00; Federal — $212,898.00
Summarized in the following Table:
Estimated DBE Goal
Work Category SIC Category NAICS Category Federal Dollar
Attainment
Value
Highway & Street 1611 23411 $212,898.00 17.63%
Construction
Concrete 1611 2357 $733,756.00 22.00%
,tttE h
Average tr <«.... k 'F , j �3 19.82%
B Resultant Goal Adjustment
The average DBE Goal attained through the two-year Fiscal Period 1998 -2000 was 14.14%, an
increase of 41.4% over the stated 10.00% annual goal. This factor resulted in an upward
adjustment of the Base Figure from 11%to 16%for DBE participation in the City of Palm Springs'
DOT-assisted contracts projected to be expended in Fiscal Year 2001/02.
III. UTILIZATION OF RACE-NEUTRAL AND RACE-CONSCIOUS METHODS
The City maintained a DBE Program Overall (Race-Conscious) Goal of 10.00% for Fiscal Years
1998/99 and 1999/00, showing that on average, the City was successful in obtaining its Overall
(Race-Conscious) Goal and a Race-Neutral Goal of 0.35%for Fiscal Year 1998/99 and 9.82%for
Fiscal Year 1999/00, or an average Race-Neutral Goal of 5.09% for the two-year Fiscal Period
1998-2000.
Of the overall annual 16% goal for DBE participation, the City of Palm Springs expects meeting
5% of the goal utilizing race-neutral methods.
DBE Proqram Updates
Not Applicable (None). QQ /
DBE Liaison Officer Date
MINUTE ORDER NO. 6914
APPROVING THE CITY OF PALM SPRINGS
DISADVANTAGED BUSINESS ENTERPRISE
PROGRAM FOR FHWA FUNDED PROJECTS IN
FEDERAL FISCAL YEAR 2001/2002.
------------------
I HEREBY CERTIFY that this Minute Order, approving the City of Palm Springs
Disadvantaged Business Enterprise Program for FHWA funded projects in
Federal Fiscal Year 2001/2002, was adopted by the City Council of the City of
Palm Springs, California, in a meeting thereof held on the 51h day of September,
2001.
PATRICIA A. SANDERS
City Clerk
F-