HomeMy WebLinkAbout3/7/2007 - STAFF REPORTS - 3.A. DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME
ADDRESS o'"ri✓o
��a7�zaa 7
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME_
ADDRESS A •
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition,
NAME �u
ADDRR j S
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME U, z—
ADDRESSu�
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME fit. - e
ADDRESST(S � c5laww U� (�f.
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAM k?&ei A &/ WL
ADDRESS �fA 9x 4 PJ020C ELF
km s ffwV 6S x,(/
DATE' 3/7l07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek"-
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME L C) ,-
ADDRESS 7v
J
--- 7
DATE. 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME F/i/VUe 5�' Crkl�
ADDRESS 1 5`P5 5hR-11� G , , APT
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME_
ADDRESS 5975
1pr� MA
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME &UZ,' reA5 �
ADDRESS_
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME .-�} _L�/�/ .
ADDRESS %& z
v
Cam? G 7
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME )VUY'i i L4 efi 61ae
ADDRESS
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME
ADDRESS -
���
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
1
NAME '
ADDRESS (O
DATE. 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME
ADDRESS
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME .J vlim(" A Iy,,c)d
ADDRESS 92 Sf,,W .S Qpt• cl PI
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME „LI,11/? U Qi (,—)(lri C
ADDRESS Fao�
A Gi'a
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME Wu l,,- 220m
ADDRESS I Z �
VMJ IM CIA
DATE.: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME �' �✓�1� 2���
ADDRESS JOJ. 5 % 7
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME �Ilzl
ADDRESS STg2- G 5fZve??s xi,
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME
ADDRESS
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME ��if/!/lil� _ ( lM T�i/+a TlPA✓�
ADDRESS
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME 6 W e
ADDRESS 1-tic 40 , ��z
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME C;177f l,lz. Y!iy°mil
ADDRESS 7�/�s"ICJ/� G!'�✓ i�L
q
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME of , c C
ADDRESS PD ` b
P311T) �� n� ��� OA-
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME L �" }
ADQF S
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME
ADDRESS �Z .e)Pd ) Lo1e"J2.oj�b q--�I
DATE: 3/7/07
TO: Palm Springs City Council
Please DO NOT change the existing zoning of Planning area B "Snow
Creek".
This is a precious and environmentally sensitive area, as well as the
entrance to Palm Springs, and should be maintained in its current pristine
and protected condition.
NAME Al" � S
ADDRESS J 0 _� 6 r�/�
SIOVAK BARON&EMPEY,.Lp
A T T O R N E Y 5 A T L A W
TI NTY OFFICE
DAVID s$ SLON 1600 E TAHOUITZ CANYON WAY,PALM SPRINGS,CALIFORNIA 92262 650 TOWN CENTER`ORIV ,SUITE 1400
nAv�o L.snxaN
MARCE EMFCY PHONE(760)322-2275 FAX(760)322-2107 PHONECOSTA IMESA,C a RNIA(71� 92626
JASOND DABAREINER
PUCK M CiOCINMICH
CHARL[sL GAIJAGHER
HRENTS CLEMMBR
SUSAN W AU5MAN
' MAUREEN F.GUINAN
SIIAUNM MUMHY
JAMEsM RosiNSON
' OF COUN4EL —
MYRON MLYER2,r C
H N¢nL W EULS III 'y `
0—
March 7, 2007
•_T
Mayor and City Counsel Members
CITY OF PALM SPRINGS
3200 East Tahquitz Canyon Way
Palm Springs, California 92262
RE: AREA 9 DENSITY
Dear Mayor and Counsel Members:
On the Counsel's agenda this evening is a request to increase density in Area 9 from the
current zoning of one-unit per acre to three-units per acre. If you recall, counsel asked for cost
estimates on the all weather bridge to ascertain whether the unusual cost of infrastructure for this
area warranted increased density.
In your packet, you have a projected cost estimate from IIazard Construction Company of
over$7 million for the bridge. More recent cost estimate, based on raw materials resulted in the
cost estimate arising to at 7.2 million dollars.
Of the acreage that my client owns we believe there is approximately 239 developable
acres at one- unit per acre, the additional pre-unit cost attributable solely to the bridge is $30,125
per lot.
At 2 units per acre the additional cost per lot will be $15,062 per lot.
At 2.5 units per acre the additional cost per lot will be $11,297.
At 3 units per acre the additional cost per lot will be $7,531.
,a=/-770, IAA /71F_EEIA4-5
d•3�677��oa7
G.0am\Wendy0L3\SOM13RS-AREA 9 DF.NSITYUSR TO CITY COUNSEL wpd M+�
Mayor and City Counsel Members
March 7, 2007
Page 2
1 submit these calculations to make it easy for you to evaluate the added per unit cost as a
result of the bridge.
Very truly yours,
SLOV - RON RY LLP
DAVID L. BARON
DLB:sd
G 0a1a\Wendy0LB\SOMFR$•pJRLA 9➢ENSiTrLTR TO CI I Y COUNSEL.wpd
?A.`M SAS
iy
V N
4 4
�2eeean.co 0
„Cq<IFOR��Pr CITY COUNCIL STAFF REPORT
DATE: MARCH 7, 2007 LEGISLATIVE
SUBJECT: INITIATION OF ZONE TEXT AMENDMENT TO SECTION 92.21.1.04
("ESA-SP" ZONE — PROPERTY DEVELOPMENT STANDARDS) OF THE
PALM SPRINGS ZONING CODE RELATED TO THE MAXIMUM
ALLOWED DENSITY OF PLANNING AREA 9 ("SNOW CREEK").
FROM: David H. Ready, City Manager
BY: Planning Department
SUMMARY
On January 18, 2007, the City received a letter from David L. Baron / Slovak, Baron &
Empey, LLP requesting on behalf of the owners that the zoning density for Planning
Area 9 (Snow Creek) of the ESA-SP zone be increased from 1 to 2.5 dwelling units per
acre. The letter was provided in response to the City Council's comments during the
hearings on the ESA-SP zone in 2006. During those hearings, the Council indicated
that it was inclined to consider a density increase for Planning Area 9 should the
property owner show that the cost to provide access and other services would make
development of the site economically infeasible at the adopted density of one unit per
acre.
RECOMMENDATION:
1. Initiate a Zone Text Amendment pursuant to Section 94.07.01.A.1.b to amend
the development standards of Planning Area 9 of the Environmentally Sensitive
Areas — Specific Plan (ESA-SP) Zone (Section 9221.1,04).
STAFF ANALYSIS:
Mr. Baron's letter of January 18, 2007 is attached and includes a separate letter from
Hazard Construction Company which estimates that construction of a four-lane bridge
and related improvements would total slightly over seven million dollars ($7,000,000).
Mr. Baron suggests that the bridge plus other improvements for other roads, sewers
and remaining infrastructure would not be justified at the current density.
Staff believes that a final conclusion on the economic feasibility of developing Planning
ITEM NO.
City Council Staff Report March 7, 2007
Initiation of Zoning Ordinance Text Amendment—Planning Area 9 Density Standard Page 2 of 2
Area 9 would require far more analysis than presented in the attachments. However, it
seems clear that the provision of infrastructure to Planning Area 9 will be costly and that
additional density would reduce the per-unit fixed costs of development.
The Council may initiate an amendment to the Zoning Code, under section
94.07.01.A.1.b, to revise the development standards for Planning Area 9. A draft
amendment would be reviewed by the Planning Commission in a public hearing and
forwarded to the City Council for final action. Alternatively, the Council may give other
direction to staff or the applicant, including the preparation of additional cost data or
submission of a detailed project application, including an amendment for additional
density.
FISCAL IMPACT: Finance Director Review:
No fiscal impact.
Ig ing, Ate' Thomas J. Wil
Direc or of Planning ervices Assistant City anager, Dev't Svcs
David H. Ready
City Manager
Attached: Letter from David L. Baron; January 18, 2007 (with attachment)
Palm Springs Zoning Code Section 92,21.1 (excerpt)
r
SLOVAK BAR�7N&EMMY
A T T 0 R N E Y 5 A T L A W
TIIOMA55.6RONk 1 g00 E TAHQNITZ CANTON WAY,PALM SPRINGS,CALIFORNIA 92262 ,50 TOW`N CETi RoxNOL�"SimE lann
peYlo L Bnxory
MAkcE EMPEY PHONE(760)322-2275 FAX(760)322-2107 COSTA MESA,CAUrORbdA 92e2a
,IAcnn➢➢AHN INER PHONE1714)USAWI FACp1,11650-91AI
PETLk M BOCNNE ICH
BRIANE WiuTL21
Cwu 2SL& LIGI6R
VINCEN�R WHIT`]' : k
BUNT S.CLEMMER
SusAN W ALbMAN
MAUaFI-N F GLm AN
SHALTI M 14bw Y
UI COUNSEL
LOCIENA VAN(I'JLLI,
MYRON Nip i IS,P.0
H huu.WLLLS UI
January 18, 2007
Tom Wilson, Assistant City Manager
CITY OF PALM SPRINGS
Post Office Box 2743
Palm Springs, California 92263-2743
RE: Request for Modification of Density in Area 9
Dear Tom.
]During t'.ze hearings on densiry for Area 9 (Snow Creek). the City was advised that the cost of
hnilding the infrastructure at the location was so significant that it warranted a loosening of the
density restrictions being consider^d by the City at that time. Based upon the lack of information
at that juncture, the City passed the new zoning for Area 9. but indicating a willingness to
1 increase the density if it could be demonstrated that, in fact. the cost of building the all weather
' bridge and other infrastructure costs are so significant that it would render the economic viability
of any project futile given the allowable density when measured against the cost of building that
base infrastructure.
During the hearings on this matter, I advised council that the cost of the all weather bridge,
would most likely, exceed $3,000,000 to $4,000,000. My estimates were low. Enclosed herein
is a cost analysis by Hazard Construction Company, who are experts in building bridges of the
type required by the City for this development. As you can see, the cost estimate by Hazard
Construction Company is in excess of$7,000,000- Hazard Construction Company also advised
me that the other infrastructure costs relating to roads, earth work, sewer installation, etc„ were
far more significant than we initially envisioned.
Based upon this infortnation;which is being provided at your request, the Galway Trust formally
requests,a change in the density from the current I unit per acre to 2.5 units per acre.
G\➢aialLmgmlon Dept\Gahesy TrustlCortegprnldcnccLLtr Tom w1lunCA.,of Pnlm Spnnss(1-7 d-u'7)wpd
^I`rn7rn n n -
r
January 18, 2007
Page 2
1 understand that we are going to have to go through the hearing process, inasmuch as the
ordinance was already adopted, but 1 would like your direction as to what additional information
or documentation you need from me to start this process-
If you have any questions, please do not hesitate to contact me.
Very truly yours,
SLOON P1 X LLP
4DVOIDLBA. 1tON
DLB:sd
Enclosures
cc- Doug Holland, City Attorney
Allan Hamel
Steve Lyle
C\D,,IaUtlt�alion DepAGalwq TruSACorrLgpondenceV,n Tnm Wilson-City oiPalm Spnngs(1-18-07)wpd
Hazard Construction Company
CONSTRUCTION • MANAGEMENT SITE DEVELOPMENT
fY dr
G
yrW AQy
December 14, 2006
Mr. David L. Baron, Esq.
Slovak Baron and Empey, LLP
1800 E. Tahquitz Canyon Way
Palm Springs, CA 92262
Re: Snow Creek Ranch
Patin Springs, California
Dear Mr. Baron:
This letter is written in response to your request to provide a preliminary budget analysis for the
Improvement of Snow Creek Road off of Highway I I I as it relates to the above referenced project.
This analysis allows for the improvement of Snow Creek Road, at the west side intersection of
Highway 111,and extending 3,500 feet to the west.
A. Scope of Work Approx Qty. Unit Price Total
I . Traffic Control I LS @ $15,000.00 / LS = $15,000.00
2 . CIP,Reinforced Concrete Bridge 51,200 SF @ $130,00 / SF = $6,656,000.00
3 . Remove Existing Base and Surfacing 84,000 SF @ $0.60 / SF = $50,400,00
4 . Subgrade Preparation 86,400 SF @ $0.30 / SF = $25,920.00
5 , 4" Asphalt Concrete over 8" Class 2 Base 86,400 SF CO) $3.00 / SF = $259,200.00
6 . Striping and Signage 1 LS @ S10,000.00 / LS = $10,000,00
Budget Total: $7,016,520.00
The above cost analysis allows for the installation of a four lane concrete bridge just west of Highway
I] 1 crossing the existing wash for 800 LF and then an asphalt concrete roadway extending to the 3500'
termination point.
This analysis is only for the scope of work shown and does not include roadway access to the site or
any other onsite grading,sewer,water or dry utility construction cost and other offsite improvements required
to develop this site.
This analysis is preliminary and should be further reviewed as more information is provided.
' I look forward to further discussing this site development with you. Thank you for your cooperation.
Sincerely,
HAZARD CONSTRUCTION COMPANY
W.S. Rog s
Executiv ice President
P.O. Box 229000 San Diego, CA 92192-9000•(858) 587-3600 •(858) 4$3-6034 Fax-License No.750542A
92.21.1.04 Property development standards—Uses subject to a specific plan.
Minimum Required Open Minimum Required
Planning Maximum Allowed Space: open Space:
Area Density All Forms Undeveloped Maximum Floor Area
1 Go to Base Zone(One DU/40 Acres) 2
2 2 DU/Acre 72%of Project Area 35%of Project Area 6,000 SP/DU 1
c
3 Tribe Specific Plan s
4 2 DU/Acre 72%of Project Area 35%of Project Area 6,000 SF/DU 9
e
5 6 DU/Acre 72%of Project Area 35%of Project Area 2,000 SF/DU a
5A 0.25 Floor Area Ratio Not Applicable Not Applicable Not Applicable
y
6 1 5 DU/Acre 79%of Project Area 40%of Project Area 6,000 SF/DU s
7 Gn to Base Zone(One DU/40 Acres)
� e
` 8 2 DU/Acre 72%of Project Area 35%of Project Area 6,000 SF/DU c
9 1 DU/Acre 81%of Project Area 40%of Project Area 8,000 SF/DU t
percent above the toe of slope, and shall be limited to natural and renaturalized land, and hiking trails. Dedication for public
access shall be provided to undeveloped open space.
http://www.gcode,us/codes/palmsprings/view.php?topic=zoning code-92_00-92 21 1 04&frames�on 2/21/2007