HomeMy WebLinkAbout3/7/2007 - STAFF REPORTS - 2.L. ;O�P P.LM SA4 iy u � �a e c'441 F^O'Rc��P» CITY COUNCIL STAFF REPORT DATE: March 7, 2007 CONSENT SUBJECT: Gensler Change Order No.3 — Additional Structural Services — Airport Hold-room FROM: David H. Ready, City Manager BY: City Manager SUMMARY This action would provide approval of a Change Order to the Gensler architectural design contract to add structural design services for the Airport Hold-room project in the amount of$12,000. RECOMMENDATION: Recommend that City Council adopt Minute Order No. approving Change Order No. 3 to Agreement No. A4382 (Amendment No. 11) with Gensler adding structural design services for the Regional Jet Hold-room project to the design contract for an amount not to exceed $12,000, subject to approval of the Federal Aviation Administration. STAFF ANALYSIS: Gensler is the architectural firm that designed the Regional Jet Hold-room and the Security Check Point Expansion projects. The original contract included design as well as construction administration services from the architect and all the design consultants. Both projects were budget to run concurrent over a ten month period. The projects were split apart for budget purposes and the first project, Security Check Point, ran well beyond the original budgeted time. These delays and changes were beyond the control of the design consultants and they quickly exhausted the budget that was allocated for construction administration. Of particular concern has been the structural consultant who has continued to provide services despite the fact that funding has run out. The Hold-room project is in a critical period where the help of the structural designer is ITEM NO.J�— City Council Staff Report March 7, 2007 - Page 2 Gensler Change Order of $12,000; see attached proposal letter. Staff recommends approval of the attached Minute Order to approve the contract increase FISCAL IMPACT: The design work contemplated in the Change Order is eligible under AIP 38 for reimbursement and is budgeted in account 415-6600-56063. 4I" 1 Allen F. Smoot, AirpoN Construction Administrator David H. Ready, City If Attachments: 1. Minute Order 2. Change Order MINUTE ORDER NO. APPROVING CHANGE ORDER NO. 3 TO AGREEMENT NO. A4382 (AMENDMENT NO, 11) WITH GENSLER, ADDING STRUCTURAL, DESIGN SERVICES FOR TIIE REGIONAL JET HOLD-ROOM PROJECT TO TIIE DESIGN CONTRACT FOR AN AMOUNT NOT TO EXCEED $12,000, SUBJECT TO APPROVAL OF THE FEDERAL AVIATION ADMINISTRATION. I, James Thompson, City Clerk of the City of Palm. Springs, hereby certify that this Minute Order approving Change Order No. to Agreement No. A4382 (Amendment No. ll) with Gensler, adding structural design services for the Regional Jet Hold-room project to the design contract for an amount not to exceed $12,000, subject to the approval of the Federal Aviation Administration was adopted by the City Council of the City of Palm Springs, California in a meeting tbereof held on the 7"'day of March, 2007. James Thompson, City Clerk CITY OF PALM SPRINGS Expand Terminal/Expand Hold-room- Checkpoint Phase III (Part 2) CHANGE ORDER To: Gensler Date. March 7, 2007 2500 Broadway Suite 300 Project No. CP05-010 Santa Monica, Ca 90404 Project Name: Design Terminal Hold-room (Part 2) Change Order No.03 AIP 38 Attn: Andy Cohen, FAIA Contract No.A4382(Amend No. 11) Description of Change: This Change Order is for Structural Engineering Extra Services related to the airport Hold-room project. Specifically for continued Construction Administration Services,signage foundation and retaining wall foundation design work. Summary of Cost/Time Original Contract Price $ 828,795.08 Total of all Previous Change Orders $ 158,160.00 Total of this Change Order $ 12,000.00 Total Contract Price $ 998,955.08 This Change Order Wreases)�.�e� (unchanged) the contract time by 0 working days. I have received a copy of this Change Order Construction Administrator and the above AGREED PRICES are acceptable Approval: Date: to the contractor. By: Aviation Department Approval: Title: Approved by. Date, Date: Airport Construction Administrator City Approval Date: City Clerk Date: City Manager Distribution: Original Conformed Copies Conformed- File Copy City Clerk (1) Contractor (1) Procurement& Contracting (1) FAA (1) Finance (1) Airport File (1) Page 1 of I February 12,2007 Arehirecrure, Design es Planning Worldwide Gensler Mr.Allen Smoot Palm Springs International Airport 3400 E.Tahquitz Canyon Way,Suite OFC Palm Springs,California 92262-6966 SubjectTalm Springs International Airport Security Expansion, Structural Engineering Extra Services Request 05.0201.022 Dear Allen: Gensler is requesting Extra Services on behalf of Brandow Johnston for structural engineering items related to the hold Room D project(Phase Il of Amendment 11)at Pahn Springs International Airport.The request is divided into the following categories: 1) Continued Construction Administration Services. This is to allow Brandow Johnston to provide continuing services during the construction administration phase.Included in this service will be 2 site visits to observe the progress of construction(16 hours)and responses to current and future requests for information(39 hours)- 2)Signage foundation.This is for the design of a structural footing to support the freestanding signage that will be located between the Checkpoint and Hold Room A. 3).Detaining wall.Brandow Johnston will provide the structural design of the retaining wall to be located between the Check Point and the Hold Room-The wall will be designed to retain a maximum of 4 1/2'of earth. Fee: This service will be billed on an hourly basis using the established hourly rates for this contract. Item Hrs Fee 1)Continued Construction Adnninistration services 55 S10,170 3 Sign footing design 6 $950 4 Retainin Wall design 3 S380 Total Labor Fee $11,500 Reimbursable Expenses $500 Total Fee and Reimbursable $12,000 Please gii c me a call if you have any questions- Sincerely, Keith Thompson Principal SWI Broadway airc 300 KAT/Sun Santa Monica CaliFOrnla 90404 M:\05,0201.022\Documcnmiion\I General\IC\LT070212 ES.dvc Tcl:;io.449. 5600 - - Fax:310-449. 5850