Loading...
HomeMy WebLinkAbout3/7/2007 - STAFF REPORTS - 2.J. ;O pPLM Spy .y V N � x rA`'�°"�'P City Council Staff Re nort MARCH 7, 2007 CONSENT CALENDAR Subject: PALM SPRINGS STORM DRAIN LINES 6A, 8, 20C, AND 20CA, CITY PROJECT NO 05-20 From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY Agreement No. 5275 with Engineering Resources of Southern California, Inc., approved by City Council on May 3, 2006, provides the City with engineering design services for the construction of various master-planned storm drain facilities in the City. Additional utility pot-holing is necessary to complete the final design. A Contract Services Agreement Amendment has been prepared to facilitate the additional scope of work as part of this project. RECOMMENDATION: 1) Adopt Minute Order No. "APPROVING AMENDMENT NO. ONE (1) TO AGREEMENT NO. 5275 WITH ENGINEERING RESOURCES OF SOUTHERN CALIFORNIA, INC., IN THE AMOUNT OF $46,930 FOR A TOTAL REVISED CONTRACT AMOUNT OF $342,410 FOR THE PALM SPRINGS STORM DRAIN LINE 6A, 8, 20C AND 20CA, CITY PROJECT NO. 05-20;" and 2) Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS. On May 3, 2006, City Council awarded a contract services agreement to Engineering Resources of Southern California, Inc., for the design of several master-planned storm drain facilities in the City: Line 6A (located in Sunrise Way extending from Vista Chino to Via Escuela), Line 8 (in Sunrise Way extending from Baristo Channel to Tahquitz Canyon Way), Line 20C (in El Cielo Road extending from Ramon Road to Baristo Road), and Line 20CA (in Baristo Road extending from El Cielo Road to Compadre Road). The original contract services agreement included an estimated number of utility potholing, necessary to physically locate underground utilities that may conflict with the storm drain lines, and to identify utilities that require relocation or adjustment prior to ITEM NO. S � City Council Staff Report • March 7, 2007- Page 2 Palm Springs Storm Drain Lines 6A, 8, 200, 20CA(CP 05-20)—Contract Amendment No. 1 construction of our project. The original contract estimated the total number of utility potholing at 46 locations, based on assuming the presence of a certain number of utilities (Le, water, sewer, electric), and specifically identified the need for a contract amendment in the event additional utility potholing was required, Utility potholing was originally compensated on a unit price per pothole basis of $850, based on fees charged by Saf-R-Dig, a sub-contractor performing the excavations for utility potholing. The City's consultant has completed the conceptual design and alignment of the various storm drain facilities, and has identified locations of all existing underground utilities. As a result, all potential areas of conflict with proposed storm drain facilities and existing utilities has been identified. A much greater number of underground utilities were identified in the City's streets that have the potential of conflicting with the planned storm drain improvements, requiring an additional 67 utility potholes, for a total of 113. A contract services agreement Amendment has been prepared to add the additional utility potholing and survey coordination, with an agreed fee of$46,930. The agreed fee includes a reduced unit cost per utility pothole of $636.57 (or a fee of $42,650) and an additional fee of$4,280 for survey coordination. l FISCAL IMPACT: Finance Director Review: Sufficient funds are available in accounts 135-4370-55009, 135-4371-55006, and 135-4371-55010. David J. Barakian Thomas J. son Director of Public Works/City Engineer Assistant City Manager REVIEWED BY DEPT.OF FINANCE David ATTACHMENTS: J 1. Contract Services Agreement, Amendment No, 1 2. Minute Order AMENDMENT NO. 1 TO CONTRACT SERVICES AGREEMENT NO. 5275 WITH ENGINEERING RESOURCES OF SOUTHERN CALIFORNIA, INC. PALM SPRINGS STORM DRAIN LINE 6A, 8, LATERAL 20C, AND LATERAL 20CA CITY PROJECT NO. 05-20 The following articles of Agreement No. 5275 are hereby amended to read as follows: SECTION 2.1 Maximum contract amount is amended to Three Hundred Forty-Two Thousand Four Hundred Ten Dollars ($342,410.00). SCOPE OF SERVICES (Exhibit"A") - Please see attached sheets for additional work. SCHEDULE OF COMPENSATION (Exhibit "C) - Please see attached sheet. Purchase Order Number(s): 616349 Agreement Number: 5275 Original MO Number: 7852 City Council Approval: May 3, 2006 Original Contract Amount: $ 295,480.00 Amount of Increase: $ 46,930.00 Amended Total: $ 342,410.00 SIGNATURES ON LAST PAGE Agreement No.5275 Amendment No, 1 Page 2 EXHIBIT A is amended as follows: Task 2.2 is revised to read: Task 2.2-Potholing Afteracceptance of the preliminary alignment for each storm drain,available as-built plans will be obtained from the utilities to identify potential crossings and conflicts with subsurface utilities. Once the key critical crossings and conflicts have been identified and marked in the field, Contractor shall locate existing subsurface utilities by potholing. Based on final conceptual plans prepared by Contractor, all areas of crossings and conflicts have been identified; the final number of potholes required for the final design of each storm drain line is as follows Original # Final # Line 6A: 8 38 Line 8• 28 47 Lateral20C/20CA: 10 28 After field survey personnel acquire the horizontal location,the utility data will be used to verifythe location, size and type of facilities shown on the plan sheets. Vertical data will be used to plot the utilities in profile and aide in the design of the vertical location of the storm drain and laterals as the construction drawings advance to 75 percent complete. Once the profile has been developed and various options have been evaluated, utility conflicts will be identified and summarized in a matrix giving the street name, storm drain station and type and size of utility impacted by the proposed storm drain. Plans showing utility conflicts identified as noted above will be provided to the City of Palm Springs, in addition to the utility company whose facilities require modification or relocation. This will constitute the second utility notification. Subsequent notifications will be forwarded to affected utilities with the 95 percent complete and final submittals. Agreement No.5275 Amendment No. 1 Page 3 EXHIBIT C is replaced with the following: Tasks listed below are identical to tasks identified in Exhibit A of this Agreement. Payments to Contractor shall be made no more frequently than monthly, and shall be based on costs per unit of work as indicated herein. Lump sum payments shall be made to Contractor based upon completion of tasks, or pro-rata portions thereof noted below,to a maximum of 75% of the lump sum task item fee until completion of such task item. Each request for payment shall contain Contractor's statement of the work or tasks completed or portion performed, with supporting documentation, The determination of payment due shall be made based upon the reasonable judgement of the Contract Officer. Task Total Lump Sum PHASE 1 - PRELIMINARY ENGINEERING Task 1.1, Record Data $2,540.00 Task 1.2, Mapping $52,060.00 Task 1.3, Hydrology $5,460.00 Task 1.4, Preliminary Design Line 6A $6,560.00 Line 8 (Baristo Channel to Tahquitz Canyon Way) $12,440.00 Line 8 (Tahquitz Canyon Way to Andreas Road) $2,720.00 Lateral 20C $8,350.00 Lateral 20CA $5,020.00 Task 1.5, Engineering Report $7,680.00 Task 1.6, Processing $2,900.00 Task 1.7 AqencV Coordination . 2 260,00 Phase 1 Subtotal $107,990.00 PHASE 2 - FINAL ENGINEERING Task 2.1, Geotechnical Engineering $19,940.00 Task 2.2, Potholing Coordination & Survey $13,770,00 Saf-R-Dig Potholes $81,750,00 Task 2.3, Plans, Specifications and Estimates Line 6A $15,040.00 Line 8 (Baristo Channel to Tahquitz Canyon Way) $29,720.00 Line 8 (Tahquitz Canyon Way to Andreas Road) $4,000.00 Lateral 20C $20,140,00 Lateral 20CA $11,220.00 Specifications $6,000,00 Estimates $3,820,00 Task 2.4, Storm Water Pollution Prevention Plan $6,000.00 Task 2.5, Fugitive Dust (PM-10) Control Plan $5,400,00 Task 2.6, Processing $2,260.00 Task 2.7 Agency Coordination $3,980,00 Phase 2 Subtotal $223,040.00 PHASE 3 - POST DESIGN SERVICES Task 3.1 Construction Phase Support $7,380.00 Phase 3 Subtotal $7,380.00 Reimburseables (not to exceed) $4,000.00 Grand Total of Contract $342,410.00 Except as specifically amended by this Amendment No. 1, all terms and provisions of Agreement No. 5275 remain in full force and effect. ATTEST: CITY OF PALM SPRINGS, a municipal corporation By: By: City Clerl< City Manager APPROVED AS TO FORM: By: City Attorney CONTRACTOR: Check one _individual_Partnership_Corporation Corporations mquiw two notarized signatures. Oue 5ign:4um must be tom the Chili-man of Board,President,or any Vwg Prubrdcnt.The second sign,aure must be tlom the$Cerutery, Assistant Seeietaiy,Ta,yuri.r,Assistant Treaswer,on Chief Financial Officer). By. By. Notunzed Sngnaturc of Chavman of Board, Notarized Srgnarurc Scclerat y, ASSt Secretary, Prcyidunt or any vice Pi esidenl Treasurer, Asst treasurer or Chief Financial Officer Namc: _ Name Title Tide Stare of Statc of I County of„ iss County of Iss On ,before mc, On__„__before inc, personally appeared personally appeared personally known to me(or proved to me on the basis of satisfactory pnsonally known to me(or proved to me on the basis ofsansfactai y evidence)to be the pcmon(s)whose name(s)is/arc subaerlbe(i to the evidence)to he the pason(s)whose name(s)ng/arc subscribed to the wndtin insnwncm and acla owledged In me glai ho/she/they executed within inslnimom and acknowledged to the the[he/she/they executed the bane in his4icr/[heir authorized capacrry(ics), and that by the some in his/hcr/then' Imhorizcd capenty(lcs), and rhal by his/hedthcir vgnmure(s)on the msomi ncnr the per5on(s),or the entity his/her/thcii angnpgpC(b)an the nstrumentthc person(s),or the entity upon hehalf of which the person(s)seied, Czu:uted the instrument upon behalf of which the person(5)aired,executed the msumnrent WITNESS my hand and official seal WITNESS my hand Ind afGcnd seal. Notary Signature:_, Notary Signamne! Notary Seal: Notary Seal MINUTE ORDER NO. APPROVING AMENDMENT NO. ONE (1) TO AGREEMENT NO. 5275 WITH ENGINEERING RESOURCES OF SOUTHERN CALIFORNIA, INC., IN THE AMOUNT OF $46,930 FOR A TOTAL REVISED CONTRACT AMOUNT OF $342,410 FOR THE PALM SPRINGS STORM DRAIN LINE 6A, 8, 20C AND 20CA, CITY PROJECT N0. 05-20 I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that this Minute Order approving Amendment No. One (1) to Agreement No. 5275 with Engineering Resources of Southern California, Inc., in the amount of $46,930 for a total revised contract amount of $342,410 for the Palm Springs Storm Drain Line 6A, 8, 20C and 20CA, City Project No. 05-20, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 7th day of March, 2007. James Thompson, City Clerk