HomeMy WebLinkAbout8/1/2001 - STAFF REPORTS (8) DATE: August 1, 2001
TO: City Council
FROM: Director of Public Works/City Engineer
CONSTRUCTION CHANGE ORDER NO. 1 TO E. L. YEAGER CONSTRUCTION
COMPANY
RECOMMENDATION:
It is recommended that City Council approve Contract Change Order No. 1 to E.
L. Yeager Construction Company, for an increase of $74,300.00, for a total
contract amount of $300,075.00, for the Crossley Tract Street and Drainage
Improvements, Phase 4, City Project No. 00-31.
SUMMARY:
Contract Change Order No. 1 will add installation of sewer laterals and sleeves for
future gas service to each vacant lot located on Marguerite Street.
BACKGROUND:
On June 6, 2001, the City Council awarded E. L. Yeager Construction Company
the contract for the Crossley Tract Street and Drainage Improvements, Phase 4,
City Project 00-31. This project is the final phase of the Community Development
Block Grant investments made to generally improve this low income neighborhood.
Subsequent to award of this project, staff received numerous inquiries from
potential home builders regarding the vacant lots within this neighborhood.
Specifically, of the forty lots located on Marguerite Street,twenty-eight are vacant.
Potentially, the completion of this project will stimulate development of the vacant
lots. In that event, the newly constructed street would be trenched and excavated
for sewer, water and gas service laterals for each vacant lot at the time of
development.
Staff has coordinated with Desert Water Agency and Southern California Gas
Company to facilitate installation of service laterals prior to construction of the
street improvements. In this way, all underground service laterals will be in place
and no street cuts will be required as the vacant lots develop.
This proposed change order covers the following items:
Increase to Contract Items (New):
Item A is proposed to be added to the contract to provide for the installation of four
inch vitrified clay pipe (VCP) sewer laterals, and connections to the exist sewer
main within Marguerite Street.
Item B is proposed to be added to the contract to provide for compensation to the
contractor for sheeting, shoring and bracing, or equivalent method, which is
required by law for excavations exceeding four feet in depth.
/A
Construction Change Order No. 1 to E. L. Yeager Construction Company
August 1, 2001
Page 2
Item C is proposed to be added to the contract to provide for the installation of one
inch schedule 40 yellow polyethylene (PE) pipe for use as sleeves for future gas
service laterals.
Fifteen working days will be added to the contract to allow for the construction time
required for the new contract items.
As the sewer,water and gas service laterals are ultimately the responsibility of the
owner(s) of the vacant lots, approval of this contract change order will temporarily
subsidize those owners the cost for installing the laterals. However, staff intends
to utilize the authority granted by Resolution 16031, adopted by the City Council
on October 15, 1986, that allows the City to install off-site improvements that are
the responsibility of a property owner in advance of developing their property, and
to seek reimbursement from the property owner as a condition of development of
the property at the time application for building permits is made. In this way, over
time as the vacant lots develop the City will recover the costs associated with this
change order.
Sufficient funds are available in block grant account no. 137-4801-63503 (Street
Improvements, Crossley Tract). Please note that all costs are being paid for by
outside HUD block grant funds and no local general funds are required, and
further, that these costs will be reimbursed as discussed above, and redistributed
into the City's block grant account for future use by block grant projects.
DAVID J. BARAKIAN
City Engineer
APPROVED:
City Manager G
ATTACHMENTS:
1. Minute Order
REVIEWED BY DEPT.OF FINANCE
_-PO
#76 2
CITY OF PALM SPRINGS
CONTRACT CHANGE ORDER
To: E.L.Yeager Construction Company Date: July 20 2001
P.O.Box 87 Project No.: C.P. 00-31
Riverside CA 92502 Project Name: Crossley Tract Phase 4
Change Order No.: One (1))
Attn: Gary Baxter- Superintendent Contract Purchase No.:
Account Number(s): 137-4801-63503
Agr.#4368 M.O. #6856 Res. #
A. CHANGES IN WORK:
Increase to Contract Bid Items (New):
Item Description
A Installation of four inch (4") vitrified clay pipe (VCP) sewer laterals to the center of each vacant lot
(29 in total) in conformance with Greenbook Standard Specifications and the attached Special
Provisions.
B Provisions for sheeting, shoring, bracing or equivalent method, in conformance with the attached
Special Provisions.
C Installation of one inch (1") schedule 40 yellow polyethylene (PE) pipe at each property line, from
right-of-way to right-of-way in conformance with Greenbook Standard Specifications and the
attached Special Provisions.
B. CHANGES IN CONTRACT COST:
Increase to Contract Bid Items (New):
Item Description
A Install 4 in. VCP Sewer Lateral 900 LF @ $67.00 $ 60,300.00
B Sheeting, Shoring, Bracing or Equivalent Method Lump Sum $ 3,000.00
C Install 1 in. Schedule 40 Yellow PE Pipe 1,000 LF @ $11.00 $ 11,000.00
Sub-Total $ 74,300.00
TOTAL NET CHANGE ORDER = $ 74,300.00
NOTE: No additional markup will be added to any items in this Contract Change Order.
C. REASON FOR CHANGE:
Perthe recommendation of the Director of Public Works/City Engineer, install 29 sewer laterals and 1 in.
Schedule 40 Yellow PE pipe sleeves for future gas services to the remaining vacant lots as part of this
project. By installing these utility laterals now, it eliminates the need to cut into the new street at the time
the vacant lots develop, thus avoiding numerous pavement trench cuts within a new street.
1,44
July 20, 2001
C.P. 00-31 Crossley Tract Phase 4
Change Order No. 1
Page 2 of 2
SOURCE OF FUNDS:
Crossley Tract Phase 4 Account No.: 137 -4801 -63503 = $ 74,300.00
Summary of Costs Contract Time
Original Contract Amount: $ 225,775.00 Original Completion Date:
This Change Order: $ 74,300.00 Days Added for this C.C.O.: 15
Previous Change Order(s): $ 0.00 Previous Days Added: 0
Revised Contract Amount: $ 300,075.00 Revised Completion Date:
I have received a copy of this Change Order and the City Approval:
above AGREED PRICES are acceptable to the
contractor. Submitted By Date
Field Engineering Supervisor
By Approved By Date
Title Director of Public Works/City Engineer
Approved By Date
Date City Manager
Distribution:
Original Conformed Copies Conformed-File Copy
Engineering (1) Engineering File (1)
Finance (1) Engineering Field Inspector (1)
Contractor (1) Engineering Field Supervisor (1)
City Clerk (1) Purchasing Agent (1)
IA
10-13 - SANITARY SEWER
10-13 .1 Materials . Vitrified clay pipe shall conform to
Standard Specification 207-8 . Vitrified clay pipe joints shall
conform to Standard Specification 208-2 . Cement mortar shall
conform to Standard Specification 201-5 .
10-13 .2 Methods. Installation and testing of vitrified clay
pipe shall conform to Standard Specification 306-1 . 2, 306-1 . 3 and
306-1 .4 and these Special Provisions .
10-13 .2 .1 Excavation, Backfill and Compaction. Prior to any
excavation the Contractor shall pothole to determine the location
and/or grades of connections or underground utilities, structures
or fixtures in the alignment of the proposed sewer.
Excavation for sewer pipe, laterals, fittings and appurtenances
shall be in open trench to the line and grade as required to
provide five feet (51 ) minimum cover at property line, with 2%
minimum slope to the sewer main. The trench bottom shall be
graded to provide a smooth, firm, moist and stable foundation. At
each joint, the bottom of the trench shall be shaped in such a
manner to relieve the bell of the pipe of all load. All rock
shall be removed to a depth of six inches (611 ) below the bottom
of the pipe . Embankment and over-excavated areas shall be filled
to provide a trench bottom as previously described.
Backfill of the trench about the pipe, laterals, fittings and
appurtenances will be with select sand material free of debris,
rock and similar hard, sharp objects to a distance of 12 inches
minimum. The Engineer shall approve all backfill materials .
Backfills shall be compacted to 90°s +/- 20 at optimum moisture
content . Compaction under pavements, structures and fixtures
shall conform to the specified density.
Surplus materials shall be legally disposed of. All excavation,
backfill, compaction, and material disposal costs shall be
considered as included in the unit price of that item for sewer
pipe, laterals, fittings or appurtenances .
10-13 .2 .2 Laterals. Installation of laterals shall conform to
City of Palm Springs Standard Drawing 405 and these Special
Provisions . The letter "S ' ' shall be etched or otherwise
permanently marked within the concrete curb face directly above
the lateral .
10-13 .3 Testing and Video. Testing, in accordance with the
Standard Specifications, will be required after completion and
acceptance of the roadway subgrade preparation. The sewer lines,
manhole to manhole, shall be analyzed by videotape photography.
Should the analysis indicate a change in the sewer line alignment
or damage to the utility, the Contractor shall repair the affected
area immediately, at no extra cost to the City.
7r4s'
10-13 .4 Measurement and Payment. Payment for vitrified clay
pipe shall be made at the unit price per linear foot, and shall
constitute full compensation for removal and disposal of all
resulting materials, all labor, materials, equipment and
incidentals, trenching, placement, backfill, complete in place, as
required in the Standard Specifications and these special
provisions .
10-13 .5 Sheeting, Shoring, and Bracing or Equivalent Method.
Payment for temporary sheeting, shoring, bracing or equivalent
method will be based upon completion of all planning, design,
engineering, furnishing, and construction, and the removal and
disposal of all such temporary sheeting, shoring, and bracing at
the lump sum price, complete, as required under the provisions of
any permits, and in accordance with the requirements of OSHA and
the Construction Safety Orders of the State of California,
pursuant to the provisions of Section 6707 of the California Labor
Code.
10-13 . 6 Protection of Existing Improvements. Should there be
any existing improvements that were known to the Contractor prior
to excavation, the Contractor shall restore or replace the
existing improvements to their original or better condition, at
the Contractor' s own expense.
10-14 - UTILITY LINE SLEEVES
10-14 .1 Materials . Polyethylene (PE) pipe shall conform to
Standard Specification 207-19 . All polyethylene (PE) pipe used
for utility line (natural gas) sleeves shall be rolled, one inch
(1 " ) nominal diameter, schedule 40 yellow color pipe.
10-14 .2 Methods. Installation of polyethylene (PE) pipe shall
conform to Standard Specification 306-1 .2 and 306-1 .3 and these
Special Provisions .
Prior to any excavation the Contractor shall pothole to determine
the location and/or grades of connections or underground
utilities, structures or fixtures in the alignment of the proposed
sewer.
Excavation for utility line (natural gas) sleeves shall be
provided such that a minimum 2411 cover from gutter flowline, or
30 " minimum cover, whichever is greater, is achieved. A minimum
6 " separation between utility line sleeves and other utilities
shall be maintained. The trench bottom shall be graded to provide
a smooth, firm, moist and stable foundation. All rock shall be
removed to a depth of six inches (611 ) below the bottom of the
utility sleeve .
Backfill of the trench about the pipe, laterals, fittings and
appurtenances will be with select sand material free of debris,
rock and similar hard, sharp objects to a distance of 12 inches
minimum. The Engineer shall approve all backfill materials .
7
Backfills shall be compacted to 90% +/- 2% at optimum moisture
content . Compaction under pavements, structures and fixtures
shall conform to the specified density.
The letter "G" shall be etched or otherwise permanently marked
within the concrete curb face directly above the utility sleeve .
10-14 .3 Measurement and Payment. Payment for polyethylene (PE)
pipe shall be made at the unit price per linear foot, and shall
constitute full compensation for removal and disposal of all
resulting materials, all labor, materials, equipment and
incidentals, trenching, placement, backfill, complete in place, as
required in the Standard Specifications and these special
provisions .
7A7
MINUTE ORDER NO. 6898
APPROVING CONTRACT CHANGE ORDER NO. 1
TO E.L. YEAGER CONSTRUCTION COMPANY FOR
AN INCREASE OF $74,300, FOR A TOTAL
CONTRACT AMOUNT OF $300,075, FOR THE
CROSSLEY TRACT STREET AND DRAINAGE
IMPROVEMENTS, PHASE 4, CITY PROJECT NO.
00-31.
------------------
I HEREBY CERTIFY that this Minute Order, approving Contract Change Order
No. 1 to E.L. Yeager Construction Company for an increase of $74,300, for a
total contract amount of $300,075, for the Crossley Tract street and drainage
improvements, Phase 4, City Project No. 00-31, was adopted by the City Council
of the City of Palm Springs, California, in a meeting thereof held on the 1st day of
August, 2001.
PATRICIA A. SANDERS
City Clerk