HomeMy WebLinkAbout2/7/2007 - STAFF REPORTS - 2.K. ALM S'6 iy c V N k 44 1:0 CITY COUNCIL STAFF REPORT DATE: February 7, 2007 Consent Agenda SUBJECT: Airport Security Wall — Harbor Construction Change Order NoA FROM: David H. Ready, City Manager BY: City Manager SUMMARY This action would rescind a previous City Council action, taken on December 6, 2006, that gave up to $750,000 in change order authority to the Airport Construction Administrator for new security walls at the airport. Further, this action would approve Change Order No. 4 with Harbor Construction to construct new security walls at the airport for the amount of $1,085,000. RECOMMENDATION: Adopt Resolution No. , rescinding Resolution No. 21784-B and approving Change Order No. 4 to Agreement No. A5257 with Harbor Construction Co., Inc. for the construction of security walls at the Palm Springs International Airport in the amount of $1,085,000, subject to the approval of the Federal Aviation Administration. STAFF ANALYSIS: On December 6, 2006 the City Council took an action to authorize the Airport Construction Administrator to approve a change order for the new security walls at the airport in an amount not to exceed $750,000 (A detailed cost estimate had not been developed at this time.) The special authority was sought to help avoid potential delays to the overall project. Since that approval staff has been working with the contractor to develop a Change Order that covers the construction of the security walls. In that negotiating process several additional changes to the wall system have been identified including the need to develop a grade beam system to carry the wall over an existing critical utility corridor, changing the block to split face on both sides, expanding the length of the wall to incorporate existing mechanical enclosures, adding back two emergency exit gates, adding demolition of some of the aircraft parking ramp that interferes with the wall alignment, and structurally modifying the retaining portion of the wall. Once these changes were determined to be necessary the plans were modified ITEM NO. City Council Staff Report February 7, 2007 - Page 2 Harbor Construction Change Order No. 4 and a new pre quote cost estimate was developed. This estimate included a deduction of ($213,000) for existing walls that have been deleted from the contract. The work to be completed also includes the demolition of the covered walkway and the necessary grading to backfill the walls. The new estimate for the work was completed on January 9, 2007 and set at $1,149,003. The revised plans were provided to the contractor for pricing. On January 16, 2007 the contractor provided a quote of $1,277,816 for the work. The contractor quote included walkway lighting at a cost in excess of the pre- quote estimate, and the contractor was not willing to reduce the price, so that work was removed from this change order process. The deletion of the lighting took the estimate down to $1,050,864 and resulted in a new contractor price of $1,166,747. Staff and the contractor continued to meet and negotiate and have reached a final proposed price of $1,085,000. It is that amount that is recommended for City Council approval in the attached Resolution. This item will go to the Airport Commission on their February 14, 2007 meeting for ratification of any action the City Council may take. This month the Commission changed its meeting date from the first Wednesday of the month to the second and to wait until that meeting and then go to City Council would delay the project two weeks. The Commission was previously advised that many pieces of the overall project were not yet under contract, including this security wall, and that some items rrl yy need to City Council ahead of the Commission review. i FISCAL IMPACT: IFinance Director Review: The Change Order amount of $1,085,000 will be charged to the AIP 38 federal grant, account number 415-6600-56063. On January 17, 2007 the City Council received a report that indicated total funding available from AIP 38 is $1,536,119. Those federal dollars were allocated in the report to cover the cost of the Fire Alarm System, this Security Wall, Courtyard Storm Drain and Project Contingency, as follows: Item Jan 17 allocation Proposed Allocation Fire Alarm $69,963 $85,400 Security Wall 750,000 1,085,000 Storm Drain 110,652 0* Contingency 604,504 364,619 *Note: The storm drain work has been included in the landscape project which will be funded from the $2.5 million in airport dollars that was approved at the last City Council meeting. i City Council Staff Report February 7, 2007 - Page 2 Harbor Construction Chang Order No 4 0 / � Allen F. Smoot, Airport Construction Administrator [avid H. Ready, City Ma Attachments: 1. Resolution 2. Change Order RESOLUTION NO. OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, RESCINDING RESOLUTION N0. 21784-B AND APPROVING CHANGE ORDER NOA TO AGREEMENT NO. A5257 WITH HARBOR CONSTRUCTION CO., INC., IN THE AMOUNT OF $1,085,000, TO CONSTRUCT NEW AIRPORT SECURITY WALLS, SUBJECT TO THE APPROVAL OF THE FEDERAL AVIATION ADMINISTRATION WHEREAS the City Council on December 6, 2006 approved special change order authority for the Airport Construction Administrator to approve a change order with Harbor Construction up to $750,000 for the construction of new security walls; and WHEREAS change order negotiations resulted in discoveries of deficiencies in the Plans and Specifications which resulted in revisions to the plans; and WHEREAS the revised documents were provided to the contractor for pricing and the Airport Construction Administrator developed a pre-quote cost estimate for the project of $1,149,003; and WHEREAS on January 16, 2007 Harbor Construction provided its quote for the work of $1,277,816; and WHEREAS following negotiations the parties have reached a proposed change order amount of$1,085,000. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs as follows: SECTION 1, That Resolution No. 21784-B, which provided special change order authority for the security wall, is hereby rescinded. SECTION 2. That Change Order No. 4 to Agreement No. 5257 with Harbor Construction Co., Inc., in the amount of $1,085,000, to construct new airport security walls, subject to the Federal Aviation Administration approval, is hereby approved. ADOPTED THIS 7th day of February, 2007. David H. Ready, City Manager ATTEST: James Thompson, City Clerk CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF PALM SPRINGS ) I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that Resolution No. is a full, true and correct copy, and was duly adopted at a regular meeting of the City Council of the City of Palm Springs on February 7, 2007, by the following vote: AYES: NOES: ABSENT: ABSTAIN: James Thompson, City Clerk City of Palm Springs, California r CITY OF PALM SPRINGS SECURITY CHECKPOINT PHASE III CONSTRUCTION CHANGE ORDER To: Harbor Construction Co., Inc. Date: February 7, 2007 15550 Rockfield Blvd„ Suite 6-100 Project No. CP05-010 Irvine, CA 9261$ Project Name: Expand Terminal Hold-room (Part 2) Change Order No. 04 Contract Purchase No. 616120 Attn: Steven R. Padula, President Contract No.A5257 Description of Change: Construct new poured-in-place colored concrete and glass security wall on the east side of the new connector walkway and hold-room. Construct new split face masonry retaining and security wall on the west side of the new connector walkway and hold-room. Demolish the existing covered walkway structure between W-1 and W-6 plus. Site/landscape demolition and grading to allow for the construction of the walls and backfilling of the walls. Electrical exit signage conduit and cabling and security conduits at the exterior gates. The work mentioned herein is based upon Harbor Construction's cost proposal #14 Revised, including proposal qualifications, dated January 29, 2007 as well as Landscape/Security Wall drawings prepared by Michael Buccino Associates dated December 22, 2006, contract drawings by Gensler Architects, and letter from the City of Palm Springs dated January 3, 2007 to the extent the letter does not conflict with Harbor's proposal and qualifications. The performance of this work will not be subject to the liquidated damages clause of the Hold-room Project contract. TOTAL CHANGE ORDER PRICE -ADD- 1 085 000.00 Summa of Cost✓Time Original Contract Price $ 9,278,000.00 Total of all Previous Change Orders $ -695,383.00 Total of this Change Order $ 1,085,000.00 Total Contract Price $ 9,667,617.00 This Change Order(rasreases){deerease r) (unchanged) the contract time by 0 working days. Page 1 of I have received a copy of this Change Order Construction Administrator and the above AGREED PRICES are acceptable Approval Date: to the contractor. By. Aviation Department Approval: Title: Approved by Date: Date, Airport Construction Administrator City Approval Date: City Clerk Date. City Manager Distribution: Original Conformed Copies Conformed - File Copy City Clerk (1) Contractor (1) Procurement& Contracting (1) FAA (1) Finance (1) Airport File (1) Page 2 of 2