HomeMy WebLinkAbout7/5/2001 - STAFF REPORTS (6) a DATE July 5, 2001 TO: City Council FROM: Interim Director of Aviation TAXIWAY "W" REHABILITATION - CHANGE ORDER #1 RECOMMENDATION: It is recommended that the City Council approve Change Order#1 (subject to FAA approval)to agreement#4347 with E.L. Yeager Construction, Inc. for safety area soil stabilization improvements in the amount of $737,800. SUMMARY: Million Air, the Fixed Base Operator (FBO) on the east side of the Airport has expressed concerns over soil erosion adjacent to theirfacility. Staff has been working with Million Air and the Federal Aviation Administration (FAA)for quite some time, and the FAA has recently allocated Airport Improvement Program (AIP)funds to complete this work. This change order with an existing contractor would allow the work to be completed by the end of the year. BACKGROUND: Over the past several years, soil stabilization has been an essential work item of several AIP projects. By grading and installing medium coarse rock, the amount of dust generated at the Airport has been reduced significantly. Also, the amount of weed growth and wildlife habitat within the critical safety areas of the Airport has been reduced. This same rock material will be applied to the area adjacent to Million Air, which will provide the same benefits that have been realized in other areas of the Airport. By utilizing an existing contractor already working on the Airport, the overall cost can be reduced by the elimination of move-in and security, which has already taken place with the taxiway "W" rehabilitation. The price of$737,800 has been negotiated with E.L. Yeager Construction based on unit cost values. 634 TAXIWAY "W" REHABILITATION - CHANGE ORDER #1 July 5, 2001 Page Number 2 Funding for this work has been provided for in the recently approved AIP-33 grant from the FAA. The grant has been authorized and will be received in the near future, at which time an offsetting budget amendment will be utilized to place the project in the budget. DW W- TkLLEN F sMObT, A.A.E. Interim Director of Aviation APPROVED�'�`� ✓iT��_�y�� City Manage Attachment: Minute Order Change Order N\WordPerfect\City_Council\EL Yeager Twy_W CO-1 wpd REVIEWED BY DE�PL OF FINANCE `!P, J4 Z CHANGE ORDER NO. 1 PROJECT TITLE: REHABILITATION OF TAXIWAY"W" Schedule 11-Runway "13L/31R"Safety Area Stabilization CITY PROJECT NO. CP2000-34 FAA All'PROJECT NOS. 3-06-0181-28,-30,-33 CONTRACT DATE: March 7,2001 CONTRACTOR: E.L. Yeager Construction Company,Inc. The following changes are hereby made to the Contract Documents: 1. Add:Schedule H Runway"13L/31R'Safety Area Stabilization,See Exhibit I,attached. Justification: 1. This project will complete the safety area stabilization of all runway approaches at the Airport. The approaches will be cleared of existing brush and graded to accommodate drainage then the area will be covered with crushed aggregate to stabilize the surface. CHANGE TO CONTRACT PRICE Original Contract Price: $5,049,966.00 Current Contract Price,as adjusted by previous change orders: $5,049,966.00 The Contract Price due to this Change Order will be increased by $737,800.00 The new Contract Price due to this Change Order will be: $5,787,766.00 CHANGE TO CONTRACT TIME The Contract Time will be increased by 0 calendar days. The date for completion of all Schedule Il work under the contract will be October 1,2001. Approvals Required: To be effective,this order must be approved by the Sponsor and the FAA if it changes the scope of the objective of the project or as may othenvisOw •e aired under the terms of the Contract Documents. Requested by ' date t C'l 01 Mr. n✓Qmoot n i/n Director of Aviation Recommended by vv' �a�i�- 't/ date r.Rodger Sheraton,Consolidated E&C Ordered by date City of Palm Springs Accepted by date E.L.Yeager Construction Company,Inc. Approved by the FAA date 3 43 EXLIIBIT I SCHEDULE II Runway"13LI31R"Safety Area Stabilization Item No. Description Unit Estimated Amount Quantity P-100 Mobilization at the unit price of ,r=/�� _ dollars and 00cents L.S. 1 $ ($ ��• 0 )per lump sum P-140 Asphalt Removal(excludes roto-mill tailings)at the unit price of ✓s dollars and 4Pcents S.Y. 50 S — ($ /Z, eo )per square yard P-151 Clearing and Grubbing at the unit price of mvr/71E 21W2r.O 'lu XZ rjl �nS�co dollars and cents L.S. 1 S ($ /26,O� , oo )per lump sum P-152 Unclassified Excavation at the unit price of dollars and a'Dcents C.Y. 19,500 $ 23oev _ ($ /Z , &a per cubic yard P-217 Soil Sterilization at the unit price of �E2d dollars and /O cents S.Y. 112,500 $ ($ O. /a )per square yard P-218 Crushed Aggregate Shoulder and Slope Protection at the unit price of dollars and cents Ton 20,000 $ ($ per ton D-701a Remove 30"x 42" CMP ARCH End Sections dollars and eV cents Ea. 6 $ ($ Ofl .0)per each D-701b Extend 30"x 42" CAP Arch pvf, dollars and eV cents L.F. 120 $ ($ per lineal foot 3 *4� EXHIBIT I D-701 c Install New 30"x 42" CMP Arch End Sections dollars and scents Ea. 6 $ T ' ($ �2.� )per each D-701d Cleanout Existing 30"x 42" CMP Arch-Entire Lengths,Inlets and Outfalls �,ttic✓ i id�A co dollarsan&Vicents Ea. 6 $ `714 OL->a ($ 7 0M9 , d4)per each D-70le Remove and Replace(Damaged)Existing 30"x 42" CMP Arch Bti''r ,�ia'dAizt D „�r��✓ dollars and OVcents ($ //;F.a'o)per lineal foot L.F. 50 $ S�� SCHEDULE If TOTAL ESTIMATED COST $ Conditions: 1. All construction shall be performed in accordance with the contract documents. 2. The airport will encourage Million Air F.B.O. to cooperate in the construction process, i.e. use of hydrants and piping access, staging area,perimeter gate access and crossing ramp. 3. P-152 Unclassified Excavation (including existing roto-mill tailings and P-218 pock) is intended to balance among the areas of work. However, should export be required the excess materials will be disposed off-site in accordance with the contract documents. 4. D-701e Cleanout Existing 30" x 42" CMP Arch - Entire Lengths, Inlets and Outfalls intent is to deanout completely all six Corrugated Metal Arch Pipes. Remove all sand, dirt, debris and blockages. 5. Dust Control is required in accordance with the contract documents. 6. A SWPPP plan is required in accordance with P-153. 7. Runway"13L/31R'will be closed for work in the Runway Safety Area. 8. Taxiways and Ramps surrounding the work areas will be active during construction. The Contractor shall be required to have a radio-equipped flagman present during all work within the taxiway safety areas. 3#4s rLL �j MINUTE ORDER NO. 6874 APPROVING CHANGE ORDER #1 (SUBJECT TO FAA APPROVAL) TO AGREEMENT NO. 4347 WITH E.L. YEAGER CONSTRUCTION, INC. FOR SAFETY AREA SOIL STABILIZATION IMPROVEMENTS, IN THE AMOUNT OF $737,800. ------------------ I HEREBY CERTIFY that this Minute Order, approving Change Order #1 (subject to FAA approval) to Agreement No. 4347 with E.L. Yeager Construction, Inc. for safety area soil stabilization improvement, in the amount of $737,800, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 5th day of July, 2001. PATRICIA A. SANDERS City Clerk