04`1POIL p CITY COUNCIL STAFF REPORT
DATE: December 6, 2006 New Business
SUBJECT: SUPPLEMENTAL REPORT— ITEM 56
FROM: David H. Ready, City Manager
BY: Department of Aviation
SUMMARY
This action would authorize the City Construction Project Administrator to finalize
negotiations with Harbor Construction for Demolition/Security Wall/Grading
improvements at the Airport Hold-room Project Small Courtyard and Connector
Walkway.
RECOMMENDATION:
Adopt Resolution No. , authorizing the City Construction Project Administrator
to finalize negotiations and approve Change Order No. 2 for the New Hold-room
Courtyard Yard and Connector Walkway demolition/security wall/grading
improvements, Agreement No. A5257, with Harbor Construction Co., Inc., in amount
not to exceed $750,000, and report back to City Council at the conclusion of the
process.
STAFF ANALYSIS:
As reported in the original staff report an effort has been underway to try and receive
three separate quotes from Harbor Construction for landscape/site work at the Airport
Terminal Courtyards. The project is quite detailed and as such there was not enough
time to reach a final conclusion with the contractor on all three quotes. The proposal
received leads staff to believe that there may be funding issues in order to cover all
three separate areas of the project. Because of potential funding problems with the
larger project it is recommended that the focus now be on completing the work
necessary for the new terminal to be able to be utilized when completed. The Change
Order proposed will cover the demolition of the remaining covered walkway from the
existing terminal area to the new Hold-room (passengers will then depend on trees for
protection from the elements) as well as necessary grading work and the installation of
new security wall; split face masonry on the west, facing the back-of-house, and glass
.%�onTA� w 'wla�
��X" 6B
City Council Staff Report
December 6, 2006 - Page 2
Supplemental Report-Item 5c
facing to the east. All of this work should be able to be completed for less than
$750,000. The remaining flat work and landscaping will be brought back at a later time,
Timing is very important on the approval of a Change Order so as to avoid the
potentials for delay claims from the contractor. It is for this reason that staff
recommends City Council authorize the Construction Project Administrator to finalize
the negotiations and approve a Change Order for the New Hold-room Courtyard and
Connector Walkway areas only. Once this effort is complete staff will report back to
City Council. This direction should result in the contractor beginning the necessary
construction work in a reasonable sequence no later than the beginning of the year.
FISCAL IMPACT: Finance Director Review:
The limitations on the Change Order can be fully funded from existing Federal Grants.
Allen F. Smoot, Construction Project Administrator
David H. Ready, City ana
Attachments:
Resolution
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE
CITY OF PALM SPRINGS, CALIFORNIA,
AUTHORIZING THE CITY CONSTRUCTION
PROJECT ADMINISTRATOR TO FINALIZE
NEGOTIATIONS WITH HARBOR CONSTRUCTION
AND APPROVE CHANGE ORDER NO. 2 TO
AGREEMENT A5257 FOR DEMOLITION/SECURITY
WALL/GRADING IMPROVEMENTS AT THE
AIRPORT NEW HOLD-ROOM COURTYARD AND
CONNECTOR WALKWAY IN AN AMOUNT NOT TO
EXCEED $750,000, AND TO REPORT BACK TO
CITY COUNCIL AT A REGULAR MEETING.
WHEREAS, the City Construction Project Administrator has been working with
the contractor on the Airport New Hold-room project, Harbor Construction, to
come to agreement on a second change order that would authorize security
wall/landscape/site improvements in three areas of the Airport Terminal; and
WHEREAS, to avoid the potential for delay claims from the contractor it is vent'
important that direction be received from City Council at the December 6, 2006
regular meeting; and
WHEREAS, due to the complicated nature of the proposed additional work there
has not been adequate time to finalize pricing for the project; the negotiations
that have been accomplished are revealing that overall cost will exceed the
current budget allocations for the project; and
WHEREAS, the most important portion of the proposed work is the courtyard
directly in front of the New Hold-rooms and the Connector Walkway; these areas
must be completed to allow passenger access to the new facility; and
THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY
RESOLVE AS FOLLOWS:
SECTION 1. That the City Construction Project Administrator is hereby
authorized to finalize negotiations with Harbor Construction for the
demolition/security wall/grading improvements necessary to complete the
courtyard area directly in front of the Airport New Hold-rooms and the Connector
Walkway; and
SECTION 2. That the City Construction Project Administrator is authorized to
take the final negotiations with Harbor Construction and approve Change Order
No 2 to Agreement A5257 in an amount not to exceed $750,000, and
SECTION 3. That the City Construction Project Administrator is directed to
report back to City Council at a regular meeting with the final pricing of the
Change Order.
ASOPTED THIS 6"' day of December, 2006.
David H. Ready, City Manager
ATTEST:
James Thompson, City Clerk
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF PALM SPRINGS )
I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that
Resolution No. is a full, true and correct copy, and was duly adopted at
a regular meeting of the City Council of the City of Palm Springs on December 6,
2006, by the following vote.
AYES:
NOES:
ABSENT:
ABSTAIN:
James Thompson, City Clerk
City of Palm Springs, California
•lam?A LAt S,p
.y
u` ,n
n
C9<IFOP*' CITY COUNCIL STAFF REPORT
DATE; December 6, 2006 New Business
SUBJECT: AIRPORT COURTYARD LANDSCAPING — HARBOR CONSTRUCTION
CHANGE ORDER NO. 2. AND STAFF AUTHORIZATION FOR CHANGE
ORDERS
FROM: David H. Ready, City Manager
BY: Department of Aviation
SUMMARY
This action would approve a Change Order with Harbor Construction to carry out the
landscape/site work for the airport terminal building courtyards.
RECOMMENDATION:
Adopt Minute Order No. , approving Change Order No. 2, option to
Agreement No. A5257 with Harbor Construction Co., Inc., in the amount of
,$ for landscape/site work in the airport terminal building courtyards.
STAFF ANALYSIS:
Several months , back the City Council approved Agreement A5257 with Harbor
Construction for the development of a new regional jet boarding facility (Hold-rooms).
Due to the uncertainty from the Federal Government on grant funding levels the project
was initiated as a building only and did not include the landscape/site work necessary
for the facility to open.
Landscape/site improvement plans have been developed by Michael Buccino &
Associates for the Main Terminal Courtyard, the Connector Walkway and the New Hold-
room Courtyard (See attached 8 'Y2 X 11 drawing). To provide flexibility in making a
recommendation for City Council consideration staff has asked the contractor to provide
three separate quotes, one for each of the distinctive areas outlined on the plans.
A description of the work in the three options is as follows:
A. MAIN TERMINAL COURTYARD: Demolish the two temporary Hold-room facilities,
the covered walkways between the main terminal and the Sonny Bono Concourse,
ITEM NO.. � —
City Council Staff Report
December 6, 2006 -- Page 2
Harbor Change Order#2
existing site work and landscaping. Replace this with a new courtyard hardscape and
landscape plan to include a large water feature near the entry to the main terminal.
B. CONNECTOR WALKWAY: Demolish the existing covered walkway, site work and
landscaping. Construct new security walls along the edge of the aircraft apron and
install new landscaping.
C. NEW HOLD-ROOM COURTYARD. Realign the security walls, construct new
hardscape and landscape to include a water feature and night lighting.
The highest priority of work is the New Hold-room Courtyard as it is required to be
completed before passengers could safely access the new facilities. If this was the only
option selected there would also need to be some a minor amount of site and landscape
work completed at the north end of the connector walkway.
Harbor Construction has priced the work options as follows:
A. Main Terminal Courtyard $
Deduct Water Feature ($ )
Deduct Cobbled Mow Strip ($ )
B. Connector Walkway $
Deduct Security Wall Grade ($ )
C. New Hold-room Courtyard $
Deduct Water Feature ($ )
Deduct Security Wall Grade ($ )
Staff recommends that City Council approve Change Order No. 2 to be Option
FISCAL IMPACT: Finance Director Review:
Funding for this work will come from Federal Aviation Airport Improvement Grant 38
and from airport funds. The AIP 38 funds that remain available for this project total $1
million. The airport has approximately $5.5 million of its own funds from which the
current five year Airport Capital Improvement Plan needs of $3.5 million must be
subtracted, leaving $2 million available for this project.
F
N^
Richard Walsh, AAE, Director of Aviation Allen Smoot, AAE, Propbct Administrator
City Council Staff Report
[December 6, 2006 -- Page 3
Harbor Change Order#2
David H. Ready, City Mana
Attachments:
1. Minute Order
2. Drawing
KEY RO7ES
[
f]:Y i•r"�
_ � Palm Springs - '
_ In[emaiioual AaporL �� S� � ;.
C,0LO"r
NEW CNu AND GLASS WALL(9E o--�� _ -_ +' ,- p(3' • �l,.\\.. _
YVP NEh CBN AND GLASS WALL I9FT)"'F 'F .i • "" >
NEW CMll AND GLASS ALL 49Fn _ i `!In •
IN
NEY LMY AND GLASS WALL 49M
ll
2—
F---
Ni mc151]A,l'D GLAh�W^ALL{�9F7)
I �
" •• r � � � ����—�-_ SHEET NOTES
�s :. �, 4 uslu_I: vavn
KEY PLAN
' APPROVED BY: 1-14 1
MR.JAMES SPINDEN
PSP,FED ERAL SECURITY 131 RECTOR - l
OVERALL CONSTRU_CTI ON ZONE PLAN "®
ATTACHMENT-I'