Loading...
HomeMy WebLinkAbout11/1/2006 - STAFF REPORTS - 5.D.a NLM City Council Staff Report NOVEMBER 1, 2006 NEW BUSINESS Subject: AWARD OF CONTRACT FOR THE 2006/007 ANNUAL SLURRY SEAL, CITY PROJECT 06-13 From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY The Public Works and Engineering Department schedules an annual slurry seal of various City streets. It is intended that every City street receive a slurry seal approximately every 5 to 7 years. Award of this contract will allow staff to proceed with this annual street maintenance program. RECOMMENDATION. 1) Adopt Minute Order No. "APPROVING AGREEMENT NO. IN THE INC, AMOUNT OF $689,434.47 WITH BOND BLACKTOP, FOR BID SCHEDULES A THROUGH E (INCLUSIVE), FOR THE 2006/2007 ANNUAL SLURRY SEAL, CITY PROJECT 06-13;" and 2) Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: The Public Works Department oversees the maintenance of the City's street system. Each year, the Department assembles a capital project to continue its Slurry Seal Program on various City streets. This year's slurry seal program, is scheduled to include all of the streets within Section 20 (the commercial/industrial area near Lowe's and Wal-Mart), Section 29 (residential area near East Palm Canyon Drive and Golf Club Drive), and Section 35 (residential area of south Palm Springs along Bogert Trail). Additionally, we are scheduling a slurry seal of Sunrise Way from Ramon Road to Alejo Road; and Mesquite Avenue from El Cielo Road to El Placer, and from Vella Road to Gene Autry Trail. This project will schedule slurry seal of approximately 3,700,000 square feet of City streets this year. City Council Staff Report November 1, 2006 - Page 2 2006/2007 Slurry Seal (CP 06-13) The plans and specifications were prepared by Department staff, and on, September 6, 2006, the City Council approved the plans and specifications and authorized construction bidding. On September 12 and 19, 2006, the project was advertised for bids, and at 2:00 p.m. on October 10, 2006, the Procurement and Contracting Division received construction bids from the following contractors. 1. Valley Slurry Seal Co.; West Sacramento, CA 2, Pavement Coatings Co.; Cypress, CA 3. Bond Blacktop, Inc.; Union City, CA 4. American Asphalt South, Inc.; Fontana, CA Refer to Attachment 1 for the Bid Summary. The Engineer's Estimate was $124,432 for Bid Schedule A; $117,102 for Bid Schedule B; $269,521 for Bid Schedule C; $76,626 for Bid Schedule D; and $34,761 for Bid Schedule E; for a total estimate of $622,441. The low bid was submitted by Bond Blacktop, Inc. The company is a California corporation, and its p incipal off- er is Edward Dillon, President/Secretary- FISCAL IMPACT: IFinance Director Review: Funding for this project is available through local Measure U/q revenue, in an account budgeted as part of the 2006/2007 capital improvement project, account 134-4498 60100 (Slurry Seal), and through Congestion Relief Funds, in accounts 133-4298-50255 (Traffic Cong Relief 04-05) and 133-4298-50256 (Traffic Cong Relief 03-04). David J. Barakian Thomas J. Wil n Director of Public Works/City Engineer Assistant City anager David H. Ready, City ger ATTACHMENTS: 1. Bid Summary 2. Minute Order 2000/2007 ANNUAL SLURRY SEAL Day Prowci 00-13 BID SUMMARY OlA Scll�OuloA -,It, almry eGM bo nm""0""1"G. ^ene umcxmP Inc wm on paynmlevunr Inc. o L lu ll'Ex DESCRIPTION QUANTITY UNIT UNIT PRICE TOTAL UNIT PRICE TOTAL UNIT PRICE TO fn, UNIY vl1¢r TOTAL IRD N vllw ,rvlviPub _ •IcTyi t n•p npn uF : 0270 5131 p:G 20 G102 ',1 OR, ni 0TIA OR D7. to ovon SO, a - RI IN IJIN,r`O wN11 n GNII — 1 i,,, i. rLNX u A i 9220n) aF .n•I ou/o SIG' ee3 nu um -D IS, 0a DRUG GG4 DID 'IUU au m ad FPirr rn ,•._-••. •,.•.-.•, D2-zpDn SIII zeG 11 vin u•s} 'IS,C Tay � ble cceveule u mmy. Itta'a.vl I. em mvNI, Co nlvc c - -n xl.P'IYAL Acve NPIR m BIDITEN RNTl Irl upIT PRICEY Toin� UNIT PRICE OTAL TOTAL UNIT N.ICC rvlT Pm[mvtlenr e TOTAL ' t IRB]0] .1 C22u S1 GO 13S GA 0,57 S111 J2J GD D1BJ -"a US' DO 0III 9111 BB1)G ,'N T n— Wirl'v s15013'r GA 42400 i11Ga3% 0G 3AN B01.TG - plO u'cM111IIN uncy alucr/avaro vd _i111 emm�l uv vv v0olwl. none nlvcxlepTOTwL Cv A�pn.nnu..n lqc m IY[x PESCRIPI ION QUANTITY UNIT urvlT Vlm[eY TOTAL VrvlY vv¢e ..It va¢G VrvlT vlv¢pc TOTAL y urr,, •n . t 11e0100 SF uup S:Sv)e, uu pvv s9e era tp oven .teu.lu eo titan S107U.e So 11.7 vun. n — �TGN.A •afnu c• F[na ILI' • 3J05] :f 0510 •fnn l) 0:)0 T0725050 D200 TID1ago 13 p2000 SBO I4710 snsp S,, 7 s27213100 S2010215, 425007 00 nlescn.D.r p Valley.luny:..... — Yvacme L..min0v [e enemy xbp Inc —I... A.,I.I vmn Inc BIO ITEN 11. N qunryTNI UNIT UNIT PRICE I TOTAL UNIT PIUCS TOTAL UNIT vmq TOTAL UNIT PRICE TOTAL ce • F d.l..N IINJ bIaTHI I,,n'III revl ..Ieueo 1 enmc cm.mn lecwemp 340500 SF n"I 114n nnn nn n... 5119 471 T: a200 1-'70: AO OID] SIDI IeGK ITT, -I •''NnI •m I' lmne t. ve,n cnln. svx nnP np snn yl 5z iu 7111 I su11.n 32 Y e Icn.IPTI Vallay'JwlY e.w L. - P.ITI ...U., C. _ ma nlucu.PT-` 10.11 w.Pe..t 311 my QUANTITY UNIT pw, UNIT PRICE TOTAL UNIT PRI[0 TOTAL UNITY VAI[v UNIT vfnAID .11 TOTALS Nve I".' n'r 1LIF ZU Incmeln[ ••WrOt mAc mlNrC v54 n/n PN 0510 sm )FI F1 0342 SZ 03G 05 OIDO SAA 00320 p33n sSz nz Dz r'1 1r IT BI •_ ne n.m IT _crm 5707010II sf usnua lw nm.:u iS. tONRL 01' ALL nIP'cU[DULES SIT m. aaam SMS 10.2J snn-IJy PI y300 MINUTE ORDER NO, APPROVING AGREEMENT NO. IN THE AMOUNT OF $689,434.47 WITH BOND BLACKTOP, INC., FOR BID SCHEDULES A THROUGH E (INCLUSIVE), FOR THE 2006/2007 ANNUAL SLURRY SEAL, CITY PROJECT 06-13 I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that this Minute Order approving Agreement No. in the amount of $689,434.47 with Bond Blacktop, Inc., for Bid Schedules A through E (inclusive), for the 2006/2007 Annual Slurry Seal, City Project 06-13, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 1st day of November, 2006. James Thompson, City Clerk