Loading...
HomeMy WebLinkAbout10/4/2006 - STAFF REPORTS - 2.F.DATE. October 4, 2006 City Council Staff Report CONSENT CALENDAR SUBJECT: AMENDMENT NO. 9 TO VSA AIRPORTS AGREEMENT FOR AIRPORT DESIGN AND ENGINEERING SERVICES FROM: David H. Ready, City Manager BY: Department of Aviation SUMMARY Amendment No. 9 will authorize the Engineer to complete design and engineering work required to install security and public flight information systems in the new Regional Jet Terminal. RECOMMENDATION: 1. Approve Minute Order No. authorizing Amendment No. 9 to Agreement No. A-4487 with VSA Airports, Inc. to provide design and engineering services for security and public information display enhancements for the new Regional Jet Terminal in the amount of $47,000, FAA AIP Project No. 3-06-0181-37. 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: The Regional Jet Terminal is currently under construction, once completed it will provide parking for up to eight regional size jet commercial aircraft. To provide the required security access control and surveillance systems, and the public information flight display system, design and engineering work to prepare for the installation of these systems must be accomplished. Amendment No. 9 to the VSA contract will accomplish this. The engineer's estimate to install the security and flight information systems is $250,000. These costs are eligible for 95% cost recovery under current FAA AIP Grant No. 37. ITEM NO. Z . F" City Council Staff Report October 4, 2006 -- Page 2 Amendment No. 9 — VSA Airports, Inc. The Airport Commission approved recommending that the Council approve Amendment No. 9 to the VSA engineering contract. v FISCAL IMPACT: IFinance Director Review: The Airport's 5% share of A endment No. 9 has been funded in the current budget. Richard S. Walsh, A.A.E., Director of Aviation David H. Ready, sty ager Attachment: Amendment No. 9 to the VSA Agreement Minute Order MINUTE ORDER NO. APPROVING AMENDMENT NO. 9 TO AGREEMENT NO. A4487 WITH VSA AIRPORT, INC. IN THE AMOUNT OF $47,000, TO PROVIDE AIRPORT DESIGN AND ENGINEERING SERVICES FOR SECURITY AND PUBLIC INFORMATION DISPLAY ENHANCEMENTS FOR THE NEW REGIONAL JET TERMINAL, FAA AIP PROJECT NO. 3-06-0181- 37. A4487. I JAMES THOMPSON, City Clerk of the City of Palm Springs, California, hereby certify that this Minute Order, approving Amendment No. 9 to Agreement No. A4487 with VSA Airports, Inc. in the amount of $47,000, to provide design and engineering services for security and public information display enhancements for the new Regional Jet Terminal, FAA AIP Project No. 3-06-0181-37, was approved by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 4th day of October, 2006. JAMES THOMPSON, City Clerk City of Palm Springs, California AMENDMENT#9 AGREEMENT NO, 4487, AIRPORT ENGINEERING SERVICES THIS NINETH AMENDMENT TO AGREEMENT NO_ 4487 FOR CONTRACT SERVICES, (herein "Amendments is made and entered into on the day of 2006, by and between the CITY OF PALM SPRINGS (herein "City') and VSA AIRPORTS; Inc. (herein "Contractor'). (The term Contractor includes professionals performing in a consulting capacity.), is hereby effective 2006 as follows: RECITALS A. The City and Contractor entered into that certain Contract Services Agreement No. 4487 for Airport Engineering Services ("Agreement's, as duly amended from time to time- B. The parties wish to amend the Agreement pursuant to the terms of this Amendment to add additional services to be performed by Contractor and increase the Contract Sum to authorize payment for such additional services. NOW, THEREFORE, the parties hereto agree as follows: Section 1: Section 2.1 of the Agreement entitled "Contract Sum' shall be amended as to the reference to the Contract Sum to include the fees added with this Amendment, as described in the revision to Exhibit "C' below (for $47,000.00), so that the revised Contract Sum shall read "Three Million Five Hundred Sixty Seven Thousand and 001100 Dollars ($3,567,000.00)", with all other provisions of Section 2.1 remaining unmodified and in full force and effect. Section 3: Exhibit "A" Scope of Services, Part V — Project Specific Scopes, is hereby amended by adding Project No. 1 a, with all other provisions of Exhibit "A" remaining unmodified and in full force and effect: P ]ProfectTrtle7,pesciip(ion .Task 9iiiwagn&- Access Control System Replacement a. System expansion for New Commuter Terminal A, G, K 'Tasks as defined in the original contract Section 4: Exhibit "C" Schedule of Compensation, Part 11 — Project Specific Compensations is hereby amended by adding Project No. la, with all other provisions of Exhibit "C" remaining unmodified and in full force and effect: P„rojec,',_'L',°Projecf,T/fje / pesarFp6ori Compensation. (Not To,Euceed) ' 1 Access Control System Replacement a. System expansion for New Commuter Terminal $47,000.00 (ahibit C-1 Breakdown attached) Section 5: Exhibit I'D" Schedule of Performance is hereby amended by adding the dates for Project No. ia, with all other provisions of Exhibit "D" remaining unmodified and in full force and effect: VSA AIRPORTS, Inc.. Agreement 4487, Amendment F9 projects; ; Project Title/DescripGon Commence, Complete Access Control System Replacement a. System expansion for New Commuter Terminal Sep.18, 2006 April 30, 2007 Section 6: Full Force and Effect_ Except as expressly modified herein all other provisions of the Agreement shall remain unmodified and in full force and effect. Section 7. Coroorate Authority_ The persons executing this Amendment on behalf of the parties hereto warrant that O such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment on behalf of said part, (ii) by so executing this Amendment, such party is formally bound to the provisions of this Amendment, and (iv) the entering into this Amendment does not violate any provision of any other agreement to which said party is bound. (Signature Page Follows) V5A AIRPORTS, Ina. Agreoment 4457, Amendment 99 IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above. ryi1*11 35 City Clerk APPROVED AS TO FORM: By City Attorney CONTRACTOR: Checks one: By: CITY OF PALM SPRING a municipal corporation City Manager Individual —Partnership Corporation Corporations require two notarized signatures: One from each of the following: A, Chairman of Board, President, or Vice PreWent AND B. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer, or Chief Fi ncia O Y y Si�aturree (notarized Signature (nota'rized) ~ Name: /�v�GI�YY�'��[T�u Name: �7✓✓ JICI hl 2.1r^ Title: Title: Sec: 1%/eerS. State of Kam/ GcIle State of C•'cj 1v r • ck• County Onbefore men Yc,o \o �IL i a� g personally appeared Q�X L, n 7 cr y 7 parscp2ity4etorlo rrie (or proved to me on the basis of satisfactory evidence) to be the person(&) whose name(&) isfafe subscribed to the within instrument and acknowledged to me that he/s1 edhey executed the same in his/heFRheir authorized capacity(4es), and that by his/herAheWs;ignatures(s)on the instrument the person(&); or entity upon behalf of which the person(4aeted, executed the Instrument. County of fi .G'cvhC'i2 On before m??ee�. c }F� iL r.AFAL personally appeared �Ctllid N. _ O rack _ personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s) whose name(s) is/are subscribed to the within instrument and acknowledged to me that hefshe/they executed the same in histherAheir authorized capacity(ies), and that by hisfher/their signatures(s) on the instrument the person(s), or entity upon behalf of which the person(s) acted, executed the instrument. WITNESS my hand and official seal WITNESS my hand and official -seal. - Notary SignaturaLL. M c� Notary Signature.�J: kda" Notary Seal: SMPHANIE F. TEELE Commission i 1597336 6M1V Notary Public - Coli amla San lernordino County Comm. Expires Ad 25, 20091 VSAAIRPORTS• Inc., Agraarr ni 4487•Am ndnwnt*9 Notary Seal: o` Amendment #9 Agreement No. 4487, Airport Engineering Services Exhibit C-1 Compensation Table Project: 1a, Access Control System Replacement - System expansion for New Commuter Terminal Task Project Task Description Type Amount Amount A Preliminary Design Fixed Fee 5,000,00 G Security Design f Bid Package Fixed Fee 27,000-00 K Field Engineering T&E 1') 15,000-00 47,000-00 1.) Time & Expenw - Not To Exceed