CONVENTION CENTER PROJECT — RESTROOM REMODEL
David H. Ready, City Manager
City Manager — Convention Center
SUMMARY
This action would approve a Change Order with Doug Wall Construction, Inc., the
Convention Center Kitchen contractor to complete a remodel of the two main restrooms
in the convention center.
RECOMMENDATION:
1. Adopt Minute Order No. , approving Change Order No. 2 to
Agreement #5253 with Doug Wall Construction, Inc., for the remodel of the two
main restrooms at the Convention Center, in the amount of $156,763.78,
r0"Illr_IaWaar_a►T10163
One of the remaining high priority refurbishing items at the Convention Center is the
restrooms. Five (5) restrooms remain with a need for remodeling. The cost of
remodeling all five restrooms far exceeds the available dollars.
The center is entering a very busy period now and has one large window of opportunity
between Thanksgiving and New Years to accomplish a restroom remodel project. To
meet that window, a contractor needs to begin to order parts and pieces in the very near
future. The only way to meet the window and stay within the bounds of the procurement
ordinance is to negotiate a change order with the contractor that is currently on site
completing the kitchen project; Doug Wall Construction.
The work to be completed includes new tile, new fixtures, new counter tops and new
toilet partitions. The "Wish List' estimate previously provided the City Council for this
ITEM M � �
City Council Staff Report
October 1, 2006 Page 2
Convention Center Project Restroom Remodel
project was $160,000 plus soft costs. Staff met with Doug Wall Construction and
negotiated a change order in the amount of $156,763.78 to remodel the two main
restrooms during the holiday window.
FISCAL IMPACT: IFinance Director Review:
Funds are currently budgeted in the unallocated capital account of the Convention
Center to cover the full cost of the work; 261-1395-63565.
Allen F. Smoot, Project Administrator
David H. Ready, City Mar -
Attachments:
Minute Order
Change Order
City Council Staff Report
October 1, 2006 Page 3
Convention Center Project Restroom Remodel
MINUTE ORDER NO.
APPROVING CHANGE ORDER NO. 2 TO
AGREEMENT NO. 5253, IN THE AMOUNT OF
$156,763.78, WITH DOUG WALL
CONSTRUCTION, INC. TO REMODEL TWO
MAIN RESTROOMS IN THE CONVENTION
CENTER.
I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that this
Minute Order approving Change Order No. 2 to Agreement No. 5253 in the amount of
$156,763.78 with Doug Wall Construction, Inc. to remodel two main restrooms in the
Convention Center was adopted by the City Council of the City of Palm Springs,
California, in a meeting thereof held on the 4th day of October, 2006.
James Thompson, City Clerk
CITY OF PALM SPRINGS
CONTRACT CHANGE ORDER
To: Doug Wall Construction, Inc Date: 9/20/2006
Project No. 02-27A
Project Name: Convention Center Kitchen
Change Order No. 2
Attn: Mike Glenn Contract Purchase No. 616114
Account Number: 261-1395-63565
Agr.# 5253
M.O.# 7855 Res. #
A. CHANGES IN WORK: Remodel of the main hallway restrooms at the Convention Center. See
attached SCOPE OF WORK.
B. CHANGES IN COST: See attached quote from Doug Wall Construction.
C. REASONS FOR CHANGES: The next highest priority for remodel at the Convention Center is the
remodel of the existing restrooms. There are not enough dollars available to do all five (5) remaining
restrooms. Time is of the essence as a window of 6 weeks exists between Thanksgiving and New
Years to accomplish this work and Doug Wall is the available on -site contractor.
D. SOURCE OF FUNDS: Convention Center Capital.
Funds are available in Account No. 261-1395-63565
Summary of Costs
Contract Time
Original Contract Amount: $809,000.00
Original Completion Date:
Sept 30, 2006
This Change Order: $ISe,7b3.7g
Days Added for this C.C.O.:
- GI Cc V.P
Previous Change Order(s): $ 33,919.44
Previous Days Added: -
Revised Contract Amount: $Re(q,6s3?'2.-L
Revised Completion Date:
December 31 2006
1 have received a copy of this Change
City Approval:
Order and the above AGREED PRICES
'5f'
12-C 1
are acceptable to the contractor. Submitted
by: cv 7
Date q
C(d
Approved by: _Date
Date Approved by: Date
Attest By: Date
City Clerk
CONVENTION CENTER RESTROOM REMODEL SCOPE OF NVORK
Change Order m2 - Agreement # 5253
The scope of this Change Order covers the remodel of the main Convention Center
restrooms; main concourse between Alcove 602 and 603. The project is to be completed
between November 20, 2006 and December 31, 2006. All surfaces, colors and fixtures to
snatch those in the new main Convention Center Restrooms off the Pre -function area.
1. Demolition: Demolish all tile, restroom partitions, counter tops and lavatories,
and mirrors. If necessary of work remove for reuse -- toilets. Leave urinals in -
place.
2. Retile the floor with SpecCerarnics Techno Quartz Doral 12 X 12 and 12 x 24.
Patch wall tile as necessary.
3. Provide and install new counter top steel mounting brackets and provide and
install new granite counter tops.
4. Provide and install new toilet partitions.
5. Provide and install new mirrors.
6. Provide and install new lavatories.
7. Provide and install new lavatory faucets-
8- Provide and install new toilet flush valves and reinstall the toilets.
9. Provide and install new flush valves on the urinals.
10. Provide new light fixtures and install them around the new mirrors.
11. Patch and repair any damaged drywall.
12. Paint all non -tiled surfaces.
13. Protection and construction cleanup of all surrounding areas shall be
accomplished throughout the project.
09/19/2006 13:19 7607729407 DOUG WALL CONSTRUCT PAGE 02
R Nc
DOUG WALL CONSTRUCTION, INC.
C1 se. Lic 4743112
PALM SPRINGS CONVENTION CENTER RESTROOM REMODEL
19-Sep-06
DEMOLITION
9,000.00
STRUCTURAL STEEL
5,000.00
METAL FRAMING
1,200.00
COUNTER TOPS
17,000.00
CAULKING
350.00
MIRRORS
3,500.00
M? BOARD
1,200,00
CERAMIC TILE
30,000.00
PAINTING
1,800.00
PARR ONS & ACCES
13,500.00
PLUMBING
22,273.00
ELECTRICAL
14,000.00
TRASH REMOVAL
800.00
MISC LABOR
1,500,00
JOBSISTE OVERHEAD
900.00
SUPERVISION
9,000.00
131,023.00
P&O
19,653A5
150,676,45
INSURANCE
3,013.53
153,689.98
BONDING
3,073.80
156,763.78
7845D Avenue 41, Bermuda Dunes, CA92201 0 Office: (760) 772-8446 0 Fax: (760) 772-9407