HomeMy WebLinkAbout21528 - RESOLUTIONS - 3/1/2006 RESOLUTION NO. 21528
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
PALM SPRINGS, CALIFORNIA, APPROVING EXTERIOR
ALTERATIONS TO THE OASIS HOTEL TOWER AND
ATTACHED STRUCTURE, A DESIGNATED CLASS 1
HISTORIC SITE, LOCATED AT 121-A SOUTH PALM
CANYON DRIVE, ZONE CBD,SECTION 15."
WHEREAS, Oasis Plaza — Brandenburg & Lyle (the "Applicant) has filed an application
with the City pursuant to Section 94.02.00 of the Palm Springs Zoning Code, for a
Conditional Use Permit (CUP) for the adaptive reuse of a hotel to a restaurant and
associated improvements and Architectural Approval for exterior modifications to a Class 1
historic site located at 121-A South Palm Canyon Drive, Zone CBD, Section 15; and
WHEREAS, on February 6, 1985, the Oasis Tower and attached structure was designated
a Class 7 (now Class 1) historic site by the City Council; and
WHEREAS, on October 17, 1986, Section 2 of adopted Council Resolution No. 15424
requires City Council Approval for exterior alterations to the Oasis Hotel Tower; and
WHEREAS, the remainder of the Oasis building complex was listed on the 2004 Citywide
Historic Resources Survey; and
WHEREAS, on November 29, 2005, the Historic Site Preservation Board voted 3-2 to
approve the exterior modifications to the Class '1 historic site, with the exception of the
exterior staircase, and demolition of the buildings on the western portion of the site; and
WHEREAS, on December 13, 2005, the Historic Site Preservation Board voted 5-0 to
approve the staircase design, landscape plan, and paint color subject to further
refinements; and
WHEREAS, notice of public hearing of the Planning Commission of the City of Palm
Springs to consider Case No. 5.1093 CUP was given in accordance with applicable law;
and
WHEREAS, on February 8, 2006, following a public hearing where the Planning
Commission considered a staff report and public testimony, both written and oral, the
Commission approved Case No. 5.1093 CUP and recommended approval to the City
Council of the proposed alterations to the Oasis Hotel; and
WHEREAS, a Mitigated Negative Declaration was prepared for the project in accordance
with the California Environmental Quality Act (CEQA) Guidelines; and
WHEREAS, on March 1, 2006, the City Council reviewed the proposed alterations to the
exterior of the Oasis Hotel, and carefully reviewed and considered all of the evidence
presented in connection with the hearing on the project, including, but not limited to, the
staff report, and all written and oral testimony presented.
Resolution No. 21528
Page 2
THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY RESOLVE AS
FOLLOWS:
SECTION 1: A Mitigated Negative Declaration (MND) was prepared for this project in
accordance with the California Environmental Quality Act (CEQA) Guidelines, was
circulated for a 20-day public review period ending on February 8, 2006,
SECTION 2: The proposed project meets the required Conditional Use Permit findings set
forth in Section 94.02.00 of the Palm Springs Zoning Code, as follows:
1. That the use applied for at the location set forth in the application is properly
one for which a conditional use permit is authorized by this Zoning Code.
The Conditional Use Permit is required for a restaurant/bar pursuant to
Section 92.09.01 of the zoning ordinance. While "bars" are not a specifically
identified land use in the zoning ordinance, "beer gardens" and "cocktail
lounges" are listed as permitted uses with CUP. A bar is substantially similar
to the aforementioned land uses in terms of operation and potential impacts
and therefore, staff has determined that a CUP is required.
2. That the use is necessary or desirable for the development of the community,
is in harmony with the various elements of objectives of the general plan, and ,
is in harmony with the various elements or objectives of the general plan, and
is not detrimental to existing uses or to future uses specifically permitted in
the zone in which the proposed use is to be located.
The project site has a General Plan designation of CBD (Central Business
District) which has identified goals to create, "An environment which
integrates shopping with entertainment, cultural events, dining and leisure
activities..." and recognized the area between Alejo Road and Ramon Road
as the, "...principal activity center..." of the Downtown. The General Plan
also has an objective to create, "Food service as a prominent focus of color
and diversity on the retail areas..." The project furthers these goals and
objectives by proposing a restaurant/bar concept that will open during the
daytime and evening hours and will be similar in operation to other
successful restaurants in the downtown area. The proposed project is also
surrounded by other commercial/retail and restaurant uses in addition to the
Plaza Theater and the temporary Pavilion Theater. The project will
contribute to the integration of commercial, dining, and cultural uses and the
activity level of the downtown area.
The project is also consistent with the following General Plan policies:
Resolution No. 21528
Page 3
Policy 3.15.1 which states:
"Encourage a full diversity of high-quality uses, attractive
to both the resident and the visitor, including...retail,
entertainment, cultural, food sales and service..."
and Policy 3.15.E which states:
"Encourage a wide array of eating and drinking facilities
that are oriented to the pedestrian environment...Many
should offer outdoor dining in settings that are
attractively designed and landscaped."
As mentioned above, the project will contribute to the diverse character of the
downtown area by increasing the mix of food service uses in addition to the
existing retail and entertainment uses. The restaurant/bar will be distinctive
in the sense that it will incorporate historic elements into the restaurant
theme. The project proposes two outdoor dining areas: in the courtyard area
south of the Tower and in the corridor between the Tower and attached
structure and the adjacent commercial complex. The dining in the corridor
will increase the visibility of the restaurant from Palm Canyon Drive while the
dining in the courtyard is intended to provide an attractive open-air dining
A experience. A third potential outdoor dining area could be the roof deck,
above the 2"d floor dining area, that overlooks Palm Canyon Drive. While
occupant load will be determined by Building and Fire codes, the applicant
has indicated that the roof deck could be reserved for special occasions.
The project is also consistent with Policy 3.17.2 which states:
"Eliminate or correct blighting influences, including
deteriorating buildings, incompatible and uneconomic
land uses, obsolete structures, and other environmental,
and economic and social deficiencies."
Due to the fact that the hotel has not been operational for an extended period
of time, the existing buildings on the site have had significant vandalism
problems, which have led to the deterioration of the buildings. While the
owner has made efforts to reduce the vandalism through on-site security and
other proactive measures, vandalism of the site continues. The introduction
of an active use to this important historic site would eliminate the problems
associated with the unoccupied buildings and preserve the character-defining
features of the Oasis Tower and adjoining structure. The approved
demolition of the two buildings on the western portion of the site will also
eliminate two obsolete structures that have been significantly altered, have
lost their utility, and are a crime and vandalism magnet. The construction of
a new parking lot at the rear of the building will help to address the deficient
Resolution No. 21528
Page 4
parking that currently exists for the entire property. Therefore, the project is
consistent with the goals, objectives, and policies of the General Plan.
3. That the site for the intended use is adequate in size and shape to
accommodate such use, including yards, setbacks, walls or fences,
landscaping, and other features required in order to adjust such use to those
existing or permitted future uses of land in the neighborhood.
The project is for the adaptive reuse of an existing historic structure. No
expansion of the existing concrete structure if proposed. The only addition
proposed is a 2°d floor outdoor covered bar area immediately east of the
dining area. This addition will not exceed the existing building height and will
not violate setbacks as required by the CBD zone. The site is surrounded by
commercial uses on all sides and the rehabilitation of the site will be a benefit
to the downtown area. Therefore, the site is adequate in size and shape to
accommodate the proposed use.
4. That the site for the proposed use relates to streets and highways properly
designed and improved to carry the type and quantity of traffic to be
generated by the proposed use.
The site will be accessed by pedestrians primarily from Palm Canyon Drive
and from the proposed parking lot to the west of the restaurant/bar. The site '
has frontage on three public streets: Tahquitz Canyon Way (major
thoroughfare) to the north, Belardo Road (collector) to the west, and South
Palm Canyon Drive (secondary thoroughfare) to the east. These streets
have the capacity to carry the traffic expected to be generated from the
proposed project. However, conditions of approval have been included to
ensure that traffic on Tahquitz Canyon Way is not adversely affected by
turning conflicts due to vehicle stacking at the Tahquitz Canyon Way/Palm
Canyon Drive intersection. Therefore, it is not anticipated that the project will
generate enough trips to exceed the capacity of the surrounding public
streets.
5. That the conditions to be imposed and shown on the approved site plan are
deemed necessary to protect the public health, safety and general welfare
and may include minor modification of the zone's property development
standards.
The conditions of approval are imposed to protect the public health, safety,
and welfare. Conditions of approval relating to access to the parking lot are
included specifically to address traffic safety concerns. Conditions of
approval have also been included to address the daily operation of the
restaurant/bar to ensure that there is no adverse impact on the surrounding
areas.
Resolution No. 21528
Page 5
SECTION 3: The proposed project meets the guidelines for Architectural Approval set
forth in Section 94.04.00 of the Palm Springs Zoning Code, based on the following. The
proposed improvements include:
1. Remove and replace deteriorated materials such as wood lattice and doors
either with metal or composite wood. Original doors and windows in good
condition will be restored.
2. Remove and replace balcony railings on the north elevation and courtyard
(south) elevation.
3. Addition of glass guardrail at the Tower observation area.
4. Replace the existing roof with a standing seam metal roof.
5. Addition of an exterior staircase that leads to the 2"d floor dining area on the
north elevation.
6. New corridor and courtyard landscaping and courtyard fountains.
7. Sawcuts of the decorative concrete for new window and door openings for
the kitchen (west elevation) and entrance into the ground floor dining area
(north elevation).
8. New outdoor covered bar on the second floor that will extend immediately
east of the dining area.
9. New exterior stair and elevator at the Tower in order to comply with current
ADA regulations.
10. Repaint of the concrete structure to match the original color.
' 11. Painting of the new lattice and railings.
These improvements have been reviewed and approved/recommended for approval
by the Historic Site Preservation Board and Architectural Advisory Committee and
recommendations from both bodies have been incorporated into the conditions of
approval for this project. The proposed improvements and materials preserve and
restore the character-defining features of the historic site and are sympathetic to
Lloyd Wright's Modern/Art Deco design. The improvements have also been
analyzed in a historical assessment for the project and found to conform to the
Secretary of the Interior's Standards for the Treatment of Historic Properties. The
low-scale stairway design also preserves the north elevation of the Oasis Tower
building while providing some visibility for the 2nd floor restaurant. In addition, with
the exception of a 2nd story bar, the project proposes no expansion of the existing
concrete structure and therefore, would not create any additional intrusions onto
adjacent structures and properties. The 2nd story bar addition is compatible with the
existing architecture and is in scale with the existing height and mass of the
building. The preliminary landscape plan submitted for the project also shows
sensitivity to the designated historic site by providing an attractive outdoor dining
area without obstructing the primary views of the Tower.
SECTION 4. The proposed exterior alterations to the Oasis Hotel described in Case
5.1076 and located at 121-A South Palm Canyon are approved.
ADOPTED, this 1 st day of March, 2006.
Resolution No. 21528
Page 6
David H. Ready, City Manrag6r'—
ATTEST:
9 _
.dunes Thompson, City Clerk—�
CERTIFICATION
STATE OF CALIFORNIA )
COUNTY OF RIVERSIDE ) ss.
CITY OF PALM SPRINGS )
I, JAMES THOMPSON, City Clerk of the City of Palm Springs, hereby certify that
Resolution No. 21528 is a full, true and correct copy, and was duly adopted at a regular
meeting of the City Council of the City of Palm Springs on March 1, 2006, by the following
vote:
AYES: Councilmember McCulloch, Councilmember Mills, Councilmember Pougnet,
Mayor Pro Tern Foat and Mayor Oden '
NOES: None
ABSENT: None
ABSTAIN: None
,Javlies Thompson, City Clerk
ity of Palm Springs, California