Loading...
HomeMy WebLinkAbout2/7/2001 - STAFF REPORTS (9) DATE: February 7, 2001 TO: City Council FROM: Director, Department of Facilities V2C GROUP SERVICE CONTRACT RECOMMENDATION: That City Council approve a Contract Service Agreement with V2C Group for design and specification preparation services for the installation of new play structures at Victoria Park and rubbersurfacing at Victoria Park, DeMuth Park, and Baristo Park, in an amount not to exceed $7,000. SUMMARY: At the September 6, 2000 City Council meeting, Council approved the purchase of play equipment from Miracle Playground Sales for Victoria Park in the amount of $56,134.98. V2C Group did the design and specification preparation services for the new play structures installed at Ruth Hardy Park and Sunrise Plaza. Funds forthis agreement are available in Account Number 261-2494-51 5 1 7,Victoria Park Play Equipment, Measure "Y" Improvements. BACKGROUND: In 1999, V2C Group performed the design and specification preparation services for the new play structures installed at Ruth Hardy Park and Sunrise Plaza. This contract will address the renovation of three existing play areas at Victoria Park, DeMuth Park, and Baristo Park. New play structures and swings will be provided at Victoria Park. Rubber surfacing will be added to all three playgrounds while providing access per the Americans with Disabilities Act (ADA). Play area improvements will also be in compliance with playground safety standards in compliance with ASTM standards. The Scope of Services reflects V2C Group representatives' understanding of the project objectives gained through review of topographic survey plans, discussion with City staff, and their experience in playground renovation. Preliminary design will include the initial meeting with City staff to solicit suggestions for refinement of existing conceptual designs. It will take four weeks to complete the preliminary design and preparation of construction documents — one week for preliminary design, which includes conceptual design and cost projections, and three weeks to complete construction documents (plans, specifications, estimates). V2C GROUP SERVICE CONTRACT DATE: February 7, 2001 PAGE: Two At the September 6, 2000 City Council meeting, Council approved the purchase of play equipment from Miracle Playground Sales for Victoria Park in the amount of$56,134.98. Funds for this Contract Service Agreement are available in Account Number 261- 2494-51517, Victoria Park Play Equipment, Measure "Y" Improvements. HAROLD E. GOOD, CPPO SCOTT MIKESELL, Director Procurement Manager Department of Facilities APPROVE E -.�� City Manager ATTACHMENT: 1. Contract Services Agreement REVIEWED BY DEPT. OF FINANCE 2. Minute Order 9�Z CITY OF PALM SPRINGS Department of Facilities CONTRACT SERVICES AGREEMENT FOR LANDSCAPE ARCHITECTURAL SERVICES FOR DESIGN OF PARK RENOVATIONS AT VICTORIA PARK,DEMUTH PARK AND BARISTO PARK THIS CONTRACT SERVICES AGREEMENT (herein "Agreement") is made and entered into this day of February, 2001, by and between the CITY OF PALM SPRINGS, a municipal corporation, (herein "City") and V2C GROUP, INC., a California corporation, (herein "Contractor"), (The term "Contractor" includes professionals performing in a consulting capacity.) NOW, THEREFORE,the parties hereto agree as follows: 1.0 SERVICES OF CONTRACTOR 1.1 Scope of Services. In compliance with all of the terms and conditions of this Agreement, Contractor shall perform the work or services set forth in the"Scope of Services" attached hereto as Exhibit"A" and incorporated herein by reference. Contractor warrants that all work and services set forth in the "Scope of Services" will be performed in a competent, professional and satisfactory manner. 1.2 Compliance with Law. All work and services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules and regulations of City and any federal, state or local governmental agency of competent jurisdiction. 1.3 Licenses,Permits,Fees and Assessments.Contractor shall obtain at its sole cost and expense such licenses,permits and approvals as may be required by law for the performance of the services required by this Agreement. 2.0 COMPENSATION 2.1 Contract Sum. For the services rendered pursuant to this Agreement, Contractor shall be compensated in accordance with the "Schedule of Compensation" attached hereto as Exhibit "B" and incorporated herein by this reference, but not exceeding the maximum contract amount of Seven Thousand and no/100 Dollars ($7,000.00) (herein "Contract Sum"). 2.2 Method of Payment. Provided that Contractor is not in default under the terms of this Agreement, Contractor shall be paid upon completion. 3.0 COORDINATION OF WORK 3.1 Representative of Contractor: Anthony M. Mendoza is hereby designated as being the principal and representative of Contractor, authorized to act in its behalf with respect to the work and services specified herein and make all decisions in connection therewith. 1?1445 EXHIBIT "A" SCOPE OF SERVICES The project objective is to renovate three(3)existing play areas at Victoria Park,DeMuth Park and Baristo Park.New play structures and swings will be provided at Victoria Park. Rubber surfacing will be added to all three playgrounds while providing access per the Americans with Disabilities Act (ADA). Play area improvements will also be in compliance with playground safety standards in compliance with ASTM standards. Victoria Park improvements will include new play equipment and swings, and concrete walks. The largest play structure will be for the 5 to 12 age group and the second one for a 2 to 5 age group.Rubber surfacing will be installed to provide access to all structures and swing units. DeMuth Park and Baristo Park must be evaluated by Miracle Play Equipment Company to determine compliance of existing equipment with safety standards. Design of the play structures has been accomplished by the manufacturer's representative and City staff. Small refinements to assure greater access to one of the structures will be considered during preliminary design. Areas of rubber surfacing will also be modified to address access needs and budgetary constraints. These issues will be addressed with City staff and the manufacturer's representative. TASK A—PRELIMINARY DESIGN 1. ANALYSIS AND SCHEMATIC DESIGN a. Meet with City staff to review three (3) existing playgrounds and evaluate field conditions b. Prepare Conceptual Design for park improvements c. Prepare Preliminary Cost Estimate for site improvements TASK B —CONSTRUCTION DOCUMENTS 1. PREPARE CONSTRUCTION BID DOCUMENTS a. Prepare Construction Drawings(10 scale) • Title Sheet • Demolition Plan (Victoria Park) • Grading/Construction Plan (Victoria Park) • Grading/Construction Plan (DeMuth Park) • Grading/Construction Plan (Baristo Park) • Construction Details b. Prepare "Special Provision" Specifications and Bid Schedule c. Prepare Estimate of Probable Construction Costs d. Meet with City staff to review Construction Bid Documents (95% submittal) for approval e. Coordinate contract documents with City Engineering Division Plan and Specification submittals: 1. 95% Two (2) sets 2. 100% Originals 3. Bidding Provided by City Documents provided by City: 1. Site improvement plans 2. "General Provision" Specifications -prepared by City Performance Schedule: 1. Task A- 100% complete by February 19, 2001 2. Task B - 100% complete by March 12, 2001 94NYEXHIBIT "A" SCOPE OF SERVICES Page 1 of I EXHIBIT "B" SCHEDULE OF COMPENSATION Compensation Rate Schedule: $80/hr. - Principal $70/hr. - Landscape Architect $60/hr. - Designer/Draftsman $35/hr. - Clerical TASK A (as shown on Exhibit "A," Scope of Services) Item 1.a.: 6 furs. @ $80/hr. Principal $ 480 Item l.b.: 6 firs. @ $60/hr. Designer/Draftsman 360 Item I.e.: 2 hrs. @ $60/hr. Designer/Draftsman 120 Total - Task A: (14 hrs.) (I wk.) $ 960 TASK B (as shown on Exhibit "A," Scope of Services) Item La.: 8 hrs. @ $80/hr. Principal $ 640 54 hrs. @ $60/hr. Designer/Draftsman 3,240 Item l.b.: 6 hrs. @ $80/hr. Principal 480 4 hrs. @ $35/hr. Clerical 140 Item I.e.: 4 firs. @ $60/hr. Designer/Draftsman 240 Item l.d.: 4 hrs. @ $80/hr. Principal 320 Item I.e.: 4 hrs. @ $80/hr. Principal 320 Total - Task B: (84 firs.) (3 wks.) $5,380 TOTAL- TASK A&TASK B (98 hrs.) (4 wks.) $6,340 PLUS REIMBURSABLE EXPENSES REIMBURSABLE EXPENSES Out-of-pocket expenses (plotting, blueprinting, reproduction, and printing)will be invoiced at cost plus 10%. 9Ar EXHIBIT "B" SCHEDULE OF COMPENSATION Page I of 1 MINUTE ORDER NO. 6790 APPROVING CONTRACT SERVICES AGREEMENT WITH V2C GROUP FOR DESIGN AND SPECIFICATION PREPA- RATION SERVICES FOR THE INSTAL- LATION OF NEW PLAY STRUCTURES AT VICTORIA PARK, DEMUTH PARK, AND BARISTO PARK, IN AN AMOUNT NOT TO EXCEED $7,000. ------------------ I HEREBY CERTIFY that this Minute Order, approving Contract Services Agreement with V2C Group for design and specification preparation services for the installation of new play structures at Victoria Park, DeMuth Park, and Baristo Park, in an amount not to exceed $7,000, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 7th day of February, 2001. PATRICIA A. SANDERS City Clerk i'