Loading...
HomeMy WebLinkAbout12/6/2000 - STAFF REPORTS (6) DATE: December 6, 2000 TO: City Council FROM: Deputy Director of Aviation -Administration CHANGE ORDER- RESIDENTIAL SOUND INSULATION PROGRAM RECOMMENDATION: It is recommended that the City Council approve a change order, Change Order#1, with T& M Construction for the Airport's Residential Sound Insulation Program, for an increase of$13,480.90. SUMMARY: This item is a recommendation to approve a change order on the airport's Residential Sound Insulation Project, increasing total cost by $13,480.90 with funding covered by FAA grant and Airport funds. BACKGROUND: On December 15, 1999, City Council adopted minute order No. 6547 approving a contract agreement for RSIP Phase II construction with T & M Construction. The FAA appropriated $2,000,000 under Airport Improvement Program (AlP) Project No. 3-06- 0181-21 for PSP's RSIP Phase II program. This is the only change order associated with T & M Construction after having successfully completed the sound insulation process for 37 single family homes. The cumulative charges involve various items at 17 homes and are within the guidelines acceptable to the FAA as related to sound insulation projects. This project, like all Airport contracts, was a unit cost contract where the original bid was based on estimated units of work and the contract is balanced based on actual units installed. The existing FAA grant will cover 90% of the overage with Airport picking up the remainder. Funds are available in Airport Account 415-6600-56008. The change order and a Minute Order are attached for City Council consideration. Richard Strickland AL N F. SNOOT, AAE Deputy Direction of Aviation Assistant City Manager-Special Projects APPROVED: City Manager -,— REVIEWED BY DEff.OF FINANCE -7g,x�, CITY OF PALM SPRINGS PALM SPRINGS INTERNATIONAL AIRPORT CONSTRUCTION CHANGE ORDER NO. 'I (PHASE II) To: T&M Construction Date: November 20 2000 10931 Chapman Avenue Project No. City Proiect 99-04 Garden Grove, CA 92840 FAA AIP Proicet No: AIP Project 3-06-0181-23 Attn: Mr. Bill Walker Project Name: Residential Sound Insulation Program Phase II Contract Purchase No. 909356 Account No. 415-6600-56008 Description of Change to be Made: See attached descriptions related to change orders at 17 separate homes in the Residential Sound Insulation Program Phase II. 1. Total cost for all change orders. $13 480 90 Summary of Cost/Time Original Contract Price $ 717,428.00 Total of all Previous Change Orders $ 0 Total of this Change Order $ 13,480.90 Total Contract Price $ 730 908.90 The Contract Time will be increased by 0 calendar days. I have received a copy of this Change Order City Approval: and the above AGREED PRICES are acceptable Submitted by: to the contractor. irectorofAvl l By: Date: Title: Approved by: City Manager Date: ���OO Date: Approved by the FAA: Date: Distribution: Original Conformed Copies Conformed - File Copy Airport (1) Purchasing Agent (1) City Clerk (1) Finance (1) C. Kell Smith &Associates (1) yA� Change Order No. 1 continued See T &M Construction Log Sheet Description: Project No. 6 1. Provide window tinting. Purpose of work: 1. Existing windows were tinted. Attachments: 1 Field Change Report,No D6C dated April 14,2000. Project No. 6 1. Replace new Secondary Window No. 2, installed per plans, with an insulted acoustical window. Purpose of work: 1. New window, as installed, was not satisfactory to the Homeowner. Attachments: 1 Proposal dated October 24, 2000. Project No. 6 1. Replace damaged windows. Purpose of work: 1. To replace and repair windows damaged during a break-in. Attachments: 1 Proposal dated October 24, 2000. Description: Project No. 8 1. Provide secondary windows with airspace at bath Windows#19 and 920. Purpose of work: 1. Windows #19 and 420 are to narrow for retrofit windows. 1 143 Attachments: 1 Field Change Reports,No. D8A dated February 21, 2000. Purpose of work: 1. Window#22 is to short for new window. Project No. 8 1. Do not replace bath Window#22 Attachments: I Field Change Report No. D813 dated February 24, 2000. Project No. 8 2. Do not install Storm Door"A". Attachments: None Description: Project No. 11 1. Do not replace bath Windows#2, #7 and 910. 2. Install larger window at Window#9. Purpose of work: 1. Windows#2,#7 and#10 are to short for new retrofit windows. 2. Window#9 is 24" wider than shown on plans. Attachments: 1 Field Change Report No. DI IA dated February 24, 2000. Description: Project No. 13 1. Lower windowsills, at Window #7 and #8, and install larger windows, as required to meet egress. Purpose of work: 1. Windowsills at Windows #7 and #8 will be to high to meet egress if windows are installed per plans. Attachments: 1 Field Change Report No. D13A dated February 21, 2000. 2 yAy Description: Project No. 13 1. Windows#5 and#6 to be vertical sliders instead of casements, as shown on plans. 2. All other Program windows to be Horizontal sliders. 3. Contractor to provide documentation of owner's agreement. Purpose of work: 1. The above window changes are per the owners request and have no cost impact. Attachments: 1 Field Change Report No. D13B dated February 21,2000. Description: Project No 13 1. Replace existing electrical conduit and old copper plumbing, located on top of existing roof and locate, as required, on top of new roof. 2. Contractor to provide price and schedule impact for review and approval. Purpose of work: 1. The existing conduit and copper plumbing piping is old. I do not recommend concealing the conduit and plumbing piping under the new roof, as they would not be accessible should maintenance be required. Attachments: 1 Field Change Report No. D13C dated February 24, 2000. Description: Project No. 13 1. Test and Identify possible asbestos material located at all plumbing vent pipes protruding through existing roof. Purpose of work: 1. If plumbing vent pipes have asbestos it will have to be removed before extending through new roof structure. 2. Contractor to verify presence of asbestos with Architect. 3. Contractor to provide price and schedule impact for review and approval. 3 f Attachments: 1 Field Change Report No. D13D dated February 8, 2000. Description: Project No. 13 2. Form and pour anew concrete walk around new evaporative cooler Purpose of work: 4. The new evaporative cooler and concrete pad partially interterruped the path of travel on the existing concrete sidewalk. The new sidewalk was added to provide continued path of travel. Attachments: 1 Proposal dated October 24, 2000. Description: Project No. 15 1. Trim new clerestory window frames with wood trim to match profile of existing. Purpose of work: 1. The work was required provide a"like for like" solution to the unique look of the existing clerestory windows. Attachments: I Proposal dated October 24, 2000. Description: Project No. 16 1. Lower windowsills at Windows #1 and #2 and install larger window as required to meet egress. Purpose of work: 1. VTmdows 41 and 92 will not meet egress requirements if installed as shown on plans. Attachments: 1 Field Change Report No. D16A dated February 21, 2000. Description: Project No 18 4 YA4 1. Provide extra insulation and silicon caulking on the inside of new window frames. Purpose of work: 1. This was approved and provided to satisfy the request of the homeowner. Attachments: 1 Proposal dated October 24, 2000. Description: Project No. 19 1. Install secondary glazing with air gap at Window#16. 2. Contractor to provide Manufacture's detail for approval. Purpose of work: 1. Entry door window 416 is to narrow for retrofit but must meet acoustic requirements, as it is located at the entrance to the residence. Attachments: 1 Field Change Report No. D19A dated February 7, 2000. Description: Project No. 20 1. Provide new acoustical window over Door "D". Window size, color, and type to match others, as required. 2. Provide new acoustical wood entry door for Door "D". Door size, color, trim kit and hardware, as required. Purpose of work: 1. Window over Door"D"was not included in window schedule. 2. Door"D"was not included in door schedule. Attachments: 1 Field Change Report No. D20A dated February 21, 2000. Description: Project No. 23 1. Replace existing Door"A" with anew acoustical door rather than a storm, as directed on the plans. Refer to Detail#9. Purpose of work: 5 Yh 1. The stonework around the existing entry door "A" does not allow enough room to install a new storm door and frame. Attachments: 1 Proposal dated February 15, 2000 and 1 Field Change Report No. D23A dated February 23, 2000. Description: Project No. 27 1. Windows#1, #2, #3 and#4 are to be tinted to match existing tint. Purpose of work: 1. Window tint was not identified at the first site inspection and should be provided to match existing,as requested by homeowner. Attachments: 1 Field Report No. D27B dated February 25,2000. Description: Project No. 27 1. Remove new French Doors and sidelites and replace with wider French Door without sidelites. Purpose of work: 1. The French Door/ Sidelite combination, as provided by the manufacturer was not satisfactory to the Homeowner. Attachments: 1 Proposal dated October 24, 2000. Description: Project No. 28 1. Bath Windows#10 and 911 shall remain as is. Purpose for work: 1. Windows#10 and#11 are to narrow for retrofit as called for on plans. Attachments: 1 Field Change Report No. D28B dated February 8, 2000. 6 yot Description: Project No. 29 1. Sliding glass Doors "C", "D" and "E" are to be 12" wider than plans call for. Purpose of work: 1. Field verification by Contractor found the above doors to be 12" larger than Door Schedule indicates. Attachments: 1 Field Change Report No. D29A dated February 21,2000. Description: Project No. 31 1. Window#10 is to be 24" wider than indicated on plans. Purpose of work: 1. Field verification by Contractor found the above window to be 24" larger than Window Schedule indicates. Attachments: 1 Field Change Report No. D31A dated February 21, 2000. Description: Project No. 33 1. Door `B" is to be an 8'-0" sliding glass door not a 6'-0" door as indicated on the Door Schedule. Purpose of work: 1. Field verification by Contractor found the above door to be 24" wider than the Door Schedule indicates. Attachments: 1 Field Change Report No. D33A dated February 23, 2000. Description: 7 y4 9 Project No. 34 1. Window #3 shall be a vertical slider instead of a horizontal slider as indicated in Window Schedule. 2. Do not lower windowsill as indicated in Window Schedule. Purpose of work: 1. Owner did not want Window 94 lowered to provide egress and match the treatment of the other windows on that side of the house. The lower window would be below the headboard in that bedroom The egress requirement can be satisfied by changing Window#3 to a vertical slider. Attachments: 1 Field Change Report No. D34A dated February 23,2000. Description: Project No 34 1. Remove existing textured ceiling finish in the Dining and Living Rooms and apply new textured finish. Purpose of work: 1. Ceiling finish was defective and began to peel off after the installation of the new evaporative cooler. Work includes asbestos abatement. Attachments: 1 Proposal dated September 8, 2000. Description: Project 38 1. Do not replace Bathroom Windows#6 and#7 as directed on plans. Purpose of work: 1. Bathroom Windows#6 and#7 are too narrow for retrofit windows. Attachments: 1 Field Change Report No.D38A dated February 24, 2000. Description: Project No. 39 1. Install a new pair of acoustical entry doors for Door "A" instead of the pair of storm doors indicated in the Door Schedule. Purpose of work: 8 I. The homeowners agreed to the storm doors thinking they were French doors. They did not know what storm doors are and now that they understand they want the Program acoustical door. This would normally be a homeowner upgrade but Lila Zinn, with C. Kell-Smith and Associates, and I recommend that the Program cover the cost of the change. Attachments: 1 Proposal dated February 15, 2000 and 1 Field Change Report No. D39A dated February 8, 2000. Description: Project No. 39 1. Do not replace Window#8. 2. Provide an additional window, Window 49, size to be provided by the Contractor. Purpose of work: 1. Window #8 is too small for retrofit window, as called for in Window Schedule. 2. Field verification by Contractor found a window that was not indicated on the plans. Attachments: 1 Field Change Report No. D39B dated February 24,2000. 9 gall MINUTE ORDER NO, APPROVING A CHANGE ORDER, CHANGE ORDER#1, WITH T& M CONSTRUCTION IN THE AMOUNT OF $13,480.90 FOR THE AIRPORT'S RESIDENTIAL SOUND INSULATION PROGRAM. I HEREBY CERTIFY that this Minute Order approving a change order, Change Order#1, with T& M Construction in the amount of$13,480.90 for the Airport's Residential Sound Insulation Program was adopted by the City Council of the City of Palm Springs, California in a meeting thereof held on the 6'" of December 2000. PATRICIA A. SANDERS City Clerk 146