Loading...
HomeMy WebLinkAbout11/15/2000 - STAFF REPORTS (4) 0 DATE: November 15, 2000 TO: City Council FROM: City Engineer CITYWIDE TRAFFIC VOLUME COUNTING AND SPEED SURVEY RECOMMENDATION: That the City Council approve a one-year Contract Services Agreement with Counts Unlimited, in an amount not to exceed $5,000.00, for the Citywide Traffic Volume Counting and Speed Survey Program, with a one-year extension option, at staff's discretion, City Project No. 00-23. BACKGROUND: This project updates key traffic volume and speed surveys on an annual basis for a variety of uses. These are: 1) collision rate analysis and investigation, 2) required reporting for a variety of grants, 3) required data requisitions by the Highway Pavement Management System and, (4) public requests for information. On July 27, 2000, the Engineering Dept sent out a Request for Proposals to several Southern California traffic data collection firms. We received back four proposals. After careful review of the proposals, the Engineering Dept found that, of the proposals received, Counts Unlimited would be able to provide the best service and had the lowest cost proposed. Counts Unlimited was selected for the City's previous Traffic Volume Counting contract. Their service and quality of work have been excellent. Data collection has been performed in a timely manner and in accordance with directions given. Sufficient funds for this work are available in account number 261-4491-50103 (Traffic Volume Counting). DAVID J. BARAKIAN City Engineer APPROVtD�6r✓ City Manager ATTACHMENT: 1. Minute Order 2. Agreement with Counts Unlimited REVIEWED BY DEPT.OF FINANCE GA CITY OF PALM SPRINGS Engineering Division CONTRACT SERVICES AGREEMENT FOR Traffic Volume Counts and Speed Survey Data Collection City Project 00-23 THIS CONTRACT SERVICES AGREEMENT(herein"Agreement"), is made and entered into this day of , 19_, by and between the CITY OF PALM SPRINGS, a municipal corporation, (herein "City") and Counts Unlimited, (herein "Contractor"). (The term Contractor includes professionals performing in a consulting capacity.) The parties hereto agree as follows: 1.0 SERVICES OF CONTRACTOR 1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, the Contractor shall provide those services specified in the "Scope of Services" attached hereto as Exhibit "A" and incorporated herein by this reference, which services may be referred to herein as the "services"or"work"hereunder. As a material inducement to the City entering into this Agreement, Contractor represents and warrants that Contractor is a provider of first class work and services and Contractor is experienced in performing the work and services contemplated herein and, in light of such status and experience, Contractor covenants that it shall follow the highest professional standards in performing the work and services required hereunder and that all materials will be of good quality, fit for the purpose intended. For purposes of this Agreement,the phrase "highest professional standards" shall mean those standards of practice recognized by one or more first-class firms performing similar work under similar circumstances. 1.2 Contractor's Proposal. The Scope of Service shall include the Contractor's proposal or bid which shall be incorporated herein by this reference as though fully set forth herein. In the event of any inconsistency between the terms of such proposal and this Agreement, the terms of this Agreement shall govern. 1.3 Compliance with Law. All services rendered hereunder shall be provided in accordance with all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local governmental agency having jurisdiction in effect at the time service is rendered. 1.4 Licenses, Permits, Fees and Assessments. Contractor shall obtain at its sole cost and expense such licenses, permits and approvals as may be required by law for the performance of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from or are necessary for the Contractor's performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City against any such fees, assessments, taxes penalties or interest levied, assessed or imposed against City hereunder. 1.5 Familiarity with Work. By executing this Contract, Contractor warrants that Contractor(a) has thoroughly investigated and considered the scope of services to be performed, (b)has carefully considered how the services should be performed, and (c) fully understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. If the services involve work upon any site, Contractor warrants that Contractor has or will investigate the site and is or will be fully acquainted with the conditions there existing, prior to commencement of services hereunder. Should the Contractor discover any latent or unknown conditions, which will materially affect the performance of the services hereunder, Contractor shall immediately inform the City of such tact and shall not proceed except at Contractor's risk until written instructions are received from the Contract Officer. rS2/276/099999-3000/2160684 2 6/14/96 Revised:09/01/98 1 meaning of the language used and shall not be construed for or against either party by reason of the authorship of this Agreement or any other rule of construction which might otherwise apply. 9.3 Integration; Amendment. It is understood that there are no oral agreements between the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this Agreement. This Agreement may be amended at any time by the mutual consent of the parties by an instrmnent in writing. 9.4 Severability. In the event that any one or more of the phrases, sentences, clauses, paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a validjudgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless. 9.5 Corporate Authority. The persons executing this Agreement on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (h) they are duly authorized to execute and deliver this Agreement on behalf of said party, (iii)by so executing this Agreement, such party is formally bound to the provisions of this Agreement, and(iv)the entering into this Agreement does not violate any provision of any other Agreement to which said party is bound. IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above. CITY OF PALM SPRINGS, ATTEST: a municipal corporation By: City Manager City Clerk APPROVED AS TO FORM: City Attorney F82/276/099999-3000/2160684.2 6/14/96 Revised:09/01/98 10 (Corporations require two signatures: One from each of the following: A. Chan man of Board,President,any Vice President: AND B. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer,or Chief Financial Officer). (Check one) _Individual_ Partnership Corporation CONTRACTOR: Counts Unlimited By: Signature Notarized Signature A Print Name &Title By: Notarized Signature B Print Name &Title Mailing Address: 25424 Jaclyn Avenue Moreno Valley, CA 92557 (END OF SIGNATURES) EXHIBIT "A" TO CONTRACT SERVICES AGREEMENT I`Ki276/099999-3000/3160684 26/IA/96 Rc,,n,d.09/01/98 lI G� � EXHIBIT "A" SCOPE OF SERVICES Task 1: Kickoff Meeting The contractor shall hold a kickoff meeting with City staff to discuss the goals of the project and to obtain input from the City as to the specific data needed from each location, database file format, and times table for each type of data collection and location for each data collection point. Once the data collection points have been determined the Contractor shall submit a schedule of when each count location is to have the road tubes placed. This schedule will be forwarded to the Street Maintenance Division by the Contract Officer to be posted for Sweeper Operators information. Any variation from this schedule must be submitted to the City for prior approval. Task 2: Annual Season Traffic Volume Count Locations " Intersection Entering Traffic Volume Comet Collection The Contractor shall collect intersection count data using one counter for each approach. These counts shall be collected in 15 min intervals for 24 hours with each count beginning at midnight. Each road tube location shall be marked with an 18" orange cone where the tube(s) cross the gutter. This data shall be saved in file formats compatible with Crossroads Software's count module (Access 2.0 format) and with Jamar's Traffic Analysis Systems (TAS95+) software version S.00N. Once this data is collected, the Contractor shall review the reports for count accuracy and determine if any equipment failures or other anomalies occurred during the count period. If none are found, the contractor shall forward the electronic data to the Contract Officer, via e-mail, for review. If errors are found, the Contractor shall recount the location. Upon the Contract Officer's approval a written report shall be submitted to the Engineering Department for City files. The final report shall be in the appropriate TAS Plus format. Task 3: Annual Off Season Traffic Volume Count Locations _ Intersection Entering Traffic Volume Count Collection The Contractor shall collect intersection count data using one counter for each approach. These counts shall be collected in 15 min intervals for 24 hours with each count beginning at midnight. Each road tube location shall be marked with an 18" orange cone where the tube(s) cross the gutter. This data shall be saved in file formats compatible with Crossroads Software's count module (Access 2.0 format) and with Jamar's Traffic Analysis Systems (TAS95+) software version S.00N. Once this data is collected, the Contractor shall review the reports for count accuracy and determine if any equipment failures or other anomalies occurred during the count period. If none are found, the contractor shall forward the electronic data to the Contract Officer, via e-mail, for review. If errors are found, the Contractor shall recount the location. Upon the EXHIBIT "A" TO CONTRACT SERVICES AGREEMENT FS206/099999-3000R 1606&62 6/1 d/96 Revised.09/008 12 4hr Contract Officer's approval a written report shall be submitted to the Engineering Department for City files. The final report shall be in the appropriate TAS Plus format. Task 4: HPMS Traffic Volume Count Locations " Mid-Block Two Directional Counts These counts shall be collected in 15 min intervals for 24 hours with each count beginning at midnight. Each road tube location shall be marked with an 18" orange cone where the tube(s) cross the gutter. The data shall be divided into directional counts. This data shall be saved in file formats compatible with Crossroads Software's count module (Access 2.0 format) and with Jamar's Traffic Analysis Systems (TAS95+) software version S.00N. Once this data is collected, the Contractor shall review the reports for count accuracy and determine if any equipment failures or other anomalies occurred during the count period. If none are found, the contractor shall forward the electronic data to the Contract Officer, via e-mail, for review. If errors are found, the Contractor shall recount the location. Upon the Contract Officer's approval, a written report shall be submitted to the Engineering Department for City files. The final report shall be in the appropriate TAS Plus format. Task: 5: Speed Survey Requests From time to time the City may need to request spot speed surveys. The Contract Officer shall stipulate whether the data shall be collected by machine or by radar/ laser technology. If radar or laser technology is selected, the Contractor shall collect a total of 100 random samples of travel from the site. The Contractor shall prepare a report from the data collected. Each report shall show the following information; the site location, the posted speed limit, date and time of the survey, the direction of travel, 50"' percentile, 85"' percentile, 10 mph pace, percent over pace range of speeds, actual number of vehicles observed and the average speed. If the Contract Officer determines that the site requires data to be collected by machine the Contractor shall collect 24 hours of data. The Contractor shall then prepare a report from the data collected. The report prepared shall be per the TAS Plus format. The contractor shall schedule the survey and notify the Contract Officer with the time and date the survey equipment will be installed. It shall be the Contract Officer's responsibility to notify the Street Maintenance Department so that the Street Sweepers are aware of the equipment's presence on the roadway. EXHIBIT "A" TO CONTRACT SERVICES AGREEMENT PS2p76/0999993000/2160684.2 6/14/96 Reviscil,09/01/98 13 44#4 EXHIBIT 'B" SPECIAL REQUIREMENTS Section 3.4 shall be waived and replaced with the following: The contractor shall begin work within 15 calendar days after the contract has been awarded by the City Council of the City of Palm Springs and a Notice to Proceed is issued to the Contractor. Volume Counting of the HMPS location count, to be provided by the Contract Officer with the Notice to Proceed, shall be performed diligently until completed. Data will be collected on Tuesdays, Wednesdays and Thursdays, unless otherwise stated. The Contractor shall remain under contract, performing services upon written request by the Contract Officer for one year after the award. The City reserves the right to extend this contract for an additional 1 year. Section 5.3 "Performance Bond" shall be waived. Section 7.7 "Liquidated Damages" shall be waived. EXHIBIT 'B" TO CONTRACT SERVICES AGREEMENT FS2/276/099999-300D/2160684 26/14/96 R,,i,.l 09/01/98 14 Gh07 EXHIBIT "C" SCHEDULE OF COMPENSATION Tasks below are identical to tasks identified in Exhibit A of this Agreement. Task Unit Sum 1. Kick off meeting $0.00 2. Annual Seasonal Traffic Volume Count Locations - Entering Traffic $200.00 each intersection 3. Annual Off Season Traffic Volume Count Locations " Enterin Traffic $200.00 each intersection 4. HPMS Traffic Volume Count Locations " Segmental Counts $200.00 each intersection 5. Speed Surveys 5.1 - Radar/ Laser Speed Surveys $50.00 each location 5.2 -2 lane speed surveys w/ data collection machine $150.00 each location 5.3 -4 lane speed survey w/data collection machine $225.00 each location TOTAL COST NOT TO EXCEED $5,000.00 Payments to the contractor shall be made monthly based on Contractor Officer's approval of the Contractor's monthly billing statement for locations completed. EXHIBIT "C" TO CONTRACT SERVICES AGREEMENT F52276/099999-3000/2160684.2 6/14/96 Rcviscd:09/01/98 15 &hV EXHIBIT "D" SCHEDULE OF PERFORMANCE Tasks 1 shall be completed within 30 calendar days of the "Notice to Proceed" from the City. Tasks 2 shall be completed between of February 01" and May 01" of each contract year. Task 3 shall be completed between June 01" and August 0151 of each contract year. Task 4 shall be completed between February 01" and April 30`1 of each contract year Task 5 shall be completed within 14 working days of the request. For Tasks 2-4 reports shall be submitted to the Contract Officer according to the timetable set forth below. Number of locations requested Deadline for Report Submittal 1-2 Locations 5 work days 3-10 Locations 10 work days 10-25 Locations 20 work days 25-50 Locations 40 work days EXHIBIT "D" TO CONTRACT SERVICES AGREEMENT FSM76/099999-3000/216066 V 2 6/14/96 ved Revi :MOM 16 MINUTE ORDER NO. APPROVING A ONE-YEAR CONTRACT SERVICES AGREEMENT WITH COUNTS UNLIMITED, IN AN AMOUNT NOT TO EXCEED $5,000.00, FOR THE CITYWIDE TRAFFIC VOLUME COUNTING AND SPEED SURVEY PROGRAM, WITH A ONE-YEAR EXTENSION OPTION, AT STAFF'S DISCRETION, CITY PROJECT NO. 00-23 I HEREBY CERTIFY that this Minute Order, approving a one-year Contract Services Agreement with Counts Unlimited, in an amount not to exceed $5,000.00, for the Citywide Traffic Volume Counting and Speed Survey Program, with a one-year extension option, at staff's discretion, City Project No. 00-23, was approved by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 15th day of November 2000. PATRICIA A. SANDERS City Clerk