Loading...
HomeMy WebLinkAbout20028 - RESOLUTIONS - 4/18/2001 RESOLUTION NO. 20028 OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, ' CALIFORNIA,APPROVING RESOLUTION REQUESTING FULL COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS (CVAG) REGIONAL MEASURE A FUNDING FOR THE GENE AUTRY TRAIL ROADWAY WIDENING AT THE WHITEWATER WASH NORTH OF VISTA CHINO AND 75% CVAG FUNDING TOWARDS PALM SPRINGS LOCAL GRANT MATCH REQUIREMENTS FOR RAILROAD BRIDGE WIDENINGS AT INDIAN CANYON DRIVE AND GENE AUTRY TRAIL SOUTH OF INTERSTATE 10. WHEREAS, the City of Palm Springs has received two federal grants to widen two railroad bridges south of Interstate 10: 1. Gene Autry Trail for$1,842,000 in STIP funds and 2. Indian Canyon Drive for $1,955,000 in HBRR funds; and WHEREAS,the City of Palm Springs wishes to delay construction of the expensive Gene Autry Trail bridge crossing of the Whitewaterwash, north of Vista Chino(estimated by CVAG at$32 Million- $16 Million in Measure A funds- $16 Million in Palm Springs funds) until a future Measure A Phase 2 program ; and WHEREAS, the City of Palm Springs wishes to proceed with roadway widening to up to six lanes on Gene Autry Trail at the Whitewater wash to accommodate projected large traffic volumes using full Regional Measure A funding from CVAG in trade for relinquishment of the expensive bridge construction; and WHEREAS, the City of Palm Springs wishes to receive 75% CVAG Regional Measure A funding assistance towards the local Palm Springs grant match for the two federal (STIP and HBRR) grants for the railroad bridge widenings on Gene Autry Trail and Indian Canyon Drive due to the grants the City received for the bridges, thereby saving CVAG $3.8 Million in Measure A funds. NOW THEREFORE BE IT RESOLVED that the City Council of the City of Palm Springs requests: 1. That the expensive bridge construction on Gene Autry Trail, north of Vista Chino at the Whitewater river wash, be postponed by CVAG to a future Measure A program. 2. That CVAG approve Regional Measure A funding to cover the full cost to construct the at-grade roadway widening of Gene Autry Trail, north of Vista Chino, to provide up to six lanes at the Whitewater river wash. 3. That CVAG approve Regional Measure A funding to cover 75% of the local Palm Springs match costs for the two grant funded railroad bridge widenings at Gene Autry Trail and at Indian Canyon Drive, south of Interstate 10. The above requests are made possible due to the approximate $20 Million in combined Measure A savings generated by the City of Palm Springs by this action by postponing the construction of the ' Gene Autry Trail bridge crossing of the Whitewater riverwashtoa possible future MeasureAprogram; and the City's acquisition of outside federal grants for two railroad bridge widenings.These significant savings can be passed on by CVAG to other Coachella Valley regional projects that can now be funded under the current 20-year Measure A Program prior to it's expiration on June 30, 2009. add Resolution 20028 Resolution- CVAG Measure A Funds- Page 2 Adopted this 1 utjy day of Apri i , 2001. AYES: Members Hodges, Jones, Reller-Spurgin and Mayor Kleindienst NOES: None ABSENT: Member Oden ATTEST: CITY OF PALM SPRINGS, CALIFORNIA City Clerk City Manaee REVIEWED &APPROVED AS TO FORM H:\Users\BobM\Data\Document\CVAG.Measure A Resolution.4-18-01.res.wpd 3 � �