RESOLUTION NO. 17591
r
OF THE CITY COUNCIL OF THE CITY OF PALM
SPRINGS, CALIFORNIA, PREQUALIFYING CONTRACTOR
TEAMS, UNDER A TWO-STEP BID PROCESS, TO SUBMIT
STEP-II CONSTRUCTION BIDS ON THE AIRPORT ACCESS
CONTROL SYSTEM, CP t90-24.
WHEREAS the City selected a two-step process to be utilized in the bidding of
the Airport Access Control System, City Project ►90-24; and
WHEREAS the Requests For Qualifications for Step I were advertised on a local
and national basis; and
WHEREAS 13 of the 44 packages distributed were submitted on the date and time
so designated; and
WHEREAS a Qualification Review Panel reviewed the proposals based on
established criteria and has made its recommendation to the City Council,
' NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs,
California, as follows:
Section 1. Under the Step I submittal process, the following contractor
teams are hereby prequalified to provide Step II bids for the
Airport Access Control System:
Holmes 8 Narver, Inc.
JEC, Inc. /SAIC
JA Jones Construction/Lockwood Greene Engineers
Baldi Bros. /LINX Tech.
Baldi Bras. /SAIC
Baldi Bros. /EG&G Aviation Security
Transpac Group/LINX
• Subject to receipt of Class "A" License prior to award of bid.
Section 2. The following contractor teams are found to be nonresponsive
and are hereby rejected:
Adamo Construction/Dymaxion, Inc.
Transpac Group/Maris
Turner Construction/VATEC
SEACOM International
Baldi Bras. /Wackenhut
Baldi Bros. /McMillan Technology
ADOPTED this 17th day of July 1991
AYES: Councilmembers Hodges, Murawski , Neel and Mayor pro tem Broich
NOES: None
ABSENT: Mayor Bono