Loading...
HomeMy WebLinkAbout17591 - RESOLUTIONS - 7/17/1991 �r RESOLUTION NO. 17591 r OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, PREQUALIFYING CONTRACTOR TEAMS, UNDER A TWO-STEP BID PROCESS, TO SUBMIT STEP-II CONSTRUCTION BIDS ON THE AIRPORT ACCESS CONTROL SYSTEM, CP t90-24. WHEREAS the City selected a two-step process to be utilized in the bidding of the Airport Access Control System, City Project ►90-24; and WHEREAS the Requests For Qualifications for Step I were advertised on a local and national basis; and WHEREAS 13 of the 44 packages distributed were submitted on the date and time so designated; and WHEREAS a Qualification Review Panel reviewed the proposals based on established criteria and has made its recommendation to the City Council, ' NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs, California, as follows: Section 1. Under the Step I submittal process, the following contractor teams are hereby prequalified to provide Step II bids for the Airport Access Control System: Holmes 8 Narver, Inc. JEC, Inc. /SAIC JA Jones Construction/Lockwood Greene Engineers Baldi Bros. /LINX Tech. Baldi Bras. /SAIC Baldi Bros. /EG&G Aviation Security Transpac Group/LINX • Subject to receipt of Class "A" License prior to award of bid. Section 2. The following contractor teams are found to be nonresponsive and are hereby rejected: Adamo Construction/Dymaxion, Inc. Transpac Group/Maris Turner Construction/VATEC SEACOM International Baldi Bras. /Wackenhut Baldi Bros. /McMillan Technology ADOPTED this 17th day of July 1991 AYES: Councilmembers Hodges, Murawski , Neel and Mayor pro tem Broich NOES: None ABSENT: Mayor Bono ATTEST:_., CI( OF PA INGS ALIFORNIA BY... c- ..� ..�.._. City Clerk City Man gar " REVIEWED & APPROVED 110. RES T tCC'q•