HomeMy WebLinkAbout9/6/2000 - STAFF REPORTS (10) Date: September 6, 2000 To: City Council From: City Engineer CONSTRUCTION CHANGE ORDER NO. 4 TO 4-CON ENGINEERING, INC. RECOMMENDATION: That the City Council approve Construction Change Order No. 4 to 4-Con Engineering Inc., in the amount of$6,951.00 for a total contract cost of $890,535.21, for additional pavement work, Heritage Trail Bikeway, City Project# 93-49, BACKGROUND: On March 15, 2000 City Council awarded 4-Con Engineering Inc., the contract for City Project#93-49, Heritage Trail Bikeway Project. The Project consists of the construction of a decorative concrete bikeway extending from Francis Stevens Park to Baristo Rd. along Belardo Rd. As part of this project, new curbs and gutters were placed from Alejo Rd. to Amado Rd. After placement of the new curb and gutter, it was found that the existing asphalt did not match up properly to the new improvements. Because of this, additional removal and replacement of asphalt paving is required in order to achieve 'cross fall' from the centerline of the street. Due to the changing of these pavement elevations, it has also become necessary to raise two additional sanitary sewer manholes to grade. The approved plans for the bikeway also included several decorative concrete crosswalks. After construction began, the design engineer (Sanborn A & E), determined that three of the crosswalks would be deleted from the project because they were not essential to the theme of the Heritage Trail. This change order reflects these deletions. The total adjustment to the agreement for these services is $6,951.00. Sufficient funds to cover this change order are available in account number 134- 4498-50135 Heritage Trail Bikeway. �411-L DAVID J. BARAKIAN City Engineer APPROVED: ,,.� Pity Manager ATTACHMENTS: ANIMM OY ME OF FIW�1. Minute Order 2. Change Order No. 1 �r' 8� CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: 4-Con Engineering, Inc. Date: 8/9/2000 14771 Washington Dr. Project No. 93-49 Fontana, CA 92234.2217 Project Name: Heritage Trail Bikeway Project Change Order No. Four (4) Attn: Rick Garabedian Contract Purchase No: 909370 Account Numbers: 134-4498-50135 Agr.# 4206 M.O.# 6588 Res. # A. CHANGES IN WORK: Increase to Contract Quantities: Bid Schedule A: Item No. 8 Construct 3" Asphalt Concrete Pavement 3731 SF Item No. 19 Adjust Utilities To Grade (Sewer Manholes) 2 EA New Items: A. Removal and Disposal of AC pavement 3731 SF Decrease to Contract Quantities: Bid Schedule A: Item No. 14 Construct 6" Stamped PCC - Colored III 212)SF Item No. 15 Construct 6" PCC Paving (438)SF New Items: A. Removal and Disposal of AC Pavement (1650)SF B. CHANGES IN COST: Increase to Contract Quantities: Bid Schedule A: Item No. 8 Asphalt Concrete 344.75 SF @ $5.00/SF $1,723.75 3386.25 SF @ $3.80/SF -12,867.75 Item No. 19 Adjust Sewer Manholes 2 EA @ $1,000.00/EA $2,000.00 * Renegotiated unit price for quantities in excess of 125% of original estimate New Items Item A. AC Removal 3731 SF @ $1.50/SF $5,596.50 Decrease to Contract Quantities Bid Schedule A: Item No. 14 6" Stamped PCC 1212 SF @ $8.00/SF ($9,696.00) Item No. 15 6" PCC Paving 438 SF @ $7.00/SF I$3,066.00) New Items: Item A. AC Removal 1650 SF @ $1.50/SF (2,475.00) TOTAL NET CHANGE ORDER AMOUNT $6,951.00 9#4 2a C. REASONS FOR CHANGES: Existing asphalt pavement does not match up with new curb and gutter in many locations along Belarado Rd. from approximately station 53+75 to Alejo Rd. Plans indicated a 1 FT patch of AC along new curb improvements; however, after placement of new curb and gutter, it became evident that additional removal and replacement of paving is required per revised drawings to allow for cross flow. Two sewer manholes that were not indicated on project drawings require adjustment to grade. These manholes are located at approximately stations 56+60 and 59+00. It was determined by the design engineer that three of the decorative concrete crosswalks are not essential to the theme of the Heritage Trail. Therefore, they are being deleted from the project. The three crosswalks that are being deleted are located at: across Belardo Rd. at Tahquitz Canyon Way, across Belardo Rd. at Amado Rd. and across Amado Rd. at Belardo Rd. Seven (7) additional working day will be added for the completion of this extra work NOTE: No additional markup will be added to any items in this Contract Change Order. All costs Per each item are final. D. SOURCE OF FUNDS: Funds are available in the following account: Acct# 134-4498-50135 Heritage Trail Bikeway Summary of Costs Contract Time Original Contract Amount: $873,781.35 Original Completion Date: August 23, 2000 This Change Order: $6,951.00 Days Added for this C.C.O.: -7- Previous Change Order(s): $9,802.86 Previous Days Added: -8- Revised Contract Amount: $890,535.21 Revised Completion Date: September 14, 2000 1 have received a copy of this Change City Approval: Order and the above totals are acceptable to he tractor. Submitted ? (. DateF'41 By Fi d En ine 'ing Supervisor ' Approved By Date City Engineer Date_ Approved by Date City Manager Distribution: Original Conformed Copies Conformed-File Copy Engineering (1) Engineering File (1) Finance (1) Engineering Field Inspector (1) Contractor (1) Engineering Field Supervisor (1) City Clerk (1) Purchasing Agent (1) 2of2 ��,A MINUTE ORDER NO. APPROVING CONSTRUCTION CHANGE ORDER NO. 4 TO 4-CON ENGINEERING, INC., IN THE AMOUNT OF $6,951.00 FOR A TOTAL CONTRACT COST OF $890,535.21, FOR ADDITIONAL PAVEMENT WORK FOR HERITAGE TRAIL BIKEWAY, CITY PROJECT NO. 93-49 I HEREBY CERTIFY that this Minute Order approving Construction Change Order No. 4 to 4-Con Engineering, Inc., in the amount of$6,951.00 for a total contract cost of $890,535.21, for additional pavement work for Heritage Trail Bikeway, City Project No. 93-49, was approved by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 6" day of September 2000. PATRICIA A. SANDERS City Clerk