HomeMy WebLinkAbout7/7/1999 - STAFF REPORTS (24) DATE: July 7, 1999 TO: City Council FROM: City Engineer CONSTRUCTION CHANGE ORDER NO. ONE TO TAPUZ ENTERPRISES, INC. RECOMMENDATION: That the City Council approve Construction Change Order No. One to Tapuz Enterprises, Inc., for an increase of $13,656.88 for the Mid-Valley Parkway - Phase 1, Landscape Improvements Project, City Project No. 95-38. BACKGROUND: On April 7, 1999, City Council of the City of Palm Springs awarded Tapuz Enterprises, Inc. the contract for the Mid-Valley Parkway - Phase 1, Landscape Improvements Project. In reviewing the specifications for the proposed irrigation water main for the landscaping, Desert Water Agency (DWA) and the City's consulting engineer, RBF & Associates, agreed that the proposed 1 1/2 in. irrigation water main would not provide the necessary static water pressure for the irrigation system. This is due to the change from domestic to reclaimed water and information from DWA that the reclaimed water line has lower pressure than the domestic line. The irrigation water main will be modified as follows: Change 1 1/2 in. Sch 40 PVC mainline on the south side of Mesquite Avenue from Sta. 23 + 00 to Sta. 42 + 00 to 2 1/2 in. Sch 40 PVC, change 1 1/2 in. Sch 40 PVC mainline in the median from Sta. 42 + 00 to Sta. 72 + 00 to 2 1/2 in. Sch 40 PVC and change all 11/2 in. Sch 40 PVC mainline from the median to monument planter areas to 2 in. Sch 40 PVC. An adjustment of contract time (Contract Extension) will be made at a later dale between the City and the contractor, Tapuz Enterprises, Inc. An agreement as to price could not be reached with Tapuz Enterprises, Inc., on this item as they were asking in excess of$29,000.00. Staff proposes to proceed, therefore, on an Accumulation of Costs basis, in accordance with the Standard Specifications. The amount of this change order is based upon Staff estimates of time and material to complete the work. If additional time and material is required, an additional change order will be prepared. The net increase for this change order totals $13,656.88. Funds are available in account number: 4497-50113, Mid-Valley Parkway Phase 1 DAVID J. BAf AKIAN City Engineer APPROVED: City Manager ATTACHMENTS: Minute Order Change Order No. One CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: Tapuz Enterprises Inc. Date: June 21 1999 P.O.Box 18500 Project No.: C.P. 95-38 Encino, CA 91416-8500 Project Name: Mid-Valley Parkway- Phase 1 Landscape Improvements Change Order No.: One (1) Attn: Tomar Rotholz Contract Purchase No.: 906485 Account Number(s): 4497-50113 Agr.#4090 M.O.# 6380 Res.# i A.CHANGES IN WORK: Increase to Contract New Items: Item Description No. A 1 1/2 in to 2 in. Irrigation Pipe B 1 %in to 2%in.Irrigation Pipe C Fittings for 2 in, and 2''A in. Irrigation Pipe D Markup for Irrigation Pipe and Fittings E Labor to Install 2 in.and 21h in.Irrigation Pipe F Markup for Labor G Restocking Fee for 1 'h in.Irrigation Pipe and Fittings B. CHANGES IN CONTRACT COST: Increase to Contract New Items: Estimated Quantities and Costs per the Standard Specifications for Public Works Construction (Greenbook), 1997 Edition, Sec. 3-3, Extra Work, under the Accumulation of Costs Item Description No. A 1 ''A in to 2 in. Irrigation Pipe 2,000 LF @ $0.15 $ 300.00 B 1 '/2 in to 2'/2 in. Irrigation pipe 5,550 LF @ $0.48 $ 2,664.00 C Fittings for 2 in. and 21/2 in. Irrigation Pipe Lump Sum $ 1,063.00 D Markup for Irrigation Pipe and Fittings $4,027.00 @ 15% $ 604.05 E Labor to Install 2 in. and 21/2 in.Irrigation Pipe 3 Days for Superintendent 24 hrs @$36.99 $ 887.76 3 Days for Foreman 24 hrs @$31.76 $ 762.24 3 Days for Laborers(6 each) 144 hrs @ $27.22 $ 3,919.68 F Markup for Labor $5,569.68 @ 24% $ 1,336.72 G Restocking Fee for 1 '/2 in.Irrigation Pipe Lump Sum $ 2,119.43 Total $ 13,656.88 TOTAL NET CHANGE ORDER = $13,656.88 C.REASON FOR CHANGE: In reviewing the specifications for the proposed irrigation water main for the landscaping, Desert Water Agency (DWA) and the City's consulting engineer, RBF &Associates, agreed that the proposed 1 'f in. irrigation water main would not provide the necessary static water pressure for the irrigation system. This is due to the change from domestic to reclaimed water and information from DWA that the reclaimed water line has lower pressure that the domestic line.The irrigation water main will be modified as follows: Change 1 1/2 in. Sch 40 PVC mainline on the south side of Mesquite Avenue from Sta. 23 + 00 to Sta. 42 + 00 to 2 34 in. Sch 40 PVC, change 1 '/2 in. Sch 40 PVC mainline in the median from Sta. 42 + 00 to Sta. 72 + 00 to 2 1/2 in. Sch 40 PVC and change all 11/2 in. Sch 40 PVC mainline from the median to monument planter areas to 2 in.Sch 40 PlI'C An adjustment of contract time (Contract Extension) will be made at a later date between the City and the contractor,Tapuz Enterprises, Inc. D.SOURCE OF FUNDS: Mid-Valley Parkway- Phase 1 =Account Number: 4497 - 50113 = $13, 656.88 June 21, 1999 City Project 95-38 Mid-Valley Parkway Phase 1, Landscape Improvements Change Order No. 1 Page 2 of 2 Summary of Costs Contract Time Original Contract Amount: $ 538,740.75 Original Completion Date: Sept 1, 1999 This Change Order: $ 13,656.88 Days Added for this C.C.O.: 5 Previous Change Order(s): $ 0.00 Previous Days Added: 0 Revised Contract Amount: $ 552,397.63 Revised Completion Date: Sept. 9, 1999 1 have received a copy of this Change City Approval: Order and the above ESTIMATED PRICES are acceptable to the contractor. Submitted By Date By Field Engineering Supervisor Approved By_ Date Title City Engineer Approvedby Date Date City Manager Distribution: Original Conformed Conies Conformed-File Copy Engineering (1) Engineering File (1) Finance (1) Engineering Field Inspector (1) Contractor (1) Engineering Field Supervisor 0) City Clerk (1) Purchasing Agent (1) a.3�3 MINUTE ORDER NO. APPROVING CHANGE ORDER NO. I TO TAPUZ ENTERPRISES, INC., FOR AN INCREASE OF $13,656.88 FOR THE MID- VALLEY PARKWAY PHASE 1, LANDSCAPE IMPROVEMENTS, CITY PROJECT NO. 95-38 I HEREBY CERTIFY that this Minute order approving Change Order No. I to Tapuz Enterprises, Inc., for an increase of$13,656.88 for the Mid-V alley Parkway Phase 1, Landscape Improvements , City Project No. 95-38, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 7"' day of July 1999. PATRICIA A. SANDERS Acting City Clerk