Loading...
HomeMy WebLinkAbout7/7/1999 - STAFF REPORTS (14) CO - DATE: July 7, 1999 TO: City Council FROM: City Engineer AMENDMENT NO. 1 TO SECOR INTERNATIONAL, INC. RECOMMENDATION: That the City Council approve Amendment No.1 to SECOR International, Inc., for an increase of $9,007.00 for the Underground Storage Tank Removals and Replacement - Corrective Action for Contamination, City Project 95-17. BACKGROUND: On March 17, 1999, City Council of the City of Palm Springs awarded SECOR International, Inc., the contract for the Underground Storage Tank Removals and Replacement - Corrective Action for Contamination project. The original work plan submitted by the City's consulting engineer, Tait & Associates and approved by the County of Riverside, Department of Environmental Health specified GeoProbe boring for 2 locations at the City Yard. The contractor, SECOR International, encountered contamination at increasing levels as the boring progressed. The GeoProbe did not reach the 40 ft. boring depths per the work plan. Because of the contamination found and the 40-foot maximum depth that the GeoProbe can reach, a HollowStemAuger must be used to continue the exploration to greater depths. Credit for boring depth not used and laboratory analysis (samples not taken) were given to the City ($1,091.00). Tait & Associates and SECOR International. recommended to the County of Riverside, Department of Environmental Health to use a Limited Access Rig (LAR) Hollow Stem Auger to continue to find the horizontal and vertical limits of the contamination. Tait submitted to the County, an amended work plan for approval. The amended work plan cost estimate by SECOR totals$5,149.00. The net increase to the amended work plan is$4,058.00 In Schedule A, the City requested and received from SECOR International a cost estimate of $4,949.00 for additional boring depths of 80 ft. (40 x 2) and soil analysis, in the event that contamination is found deeper than what the amended work plan calls for. The increase for this change order totals $9,007. Funds are available in account number 540-5904-48622 (Loss Containment) . Application for reimbursement from the State Dept. of Environmental Health has been made. The reimbursement is expected to cover the total amount. Yr' DAVID J. ARAKiAN f City Engine i -_ APPROVED: t l Manager b ATTACHMENTS: 1. Minute Order 2. Amendment No. 1 to Agreement No. 4084 AMENDMENT NO. 1 TO AGREEMENT NO. 4084 ' ♦ A L UNDERGROUND STORAGE TANK REMOVALS AND REPLACEMENT - CORRECTIVE ACTION FOR CONTAMINATION CITY PROJECT 95-17 The following article of Agreement No. 4084 is hereby amended to read as follows: 1.0 Section 2.1, Contract Sum, is hereby amended to provide a maximum contract amount of $19,139.00, an increase of$9,007.00. 2.0 Exhibit "A", Scope of Services, is hereby amended by adding the following: Task 2 - Drilling, Soil Sampling and Field Consulting Two 40 feet deep (or refusal) Hollow Stem Auger bores will be advanced with at least one beneath the canopy making a Limited Access Rig (LAR) Hollow Stem Auger necessary, with sampling at five foot intervals. Any drilling spoil generated by the advancement of the boreholes will be contained in 55-gallon drums, appropriately labeled and held onsite for disposal. Upon completion of the boring, each hole will be backfilled with a bentonite cement grout over the entire depth. The drilling prices provided also include the necessary mobilization and demobilization of the drilling equipment and personnel. Credit to the City for drilling and sampling not used in the original Scope of Services will be applied in the amended work. In Bid Schedule A, Contractor to continue to drill two additional 40 foot depths. This work would only be performed if necessary as dependent on soil concentration encountered and Riverside County Department of Environmental Health requirements. The additional work to continue drilling includes sampling, laboratory, drums/disposal of soil and water. Contractor shall provide a staff level engineer or geologist to supervise the drilling operations, collect the soil samples, develop the soil boring log, and ensure project completion to the satisfaction of the City. Task 3 - Laboratory Analysis Contractor will provide for an onsite mobile laboratory which can conduct analysis under State certification for gasoline and diesel fuels by EPA Test Method 8015 Modified and benzene, toluene, ethyl benzene, total xylene and MTGE. utilizing EPA Test Method 8020. SECOR will take 16 soil samples using the certified mobile laboratory. 3.0 Exhibit "B", Schedule of Compensation is hereby amended by adding and decreasing the following: Payments for work under the Contract Services Agreement No. 4084 shall be made Amendment No. 1 to Secor's Agreement No. 4084 July 7, 1999 Page 2 on a time and materials basis, in accordance with the attached Fee Schedule . Total cost will not exceed the following: 2. Mobilization Lump Sum $ 460.00 Bores 80 Ft. @ $18.00 $ 1,440.00 Soil Sampling 10 Ea @ $100.00 $ 1,000.00 Field Consulting 9 Hrs. @ $65.00 $ 585.00 3. Laboratory Analysis (Samples) 16 Ea @ $104.00 $ 1,664.00 Sub-Total $ 5,149.00 2. Bores 28 Ft. @ $ 18.00 ($ 504.00) 3. Laboratory Analysis (Samples) 5 Ea @ $104.00 ($ 520.00) 4. Report Preparation Credit ($ 67.00) Sub-Total ($ 1,091.00) Bid Schedule A 2. Per Diem 1 Day @ $260.00 . $ 260.00 Bores 80 Ft. @ $18.00 $ 1,440.00 Soil Sampling 10 Ea @ $100.00 $ 1,000.00 Field Consulting 9 Hrs. @ $65.00 $ 585.00 3. Laboratory Analysis (Samples) 16 Ea @ $104.00 $ 1,664.00 Sub-Total $ 4,949.00 Grand Total not to exceed $ 9,007.00 Except as specifically amended by this Amendment, all items and provisions of Agreement No. 4084, approved by the City Council on Mar. 19, 1999, Minute Order No. 6365, remains in full force and effect. Dated this Day of 1999. ATTEST: CITY OF PALM SPRINGS A municipal corporation City Clerk City Manager APPROVED AS TO FORM: City Attorney 1 �� Check One: Individual _Partnership 1 Corporation CONTRACTOR: (Corporations require two signatures: SECOR INTERNATIONAL, INC. One from each of the following: A. Chairman of the Board, President, By: any Vice-President; AND B: Secretary, A. Notarized Signature Assistant Secretary, Treasurer, Assistant Treasurer, or Chief Financial Officer) Print Name&Title By: B. Notarized Signature Print Name&Title Mailing Address: MINUTE ORDER NO. APPROVING AMENDMENT NO. I TO SECOR INTERNATIONAL, INC., FOR AN INCREASE OF $9,007.00 FOR THE UNDERGROUND STORAGE TANK REMOVALS AND REPLACEMENT - CORRECTIVE ACTION FOR CONTAMINATION, CITY PROJECT NO. 95-17 I HEREBY CERTIFY that this Minute Order approving Amendment No. 1 to Secor International, Inc., for an increase of $9,007.00 for the Underground Storage Tank Removals and Replacement - Corrective Action for Contamination, City Project No. 95-17, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 7°i day of July, 1999. PATRICIA A. SANDERS Acting City Clerk