HomeMy WebLinkAbout8/2/2000 - STAFF REPORTS (16) DATE: August 2, 2000
TO: City Council
FROM: City Engineer
CONTRACT SERVICES AGREEMENT WITH SAFE MOVES FOR THE TRAFFIC
SAFETY EDUCATION PORTION OF THE PEDESTRIAN AND BICYCLE SAFETY
PROJECT
RECOMMENDATION:
That the City Council approve a Contract Services Agreement with Safe Moves, in
the amount of$80,400.00, for the design, implementation and presentation of
Pedestrian and Bicycle Education programs, City Project No. 2000-03.
BACKGROUND
Because of a growing occurrence of pedestrian related collisions, the ever
increasing promotion of"clean air" transit modes like walking, biking and public
transit and the increasing traffic in the area, the Engineering Department has been
attempting to obtain funding from the State of California, Business, Transportation
and Housing Agency, Office of Traffic Safety (OTS) for a pedestrian and bicycle
education program. An education program that would reach out to the community,
providing for interactive training in our most deficient age groups, youth under 14
years of age and seniors over the age of 65 is projected to achieve positive safety
results.
On May 25, 2000, the City received approval for the program from OTS. A program
has been designed in conjunction with OTS utilizing a consultant that has
implemented similar OTS funded programs in the State. The proposed amount for
this contract will provide our community with 100 classroom workshops for grade
school age children, 20 school based bicycle rodeos, 20 grade school parent
workshops, 8 community bicycle rodeos, and 192 Older Adult workshops spread out
over the next two years.
Staff recommends that the City Council approve a Contract Services Agreement
with Safe Moves in an amount of$80,400.00. Sufficient funds are available in
account No. 261-3200-52021. This contract is 100% funded from the OTS, PS
PABS grant.
DAVID J. BARAKIAN
City Engineer
APPROVED:
tty Mari er
ATTACHEMENTS: REVIEWED BY DEn OF RNMICE
l
1. Minute Order G
2 . Contract Services Agreement with Safe Moves
r�A
CITY OF PALM SPRINGS
Engineering Division
CONTRACT SERVICES AGREEMENT FOR
Professional Traffic Education Programs
in conjunction with
"Palm Springs Pedestrian & Bicycle Safety" Project
City Project 2000-03
THIS CONTRACT SERVICES AGREEMENT(herein"Agreement"), is made and entered into this
day of , 19, by and between the CITY OF PALM SPRINGS, a municipal corporation,
(herein "City")and Safe Moves, (herein"Contractor"). (The term Contractor includes professionals performing in a
consulting capacity.) The parties hereto agree as follows:
1.0 SERVICES OF CONTRACTOR
1.1 Scope of Services. In compliance with all terms and conditions of this Agreement, the
Contractor shall provide those services specified in the "Scope of Services" attached hereto as Exhibit "A" and
incorporated herein by this reference,which services may be referred to herein as the "services"or "work"hereunder.
As a material inducement to the City entering into this Agreement, Contractor represents and warrants that Contractor
is a provider of first class work and services and Contractor is experienced in performing the work and services
contemplated herein and, in light of such status and experience, Contractor covenants that it shall follow the highest
professional standards in performing the work and services required hereunder and that all materials will be of good
quality, fit for the purpose intended. For purposes of this Agreement, the phrase"highest professional standards" shall
mean those standards of practice recognized by one or more first-class firms performing similar work under similar
circumstances.
1.2 Contractor's Proposal. The Scope of Service shall include the Contractor's proposal or bid
which shall be incorporated herein by this reference as though fully set forth herein. In the event of any inconsistency
between the terms of such proposal and this Agreement, the terms of this Agreement shall govern.
1.3 Compliance with Law. All services rendered hereunder shall be provided in accordance
with all ordinances, resolutions, statutes, rules, and regulations of the City and any Federal, State or local
governmental agency having jurisdiction in effect at the time service is rendered.
1.4 Licenses, Permits, Fees and Assessments. Contractor shall obtain at its sole cost and
expense such licenses, permits and approvals as may be required by law for the performance of the services required
by this Agreement. Contractor shall have the sole obligation to pay for any fees, assessments and taxes, plus
applicable penalties and interest, which may be unposed by law and arise from or are necessary for the Contractor's
performance of the services required by this Agreement, and shall indemnify, defend and hold harmless City against
any such fees, assessments, taxes penalties or interest levied, assessed or imposed against City hereunder.
1.5 Familiarity with Work. By executing this Contract, Contractor warrants that Contractor(a)
has thoroughly investigated and considered the scope of services to be performed, (b)has carefully considered how the
services should be performed, and (c) fully understands the facilities, difficulties and restrictions attending
performance of the services under this Agreement. If the services involve work upon any site, Contractor warrants
that Contractor has or will investigate the site and is or will be fully acquainted with the conditions there existing,
prior to commencement of services hereunder. Should the Contractor discover any latent or unknown conditions,
which will materially affect the performance of the services hereunder, Contractor shall immediately inform the City
FS2/296/099999-3000/2160684.2 6/14/96
Revised:09/01/98
1
of such fact and shall not proceed except at Contractor's risk until written instructions are received from the Contract
Officer,
1.6 Care of Work. The Contractor shall adopt reasonable methods during the life of the
Agreement to furnish continuous protection to the work, and the equipment, materials, papers, documents, plans,
studies and/or other components thereof to prevent losses or damages, and shall be responsible for all such damages,
to persons or property, until acceptance of the work by City, except such losses or damages as may be caused by
City's own negligence.
1.7 Further Responsibilities of Parties. Both parties agree to use reasonable care and diligence
to perform their respective obligations under this Agreement. Both parties agree to act in good faith to execute all
instruments, prepare all documents and take all actions as may be reasonably necessary to carry out the purposes of
this Agreement. Unless hereafter specified, neither party shall be responsible for the service of the other.
1.8 Additional Services. City shall have the right at any time during the performance of the
services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of Services or
make changes by altering, adding to or deducting from said work. No such extra work may be undertaken unless a
written order is first given by the Contract Officer to the Contractor, incorporating therein any adjustment in(i) the
Contract Sum, and/or (ii) the time to perform this Agreement, which said adjustments are subject to the written
approval of the Contractor. Any increase in compensation of up to five percent(5%)of the Contract Sum or$25,000;
whichever is less, or in the time to perform of up to one hundred eighty(180) days may be approved by the Contract
Officer. Any greater increases, taken either separately or cumulatively must be approved by the City Council. It is
expressly understood by Contractor that the provisions of this Section shall not apply to services specifically set forth
in the Scope of Services or reasonably contemplated therein. Contractor hereby acknowledges that it accepts the risk
that the services to be provided pursuant to the Scope of Services may be more costly or time consuming than
Contractor anticipates and that Contractor shall not be entitled to additional compensation therefore.
1.9 Special Requirements. Additional terms and conditions of this Agreement, if any, which
are made a part hereof are set forth in the "Special Requirements" attached hereto as Exhibit "B" and incorporated
herein by this reference. In the event of a conflict between the provisions of Exhibit "B" and any other provisions of
this Agreement, the provisions of Exhibit "B" shall govern.
2.0 COMPENSATION
2.1 Contract Sum. For the services rendered pursuant to this Agreement,the Contractor shall
be compensated in accordance with the "Schedule of Compensation" attached hereto as Exhibit "C" and incorporated
herein by this reference, but not exceeding the maximum contract amount of Eighty Thousand Four Hundred Dollars
00/100( 80 400.00)(herein "Contract Sum"), except as provided in Section 1.8. The method of compensation may
include: (i) a lump sum payment upon completion, (ii) payment in accordance with the percentage of completion of
the services, (iii) payment for time and materials based upon the Contractor's rates as specified in the Schedule of
Compensation, but not exceeding the Contract Sum or(iv)such other methods as may be specified in the Schedule of
Compensation. Compensation may include reimbursement for actual and necessary expenditures for reproduction
costs, telephone expense, transportation expense approved by the Contract Officer in advance, and no other expenses
and only if specified in the Schedule of Compensation. The Contract Sum shall include the attendance of Contractor at
all project meetings reasonably deemed necessary by the City; Contractor shall not be entitled to any additional
compensation for attending said meetings.
2.2 Method of Payment. Unless some other method of payment is specified in the Schedule of
Compensation, in any month in which Contractor wishes to receive payment, no later than the first(1st)working day
FS22561099999-300012160684.2 G/14/96
Revised:09/01/98
2
1
of such month, Contractor shall submit to die City in the form approved by the Clty's Director of Finance, an invoice
for services rendered prior to the date of the invoice. Except as provided in Section 7.3, City shall pay Contractor for
all expenses stated thereon which are approved by City pursuant to this Agreement no later than the last working day
of the month.
3.0 PERPORMANCE SCHEDULE
3.1 Time of Essence. Time is of the essence in the performance of this Agreement.
3.2 Schedule of Performance. Contractor shall continence the services pursuant to this
Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s)
established in the "Schedule of Performance" attached hereto as Exhibit "D", if any, and incorporated herein by this
reference. When requested by the Contractor, extensions to the time period(s) specified in the Schedule of
Performance may be approved in writing by the Contract Officer but not exceeding one hundred eighty (180) days
cumulatively.
3.3 Force Majeure. The time period(s) specified in the Schedule of Performance for
performance of the services rendered pursuant to this Agreement shall be extended because of any delays due to
unforeseeable causes beyond the control and without the fault or negligence of the Contractor, including, but not
restricted to, acts of God or of the public enemy, unusually severe weather, fires, earthquakes, floods, epidemics,
quarantine restrictions, riots, strikes, freight embargoes, wars, litigation, and/or acts of any governmental agency,
including the City, if the Contractor shall within ten(10)days of the commencement of such delay notify the Contract
Officer in writing of the causes of the delay. The Contract Officer shall ascertain the facts and the extent of delay,
and extend the time for performing the services for the period of the enforced delay when and if in the judgment of the
Contract Officer such delay is justified. The Contract Officer's determination shall be final and conclusive upon the
parties to this Agreement. In no event shall Contractor be entitled to recover damages against the City for any delay
in the performance of this Agreement, however caused, Contractor's sole remedy being extension of the Agreement
pursuant to this Section.
3.4 Term. Unless earlier terminated in accordance with Section 7.8 of this Agreement, this
Agreement shall continue in full force and effect until completion of the services but not exceed one(1)year from the
date hereof, except as otherwise provided in the Schedule of Performance.
4.0 COORDINATION OF WORK
4.1 Representative of Contractor. The following principals of Contractor are hereby designated
as being the principals and representatives of Contractor authorized to act in its behalf with respect to the work
specified herein and make all decisions in connection therewith:
Pat Hines .
It is expressly understood that the experience,knowledge,capability and reputation of the foregoing principals
were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing principals shall be
responsible during the term of this Agreement for directing all activities of Contractor and devoting sufficient time to
personally supervise the services hereunder. For purposes of this Agreement, the foregoing principals may not be
replaced nor may their responsibilities be substantially reduced by Contractor without the express written approval of
City.
F52/276/099999-3000/2160684.2 6/14/96
Revised:09/01/98
3
PAY
4.2 Contract Officer. The Contract Officer shall be such person as may be designated by the
City Manager of City. It shall be the Contractor's responsibility to assure that the Contract Officer is kept informed of
the progress of the performance of the services and the Contractor shall refer any decisions, which must be made by
City to the Contract Officer. Unless otherwise specified herein, any approval of City required hereunder shall mean
the approval of the Contract Officer. The Contract Officer shall have authority to sign all documents on behalf of the
City required hereunder to carry out the terms of this Agreement.
4.3 Prohibition Against Subcontracting or Assignment. The experience, knowledge,capability
and reputation of Contractor, its principals and employees were a substantial inducement for the City to enter into this
Agreement. Therefore, Contractor shall not contract with any other entity to perform in whole or in part the services
required hereunder without the express written approval of the City. In addition, neither this Agreement nor any
interest herein may be transferred, assigned, conveyed, hypothecated or encumbered voluntarily or by operation of
law,whether for the benefit of creditors or otherwise, without the prior written approval of City. Transfers restricted
hereunder shall include the transfer to any person or group of persons acting in concert of more than twenty five
percent(25%)of the present ownership and/or control of Contractor, taking all transfers into account on a cumulative
basis. In die event of any such unapproved transfer, including any bankruptcy proceeding, this Agreement shall be
void. No approved transfer shall release the Contractor or any surety of Contractor of any liability hereunder without
the express consent of City.
The City's policy is to encourage the awarding of subcontracts to persons or entities with offices located
within the jurisdictional boundaries of the City of Palm Springs and, if none are available, to persons or entities with
offices located in the Coachella Valley("Local Subcontractors"). Contractor hereby agrees to use good faith efforts to
award subcontracts to Local Subcontractors, if Local Subcontractors are qualified to perform the work required. In
requesting for the City to consent to a subcontract with a person or entity that is not a Local Subcontractor, the
Contractor shall submit evidence to the City that such good faith efforts have been made or that no Local
Subcontractors are qualified to perform the work. Said good faith efforts may be evidenced by placing advertisements
inviting proposals or by sending requests for proposals to selected Local Subcontractors. The City may consider
Contractor's efforts in determining whether it will consent to it particular subcontractor. Contractor shall keep
evidence of such good faith efforts and copies of all contracts and subcontracts hereunder for the period specified in
Section 6.2.
4.4 Independent Contractor. Neither the City nor any of its employees shall have any control
over the manner, mode or means by which Contractor, its agents or employees, perform the services required herein,
except as otherwise set forth herein. City shall have no voice in the selection, discharge, supervision or control of
Contractor's employees, servants, representatives or agents, or in fixing their number, compensation or hours of
service. Contractor shall perform all services required herein as an independent contractor of City and shall remain at
all times as to City a wholly independent contractor with only such obligations as are consistent with that role.
Contractor shall not at any time or in any manner represent that it or any of its agents or employees are agents or
employees of City. City shall not in any way or for any purpose become or be deemed to be a partner of Contractor
in its business or otherwise or a joint venture or a member of any joint enterprise with Contractor.
5.0 INSURANCE, INDEMNIFICATION AND BONDS
5.1 Insurance. The Contractor shall procure and maintain, at its sole cost and expense, in a
form and content satisfactory to City, during the entire term of this Agreement including any extension thereof, the
following policies of insurance:
(a) Comprehensive General Liability Insurance. A policy of comprehensive general
liability insurance written on a per occurrence basis. The policy of insurance shall be in an amount not less than either
PS2/296/099999-3000/2160684 2 6/14196
Revised.09/01/98
4
(i) a combined single limit of$1,000,000 for bodily injury, death and property damage or(n)bodily injury limits of
$500,000 per person, $1,000,000 per occurrence and $1,000,000 products and completed operations and property
damage limits of$500,000 per occurrence. If the Contract Sum is greater than$100,000, the policy of insurance shall
be in an amount not less than$5,000,000 combined single limit.
(b) Worker's Compensation Insurance. A policy of worker's compensation insurance in
such amount as will fully comply with the laws of the State of California and which shall indemnify, insure and
provide legal defense for both the Contractor and the City against any loss, claim or damage arising from any injuries
or occupational diseases occurring to any worker employed by or any persons retained by the Contractor in the course
of carrying out the work or services contemplated in this Agreement.
(c) Automotive Insurance. A policy of comprehensive automobile liability insurance
written on a per occurrence basis in an amount not less than either (i) bodily injury liability limits of$500,000 per
person and$1,000,000 per occurrence and property damage liability limits of$250,000 per occurrence and$500,000
in the aggregate or (ii) combined single limit liability of$1,000,000. Said policy shall include coverage for owned,
non-owned, leased and hired cars.
(d) Additional Insurance. Policies of such other insurance, including professional liability
insurance, as may be required in the Special Requirements.
All of the above policies of insurance shall be primary insurance and shall name the City, its officers,
employees and agents as additional insureds, except that the City shall not be named as an additional insured for the
Worker's Compensation Insurance nor the Professional Liability Insurance. The insurer shall waive all rights of
subrogation and contribution it may have against the City, its officers, employees and agents and their respective
insurers. All of said policies of insurance shall provide that said insurance may not be amended or canceled without
providing thirty (30) days prior written notice by registered mail to the City. In the event any of said policies of
insurance are canceled, the Contractor shall, prior to the cancellation date, submit new evidence of insurance in
conformance with this Section 5.1 to the Contract Officer. No work or services under this Agreement shall continence
until the Contractor has provided the City with Certificates of Insurance or appropriate insurance binders evidencing
the above insurance overages and said Certificates of Insurance or binders are approved by the City.
All certificates shall name the City as additional insured(providing the appropriate endorsement), be signed
by an authorized agent of the insurer, and shall contain the following "cancellation" notice:
"CANCELLATION: Should any of the above described policies be cancelled before the expiration date
thereof, the issuing company shall mail an advance 30-day written notice to the Certificate holder named
herein."
The Contractor agrees that the provisions of this Section 5.1 shall not be construed as limiting in any way the
extent to which the Contractor may be held responsible for the payment of damages to any persons or property
resulting from the Contractor's activities or the activities of any person or persons for which the Contractor is
otherwise responsible.
In the event the Contractor subcontracts any portion of the work in compliance with Section 4.3 of this
Agreement, the contract between the Contractor and such subcontractor shall require the subcontractor to maintain the
same policies of insurance that the Contractor is required to maintain pursuant to this Section 5.1.
5.2 Indemnification. Contractor agrees to indemnify the City, its officers, agents and
employees against, and will hold and save them and each of them harmless from, any and all actions, suits, claims,
damages to persons or property, losses, costs,penalties, obligations, errors, omissions or liabilities, (herein"clans or
PS2/276/099999-3000/2160684.2 6/14/96
Revised 09/01/98
5
//A G
liabilities") that may be asserted or claimed by any person, firm or entity arising out of or in connection with the
negligent performance of the work, operations or activities of Contractor, its agents, employees, subcontractors, of
invitees, provided for herein, or arising from the negligent acts or omissions of Contractor hereunder, or arising from
Contractor's negligent performance of or failure to perform any term, provision, covenant or condition of this
Agreement, whether or not there is concurrent passive or active negligence on the part of the City, its officers, agents
or employees but excluding such claims or liabilities arising from the sole negligence or willful misconduct of the
City, its officers, agents or employees, who are directly responsible to the City, and in connection therewith:
(a) Contractor will defend any action or actions filed in connection with any of said
claims or liabilities and will pay all costs and expenses, including legal costs and attorneys' fees incurred in connection
therewith;
(b) Contractor will promptly pay any judgment rendered against the City, its officers,
agents or employees for any such claims or liabilities arising out of or in connection with the negligent performance of
or failure to perform such work, operations or activities of Contractor hereunder; and Contractor agrees to save and
hold the City, its officers, agents, and employees harmless therefrom;
(c) In the event the City, its officers, agents or employees is made a party to any action
or proceeding filed or prosecuted against Contractor for such damages or other claims arising out of or in connection
with the negligent performance of or failure to perform the work, operation or activities of Contractor hereunder,
Contractor agrees to pay to the City, its officers, agents or employees, any and all costs and expenses incurred by the
City, its officers, agents or employees in such action or proceeding, including but not limited to, legal costs and
attorneys' fees.
5.3 Performance Bond. Concurrently with execution of this Agreement, Contractor shall
deliver to City a performance bond in the sum of the amount of this Agreement, in the form provided by the City
Clerk, which secures the faithful performance of this Agreement, unless such requirement is waived by the Contract
Officer. The bond shall contain the original notarized signature of an authorized officer of the surety and affixed
thereto shall be a certified and current copy of his power of attorney. The bond shall be unconditional and remain in
force during the entire term of the Agreement and shall be null and void only if the Contractor promptly and faithfully
performs all terms and conditions of this Agreement.
5.4 Sufficiency of Insurer or Surety. Insurance or bonds required by this Agreement shall be
satisfactory only if issued by companies qualified to do business in California, rated "A" or better in the most recent
edition of Best Rating Guide, The Key Rating Guide or in the Federal Register, and only if they are of a financial
category Class VII or better,unless such requirements are waived by the City Manager or designee of the City("City
Manager") due to unique circumstances. In the event the City Manager determines that the work or services to be
performed under this Agreement creates an increased or decreased risk of loss to the City, the Contractor agrees that
the minimum limits of the insurance policies and the performance bond required by this Section 5 may be changed
accordingly upon receipt of written notice from the City Manager or designee;provided that the Contractor shall have
the right to appeal a determination of increased coverage by the City Manager to the City Council of City within ten
(10) days of receipt of notice from the City Manager.
6.0 REPORTS AND RECORDS
6.1 Reports. Contractor shall periodically prepare and submit to the Contract Officer such
reports concerning the performance of the services required by this Agreement as the Contract Officer shall require.
Contractor hereby acknowledges that the City is greatly concerned about the cost of work and services to be performed
pursuant to this Agreement. For this reason, Contractor agrees that if Contractor becomes aware of any facts,
circumstances, techniques, or events that may or will materially increase or decrease the cost of the work or services
F52/276/099999-3000/2160684.2 6/14/96
RcvisW.09/01/98
6
contemplated herein or, if Contractor is providing design services, the cost of the project being designed, Contractor
shall promptly notify the Contract Officer of said fact, circumstance, technique or event and the estimated increased or
decreased cost related thereto and, if Contractor is providing design services, the estimated increased or decreased cost
estimate for the project being designed.
6.2 Records. Contractor shall keep, and require subcontractors to keep,such books and records
as shall be necessary to perform the services required by this Agreement and enable the Contract Officer to evaluate
the performance of such services. The Contract Officer shall have full and free access to such books and records at all
times during normal business hours of City, including the right to inspect, copy, audit and make records and
transcripts from such records. Such records shall be maintained for a period of three(3)years following completion
of the services hereunder, and the City shall have access to such records in the event any audit is required.
6.3 Ownership of Documents. All drawings, specifications, reports, records, documents and
other materials prepared by Contractor, its employees, subcontractors and agents in the performance of this
Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer or upon the
termination of this Agreement, and Contractor shall have no claim for further employment or additional compensation
as a result of the exercise by City of its full rights of ownership of the documents and materials hereunder. Any use of
such completed documents for other projects and/or use of uncompleted documents without specific written
authorization by the Contractor will be at the City's sole risk and without liability to Contractor, and the City shall
indemnify the Contractor for all damages resulting therefrom. Contractor may retain copies of such documents for its
own use. Contractor shall have an unrestricted right to use the concepts embodied therein. All subcontractors shall
provide for assignment to City of any documents or materials prepared by them, and in the event Contractor fails to
secure such assignment, Contractor shall indemnify City for all damages resulting therefrom.
6.4 Release of Documents. The drawings, specifications, reports,records,documents and other
materials prepared by Contractor in the performance of services under this Agreement shall not be released publicly
without the prior written approval of the Contract Officer.
7.0 ENFORCEMENT OF AGREEMENT
7.1 California Law. This Agreement shall be construed and interpreted both as to validity and
to performance of the parties in accordance with the laws of the State of California. Legal actions concerning any
dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the Superior Court of the
County of Riverside, State of California,or any other appropriate court in such county, and Contractor covenants and -
agrees to submit to the personal jurisdiction of such court in the event of such action.
7.2 Disputes. In the event of any dispute arising under this Agreement, the injured party shall
notify the injuring party in writing of its contentions by submitting a claim therefor. The injured party shall continue
performing its obligations hereunder so long as the injuring party commences to cure such default within ten(10)days
of service of such notice and completes the cure of such default within forty-five(45)days after service of the notice,
or such longer period as may be permitted by the injured party; provided that if the default is an inunediate danger to
the health, safety and general welfare, such immediate action may be necessary. Compliance with the provisions of
this Section shall be a condition precedent to termination of this Agreement for cause and to any legal action, and such
compliance shall not be a waiver of any party's right to take legal action in the event that the dispute is not cured,
provided that nothing herein shall limit City's or the Contractor's right to terminate this Agreement without cause
pursuant to Section 7.8.
7.3 Retention of Funds. Contractor hereby authorizes City to deduct from any amount payable
to Contractor(whether or not arising out of this Agreement) (i) any amounts the payment of which may be in dispute
FS2/276/099999-3000/2160684.2 6/14/96
Revised:09/01/98
7
hereunder or which are necessary to compensate City for any losses, costs, liabilities, or damages suffered by City,
and (ii) all amounts for which City may be liable to third parties, by reason of Contractor's acts or omissions in
performing or failing to perform Contractor's obligation under this Agreement. In the event that any claim is made by
a third party, the amount or validity of which is disputed by Contractor, or any indebtedness shall exist which shall
appear to be the basis for a claim of lien, City may withhold from any payment due, without liability for interest
because of such withholding, au amount sufficient to cover such claim. The failure of City to exercise such right to
deduct or to withhold shall not, however, affect the obligations of the Contractor to insure, indemnify, and protect
City as elsewhere provided herein.
7.4 Waiver. No delay or omission in the exercise of any right or remedy by a nondefaulting
party on any default shall impair such right or remedy or be construed as a waiver. A party's consent to or approval
of any act by the other party requiring the party's consent or approval shall not be deemed to waive or render
unnecessary the other party's consent to or approval of any subsequent act. Any waiver by either party of any default
must be in writing and shall not be a waiver of any other default concerning the same or any other provision of this
Agreement.
7.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies expressly
declared to be exclusive in this Agreement, the rights and remedies of the parties are cumulative and the exercise by
either party of one or more of such rights or remedies shall not preclude the exercise by it, at the saute or different
times, of any other rights or remedies for the same default or any other default by the other party.
7.6 Legal Action. In addition to any other rights or remedies, either party may take legal
action, in law or in equity, to cure, correct or remedy any default, to recover damages for any default, to compel
specific performance of this Agreement, to obtain declaratory or injunctive relief, or to obtain any other remedy
consistent with the purposes of this Agreement.
7.7 Liquidated Damages. Since the determination of actual damages for any delay in
performance of this Agreement would be extremely difficult or impractical to determine in the event of a breach of
this Agreement, the Contractor and its sureties shall be liable for and shall pay to the City the sum of as Zero($ 0)
liquidated damages for each working day of delay in the performance of any service required hereunder, as specified
in the Schedule of Performance (Exhibit "D"). The City may withhold from any monies payable on account of
services performed by the Contractor any accrued liquidated damages.
7.8 Termination Prior to Expiration Of Term. This Section shall govern any termination of this
Agreement except as specifically provided in the following Section for termination for cause. The City reserves the
right to terminate this Agreement at any time, with or without cause, upon thirty (30) days' written notice to
Contractor, except that where termination is due to the fault of the Contractor, the period of notice may be such
shorter time as may be determined by the Contract Officer. In addition, the Contractor reserves the right to terminate
this Agreement at any time upon, with or without cause, upon sixty (60) days' written notice to City, except that
where termination is due to the fault of the City, the period of notice may be such shorter time as the Contractor may
determine. Upon receipt of any notice of termination, Contractor shall immediately cease all services hereunder
except such as may be specifically approved by the Contract Officer. Except where the Contractor has initiated
termination, the Contractor shall be entitled to compensation for all services rendered prior to the effective date of the
notice of termination and for any services authorized by the Contract Officer thereafter in accordance with the
Schedule of Compensation or such as may be approved by the Contract Officer, except as provided in Section 7.3. In
the event the Contractor has initiated termination, the Contractor shall be entitled to compensation only for the
reasonable value of the work product actually produced hereunder. In the event of termination without cause pursuant
to this Section, the terminating party need not provide the non-terminating party with the opportunity to cure pursuant
to Section 7.2.
PS2/296/099999-3000/2160684 2 6/14/96
Rcviscd 09/01/98
8
/!A 9
7.9 Termination for Default of Contractor. If termination is due to the failure of the Contractor
to fulfill its obligations under this Agreement, City may, after compliance with the provisions of Section 7.2, take over
the work and prosecute the same to completion by contract or otherwise, and the Contractor shall be liable to the
extent that the total cost for completion of the services required hereunder exceeds the compensation herein stipulated
(provided that the City shall use reasonable efforts to mitigate such damages), and City may withhold any payments to
the Contractor for the purpose of set-off or partial payment of the amounts owed the City as previously stated.
7.10 Attorneys' Fees. If either party to this Agreement is required to initiate or defend or made
a party to any action or proceeding in any way connected with this Agreement, the prevailing party in such action or
proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be entitled to
reasonable attorney's fees. Attorney's fees shall include attorney's fees on any appeal, and in addition a party entitled
to attorney's fees shall be entitled to all other reasonable costs for investigating such action, taking depositions and
discovery and all other necessary costs the court allows which are incurred in such litigation. All such fees shall be
deemed to have accrued on commencement of such action and shall be enforceable whether or not such action is
prosecuted to judgment.
8.0 CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION
8.1 Non-liability of City Officers and Employees. No officer or employee of the City shall be
personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the City or for
any amount which may become due to the Contractor or to its successor, or for breach of any obligation of the terms
of this Agreement.
8.2 Conflict of Interest. No officer or employee of the City shall have any financial interest,
direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating to the
Agreement which effects his financial interest or the financial interest of any corporation,partnership or association in
which he is, directly or indirectly, interested, in violation of any State statute or regulation. The Contractor warrants
that it has not paid or given and will not pay or give any third party any money or other consideration for obtaining
this Agreement.
8.3 Covenant Against Discrimination. Contractor covenants that, by and for itself, its heirs,
executors, assigns, and all persons claiming wider or through them, that there shall 6e no discrimination against or
segregation of, any person or group of persons on account of race, color, creed, religion, sex, marital status,national
origin, or ancestry in the performance of this Agreement. Contractor shall take affirmative action to insure that
applicants are employed and that employees are treated during employment without regard to their race, color, creed,
religion, sex, marital status, national origin, or ancestry.
9.0 MISCELLANEOUS PROVISIONS
9.1 Notice. Any notice, demand, request, document, consent, approval, or communication
either party desires or is required to give to the other party or any other person shall be in writing and either served
personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the attention of the
Contract Officer, CITY OF PALM SPRINGS, P.O. Box 2743, Palm Springs, California 92263, and in the case of the
Contractor,to the person at the address designated on the execution page of this Agreement. Either party may change
its address by notifying the other party of the change of address in writing. Notice shall be deemed communicated at
the time personally delivered or in seventy-two (72) hours from the time of trailing if mailed as provided in this
Section.
PS2/2/6/099999-30002160684 2 6/14196
Revised:09/01/98
9
IIA Jo
9.2 Interpretation. The terms of this Agreement shall be construed in accordance with the
meaning of the language used and shall not be construed for or against either party by reason of the authorship of this
Agreement or any other rule of construction which might otherwise apply.
9.3 Integratiom Amendment. Il is understood that there are no oral agreements between the
parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous negotiations,
arrangements, agreements and understandings, if any, between the parties, and none shall be used to interpret this
Agreement. This Agreement may be amended at any time by the mutual consent of the parties by an instrument in
writing.
9.4 Severability. In the event that any one or more of the phrases, sentences, clauses,
paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid judgment or
decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any of the remaining
phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby declared as severable and
shall be interpreted to carry out the intent of the parties hereunder unless the invalid provision is so material that its
invalidity deprives either party of the basic benefit of their bargain or renders this Agreement meaningless.
9.5 Corporate Authority. The persons executing this Agreement on behalf of the parties hereto
warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this
Agreement on behalf of said party, (iii)by so executing this Agreement, such party is formally bound to the provisions
of this Agreement, and(iv)the entering into this Agreement does not violate any provision of any other Agreement to
which said party is bound.
IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first
written above.
PS2/276/099999-3000/2160684 2 6/14/96
Revised 09/01/98
10
Mov/
ATTEST: CITY OF PALM SPRINGS,
a municipal corporation
By:
City Clerk City Manager
APPROVED AS TO FORM:
City Attorney
FS212761099999-300012160684.2 6/14/96
Rcvkmd.09/01/98
11
(Corporations iequu"e two signatures: One from each of the
following: A. Chairman of Board,Preatdent,any Vice President:
AND B. Secretary, Assistant Secretary, Treasurer, Assistant
Treasurer, or Chief Financial Officer).
(Check one)
_Individual_ Partnership_ Corporation
CONTRACTOR:
Safe Moves
By: Signature
Notarized Signature A
Print Name &Title
By:
Notarized Signature B
Print Name &Title
Mailing Address: 15500 Erwin Street
Suite 1121
Van Nuys Ca.
91411
(END OF SIGNATURES)
PS2/276/099999-3000/2160684.2 6/14/96
Revised 09/01/98
12
EXHIBIT "A"
SCOPE OF SERVICES
Task 1: Kick off Meeting
The contractor shall hold a pre-project meeting with City staff to discuss the goals of the
project and to obtain input form the City as to program content, possible, venues and
presentation scheduling. The City shall provide a contacts list for possible facilities and
organizations that may be interested in providing a facility for the programs use.
Task 2: Presentation and Bike Rodeo Design and Scheduling•
The City's Contract Officer shall provide a list of potential sites for the all of the programs.
This list shall include the site name, administrator, address and telephone number for each
site. The City's Contract Officer shall contact the Palm Springs Unified School District and
obtain District approval for presenting these programs on school property. The City's Contract
Officer shall provide initial collision data to the contractor to assist in the program design. The
contractor shall design both the in class presentations and bike rodeos to fit the program goals,
the Palm Springs climate and schedule the events to reach the maximum number of people as
possible. The contractor shall schedule the Parent Workshops, the In Class Work Shops and
the School Based Rodeos at all public and private Elementary and Middle Schools within the
City of Palm Springs. The contractor shall design the programs to cover the following
subjects:
In Class Workshops
Bicycle Education
* Helmet use (fit and maintenance)
* Choosing the right bike
Proper bicycling clothing
* Recognition and avoidance of common bicycle collisions
* Bicycle maintenance and repair
Rules, regulations and ordinances that govern bicyclists
Bicycle registration
Using safe bike routes to and from school
Consequences of unsafe bicycle use
Pedestrian Education
I` Safe places to walk (sidewalks, parks, etc.)
Unsafe places to walk (streets, railroad tracks, parking lots etc.)
r. Stranger awareness/personal safety
EXHIBIT "A"
SCOPE OF SERVICES
FS2Q76/099999-3000/2160684.2 6114196
12cviscd:09/01/98
Crosswalks (controlled and uncontrolled)
How to use a pedestrian signal properly
* Recognition and understanding of signs and signals
Recognition and avoidance of common pedestrian collisions
Walkingto school Safely
y (safe routes, getting out of a parent's car)
Attire (bright colored clothing, tied shoe laces, etc.)
* Walking on busy sidewalks
Precautions to take around special events (e.g. Halloween)
Railroad crossings
* Driveways/alleyways
Student drop off and pick up zones at schools
School Bus Education
* Getting off and on the bus safely
" Avoiding danger zones of buses
Safe riding habits on the bus
Personal Safety
Public Bus Education
Getting off and on the bus safely
Avoiding danger zones of buses
* Personal safety
Bike Rodeos
Bicycle Handling Skills
* Proper braking techniques for various situations
* Steep hill
wet pavement
sand
rain gutters
* debris
* car doors
Proper mounting and dismounting techniques
* Left and right hand turns
Left hand shoulder check (scanning for traffic)
* Proper turning techniques
* avoidance of rocks, sand, corners, drains, gutters
* Proper method of crossing railroad tracks
Traffic Assessment Skills
Crossing at intersections, alleyways, driveways
* Vehicles turning left and right
* Correct use of bike lanes
EXHIBIT "A"
SCOPE OF SERVICES
P52(106/099999300W2160684 2 611A/96
Revised 09/01/98
//A/s
Safer places to ride & walk
* Correct way to cross the street
Laws and ordinances
* Right side riding - consequences of wrong side riding
Behaviors of motorists, pedestrians and other cyclists
Parent Workshops
*Discussions of current traffic laws and ordinances
"'On-going traffic problems in and around school sites.
"' Ways to reinforce safety education at home, at school and in the community.
Older Adult Workshops
Pedestrian Education
Safe places to walk vs. unsafe places to walk
* Stranger awareness/personal safety
Crosswalks (controlled and uncontrolled)
* Recognition and understanding of signs and signals
Recognition and avoidance of common pedestrian collisions
Attire (smart and safe choices)
* Behaviors of motorists
Bus Safety
* Getting on and off the bus safely
* Danger zones of the bus
The contractor shall also submit a schedule of confirmed and tentative venues for the program for
the first year of the program. Prior to the completion of the first year of the program the
contractor shall supply the City with a schedule of confirmed and tentative venues for the second
year of the program.
The contractor shall design and submit the following forms to the Contract Officer for approval by
the City:
* School / site and Older Adult Workshop Certification Forms
Each school and/or site administrator will be given a Certification Form to verify workshops
conducted (i.e. date, time, number of students and number of workshops conducted). In addition
to the program data, each school / site administrator is required to complete the form which
EXHIBIT "A"
SCOPE OF SERVICES
FS2R96/0999993000n 160684.2 6/14/96
Revised:09/01/98
Af/t
provides feedback on the program content, presentation delivery, printed material and
effectiveness. The form also allows for additional continents and/or suggestions.
* School / site and Community Rodeo Certification Forms
Each school and/or site administrator will be given a Certification Form to verify the rodeo event
conducted (i.e. date, time, number of participants). In addition, the site administrator will be
asked to complete the survey portion of the Certification Form. The survey portion of the form
will include questions on program content, presentation, printed material and effectiveness of the
program. The form also allows for additional comments and/or suggestions. All surveys will be
reviewed and evaluated after each rodeo.
* Transportation Surveys & Statistics on Death and Injury
Each school/ site administrator will be given a transportation survey at each participating school/
site to assess the modes of transportation used by students. In addition, information will be
collected to establish a statistical database on traffic-related deaths and injuries among the target
group during the contract period.
The approved forms shall be distributed and collected by the contractor at the appropriate events.
A copy of the completed forms shall be forwarded to the Project Director.
The Project Director will coordinate surveillance programs at each school and community sites to
assess behaviors of bicyclists and pedestrians before and after the presentations. Before data will
be forwarded to the contractor to assist in the presentations at each site.
The Contractor will administer pre and post written tests in conjunction with the classroom
workshops and traffic safety rodeos. These tests will be used to evaluate the students' level of
understanding of traffic safety.
Once the first year schedule has been established, the Project Director shall schedule PSCTV
Film crew's attendance at least one for each type of event of the events for the purpose of
filming the events.
Task 3: In Class Presentations and Bike Rodeos
The contractor shall conduct the presentations based on the following distribution:
EXHIBIT "A"
SCOPE OF SERVICES
PS_>r96/099999d000/2160684 2 6/14/96
Revised;09/01/98
hilly
Program No. of Programs No of Programs No of Pro rams Total
(1" Year) (2"a year) (3"i Year) R ais
Ending 9/30/00 Ending 9/30/01 Ending 9/30/02
Classroom Workshops: 0 60 40 100
School-Based Rodeos: 0 15 5 20
Parent Workshops 0 10 10 20
Conununity Rodeos: 2 2 4 8
Older Adult Workshops 10 96 86 192
The Contractor shall assist the Contract Officer in preparing quarterly reports required for
OTS throughout the life of the contract.
Task 4: Post Presentation Evaluation
At the conclusion of the project the contractor shall present the City with a report that
summarizes the data collected in the forms outlined in "Survey and Certification Forms
described in Tasks 2" above. This report will outline results based on program type, site
location and overall performance of the project. The Contractor shall assist the Contract
Officer, as needed, in preparing the final report required for OTS.
EXHIBIT "A"
SCOPE OF SERVICES
R5wAkis"6/4999 021fi06R4.26/IJ/96
12etl 09/01/981/9N
11*4
EXHIBIT 'B"
SPECIAL REQUIREMENTS
Section 3.4 shall be revised from 1 year to 3 years.
Section 5.3 "Performance Bond" shall be waived.
Section 7.7 "Liquidated Damages" shall waived
The Contractor shall complete the "DRUG-FREE WORKPLACE CERTIFICATION"
(STD21) and "RECORD OF MINORITY, WOMEN or DISABLED BUSINESS
ENTERPRISE (M/WIDVBE) PARTICIPATION" FORM (OTS 24) prior to the Notice to
Proceed from the City being issued.
EXHIBIT 'B"
TO CONTRACT SERVICES AGREEMENT
F82/116/0999993000p_160681126/14/96
Revised:09/01/98
/l�9 I9
State of Callfomla EXHIBIT 6-F
DRUG-FREE WORKPLACE CERM ATION
STD.21 (New 11-90)
COMPANY/ORGANIZATION NAME
The contractor or grant named above hereby certifies compliance with Government Code Section 8355 in matters
relating to providing a drug-free workplace. The above named contractor or grant recipient will:
1. Publish a statement notifying employees that unlawful manufacture, distribution, dispensation, possession, or
use of a controlled substance is prohibited and specifying actions to be taken against employees for violations, as
required by government Code Section 8355(a).
2. Establish a Drug-Free Awareness Program as required by government Code Section 8355(b), to inform
employees about all of the following:
(a) The dangers of drug abuse in the workplace,
(b) Any available counseling, rehabilitation and employee assistance programs, and
(c) Any available counseling, rehabilitation and employee assistance programs, and
(d) Penalties that may be imposed upon employees for drug abuse violations.
3. Provide as required by Government Code Section 8355 (c), that every employee who works on the proposed
contract or grant:
(a) Will receive a copy of the company's drug-free policy statement, and
(b) will agree to abide by the terms of the company's statement as a condition of employment on the contract
or grant.
CERTIFICATION
I, the official named below, hereby swear that I am duly authorized legally to bind the contractor or grant recipient
to the above described certification. I am fully aware that this certification, executed on the date and in the county
below, is made under penalty of perjury under the laws of the State of California.
OFFICIAL'S NAME
DATE EXECUTED EXECUTED IN THE COUNTY OF
CONTRACTOR OR GRANT RECIPIENT SIGNATURE
TITLE
FEDERALI.D.NUMBER
Ind 120
EXHIBIT 6-B
State of California•Office of Traffic Safety Primary Contractor
OTS-24(Rev 10194) Secondary Contractor ❑
Instructions on Reverse
RECORD OF MINORITY,WOMEN, or DISABLED
BUSINESS ENTERPRISE(M/W/DVBE)PARTICIPATION
1. Applicant Agency Project No.
2. ContractorNendor
Address
3. Description of work or services to be contracted or materials to be provided:
4. Cost of services or materials $
5. Is the contractor/vendor a Minority, Women,or Disabled Veteran Business Enterprise(M/W/DVBE)?
Yes No
6. Is a M/W/DVBE involved as a secondary contractor under the prime contract identified above?
Yes No
If"Yes",attach a separate form for each secondary contractor.
7. If"Yes"to 95 above, is the M/W/DVBE owned by:
African American Hispanic Asian Women
American Indian Disabled Veteran Other
8. If"No"to#5 above,are you aware of M/W/DVBE's that provide the required service/materials?
Yes No
9. If"Yes"to#8 above, were these firms given an opportunity to submit a proposal or bid?
Yes No
10. If"No"to#9 above,explain why not. If"Yes", explain why they were not selected.
I HEREBY CERTIFY that to the best of my knowledge all information provided above is complete and correct.
PROJECT DIRECTOR
INSTRUCTIONS
• This form must be completed for each contract and/or purchase of services
or materials under the grant agreement (excluding items drawn from stores
or existing stocks).
• The form is to be completed in duplicate and sent to OTS at the time a
contractor or vendor is selected.
• A M/W/DVBE is defined as a small business concern which is at lest 51
percentum owned and controlled by one or more minorities, women, or
disabled veterans.
• This form is used to collect information required by the Federal Department
of Transportation as set forth in Title 49, Code of Federal Regulations,Part
23, and to ensure compliance with State of California Code of Regulations,
Title 2, Subchapter 10.5.
• Check the appropriate box in the upper right comer.
• Circle the appropriate response to questions 5-9.
11*4 xz
EXHIBIT "C"
SCHEDULE OF COMPENSATION
Tasks below are identical to tasks identified in Exhibit A of this Agreement.
TASK LUMP SUM
Task 1: Kick off Meeting $0.00
Task 2: Presentation and Bike Rodeo Design and Scheduling $0.00
Task 3: In Class Presentations and Bike Rodeos
3.1- 100 Classroom Work Shops @ $100.00 $10,000.00
3.2- 20 School Based Rodeos @ $1,000.00 $20,000.00
3.3- 20 Parent Workshops @ $200.00 $4,000.00
3.4- 8 Community Based Rodeos @$1,000.00 $8,000.00
3.5- 192 Older Adult Workshops @ $200.00 $38,400.00
Task 4: Post Presentation Evaluation
$0.00
TOTAL COST $80,400.00
EXHIBIT "C"
TO CONTRACT SERVICES AGREEMENT
F52/296/099999-3000/21606B,1 2 6114/96
RwiscA:09/01/98
!lR 3
EXHIBIT "D"
SCHEDULE OF PERFORMANCE
Task 1 shall be completed by August 07, 2000.
Task 2 shall be completed by August 31, 2000
Task 3 shall be executed under the following time frame.
Year 1 - 4"' quarter:
2 Community Based Rodeos, 10 Older Adult Workshops
Year 2 - 1" quarter:
20 classroom workshops, 5 School based rodeos, 3 Parent Workshops, 24 Older
Adult Workshops.
Year 2 - 2"d quarter:
20 classroom workshops, 5 School based rodeos, 4 Parent Workshops, 24 Older
Adult Workshops, 1 Community Based Rodeo
Year 2 - 3`d quarter:
20 classroom workshops, 5 School based rodeos, 3 Parent Workshops, 24 Older
Adult Workshops.
Year 2 - 4' quarter:
1 Community Based Rodeo, 24 Older Adult Workshops
Year 3 - 1" quarter:
10 classroom workshops, 2 School based rodeos, 4 Parent Workshops, 21 Older
Adult Workshops, 1 Community Based Rodeo.
Year 3 - 2"d quarter:
20 classroom workshops, 2 School based rodeos, 4 Parent Workshops, 22 Older
Adult Workshops, 1 Community Based Rodeo
Year 3 - 3" quarter:
10 classroom workshops, 1 School based rodeos, 2 Parent Workshops, 22 Older
Adult Workshops, 1 Community Based Rodeo.
Year 3 - 4' quarter:
1 Community Based Rodeo, 21 Older Adult Workshops
All programs shall be completed no later than June 1, 2002,
Task 4 shall be ongoing throughout the project and shall be completed no later than August 1,
2002.
EXHIBIT "D"
TO CONTRACT SERVICES AGREEMENT
F52276/099999-3000816068426/14/96
Rc iwd.09J01199
MINUTE ORDER NO.
APPROVING CONTRACT SERVICES AGREEMENT
WITH SAFE MOVES, IN THE AMOUNT OF $80,400,
FOR THE DESIGN, IMPLEMENTATION AND PRESENT-
ATION OF PEDESTRIAN AND BICYCLE EDUCATION
PROGRAMS, CITY PROJECT NO. 2000-03
I HEREBY CERTIFY that this Minute Order approving a Contract Services Agreement with
Safe Moves, in the amount of$80,400.00, for the design, implementation and
presentation of Pedestrian and Bicycle Education programs, City Project No. 2000-03, was
approved by the City Council of the City of Palm Springs, California, in a meeting thereof
held on the 2nd day of August, 2000.
PATRICIA A. SANDERS
City Clerk
JI