HomeMy WebLinkAbout2/2/2000 - STAFF REPORTS (7) Date: February 2, 2000 To: City Council From: City Engineer CONSTRUCTION CHANGE ORDER NO. 1 TO ENVIRONMENTAL CONTROL SYSTEMS, INC. RECOMMENDATION: That the City Council approve Construction Change Order No. 1 to Environmental Control Systems, Inc., in the amount of$19,200.00 for the Asbestos Abatement and Demolition project at 3709 El Dorado Blvd., City Project# 98-05. BACKGROUND: On June 16, 1999 City Council awarded Environmental Control Systems, Inc. the contract for City Project #98-05, Asbestos Abatement and Demolition. The project consisted of asbestos abatement and demolition of 5 substandard structures which were in violation of a variety of Health and Safety Codes and the Uniform Building Code. Of the five properties identified in the project, four have been demolished. The Redevelopment Agency currently owns the property located at 3709 El Dorado Blvd. This property was purchased in September of 1999, and at the time of purchase it was being considered for demolition. The structures occupying the lot are vacant and substandard. The Redevelopment Agency has asked that this property be added to the existing demolition project. An asbestos investigation has been completed by Infotox, Inc., and all areas containing asbestos have been identified. This change order will include the asbestos abatement and demolition of all structures located at 3709 Et Dorado Blvd., and the costs associated with moving demolition equipment on and off of the project site. The total adjustment to the agreement for these services is $19,200.00. Sufficient funds to cover this change order are available in account numbers 882- 8382-50000 (Unscheduled Capital Projects) and 4151-43260 (Asbestos Abatement and Demolition). DAVID J. BARAKIAN ✓_ - City Engineer APPROVED: �� � r City Manager ATTACHMENTS: 1. Minute Order 2. Change Order No. 1 V009dlk CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: Environmental Control Systems, Inc. Date: January 21, 2000 29160 Goetz Road Project No. 98-05 Quail Valley, CA 92587 Project Name: Asbestos Abatement and Demolition Change Order No. One (1) Attn: Ronald McDaniel Contract Purchase No. 906612 Account Number:4151-43260 Agr.# 4111 M.O.# 6424 A. CHANGES IN WORK: INCREASE TO CONTRACT QUANTITIES A. A. Demolition, removal and disposal of existing LUMP SUM of exposure to all asbestos hazards at 3709 El Dorado Blvd., Palm Springs, CA B. Heavy equipment move on and off at LUMP SUM 403 Bon Air and 233 Tramview Rd., Palm Springs, CA C. Heavy equipment move on and off at LUMP SUM 3709 El Dorado Blvd., Palm Springs, CA B. CHANGES IN COST: INCREASE TO CONTRACT QUANTITIES A. Demolition, Removal and disposal of existing LUMP SUM = $18,000.00 structure, all appurtenant work, and abatement of exposure to all asbestos hazards at 3709 El Dorado Blvd., Palm Springs, CA B. Heavy equipment move on and off at LUMP SUM = $ 800.00 403 Bon Air and 233 Tramview Rd., Palm Springs, CA C. Heavy equipment move on and off at LUMP SUM = $ 400.03 709 El Dorado Blvd., Palm Springs, CA (If required) TOTAL NET CHANGE ORDER AMOUNT $19,200.00* C. REASONS FOR CHANGES: The Redevelopment Agency currently owns the property and structures located at 3709 El Dorado Blvd,. The structures occupying the lot are vacant, substandard and currently pose a safety hazard to the public. An asbestos report has been completed by Infotox Inc., and all areas containing asbestos and requiring asbestos abatement have been identified. Per this change order, this location is being added to the current Asbestos Abatement and Demolition Project. Asbestos Abatement and demolition at the 709 El Dorado Blvd. Location shall be completed per the existing special provisions. Consideration of time adjustment will be deferred until completion of the work specified in this change order. Determination of commensurate time extension will be in accordance with the provisions of Section 6-6 of the Standard Specifications. During the demolition of the Bon Air and Tramview locations, additional costs (for the moving on and off of heavy equipment) were incurred by the contractor. This equipment movement was necessary due to unforseen community relations issues. On a daily basis, many people were entering the job site and spray painting the building. In addition, employees of the contractor received threats that their equipment would be vandalized if it remained on site after working hours. Per this change order, the Contractor will be reimbursed for these additional costs due to the daily moving of equipment. Asbestos Abatement Demolition CP #98-05, CCO #1 Page 2 of 2 The demolition location proposed in this change order, is in the same vicinity as the Tramview and Bon Air structures that have been demolished. In anticipation of possible community animosity and vandalism to demolition equipment, the Contractor intends to move equipment on and off site daily. The cost moving of this equipment was not reflected in the demolition proposal. * Note: No additional mark ups will be added to any item on this Change Order. All cost per each item are final. D. SOURCE OF FUNDS: Funds are available in Account #882-8382-50000 (Unscheduled Capital Projects) #4151-43260 (Asbestos Abatement and Demolition) Item B Summary of Costs Contract Time Original Contract Amount: $106,000.00 Original Completion Date: Dec 9, 1999 This Change Order: $ 19,200.00 Days Added for this C.C.O.: Deferred Previous Change Order(s): $ 0.00 Previous Days Added: -20- Revised Contract Amount: $125,200.00 Revised Completion Date: Deferred I have received a copy of this Change City Approval: Order and the above AGREED PRICES are acceptable to the contractor. Submitted by: Date Field Engineering Supervisor By Approved by Date City Engineer Date Approved by Date Economic Development Approved By Date City Manager Distribution: Original Conformed Copies Conformed-File Copy Engineering (1) Engineering File (1) Finance (1) Engineering Field Inspector (1) Contractor (1) Engineering Field Supervisor(1) City Clerk (1) Purchasing Agent (1) � 3 MINUTE ORDER NO. APPROVING CONSTRUCTION CHANGE ORDER NO. 1 TO ENVIRONMENTAL CONTROL SYSTEMS, INC., IN THE AMOUNT OF $19,200.00 FOR ASBESTOS ABATEMENT AND DEMOLITION PROJECT AT 3709 ELDORADO BLVD., CITY PROJECT NO. 98-05 I HEREBY CERTIFY that this Minute Order approving Construction Change Order No. 1 to Environmental Control Systems, Inc. in the amount of $19,200.00 for Asbestos Abatement and Demolition Project at 3709 El Dorado Blvd., City Project No. 98-05, adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 2nd day of February, 2000. PATRICIA A. SANDERS City Clerk