HomeMy WebLinkAbout11/17/1999 - STAFF REPORTS (13) DATE: November 17, 1999
TO: City Council
FROM: Assistant City Manager-Operations
NOISE ABATEMENT BERM-Change Order#3
RECOMMENDATION:
It is recommended that City Council approve Change Order#3 to Agreement#3992 with Granite
Construction Company for a deduct of($7,788.35).
BACKGROUND:
This final Change Order to the Noise Abatement Berm includes all final quantities and a liquidated
damages penalty of($10,960.10). The project is complete and ready to closeout. A Minute Order
approving this final Change Order is attached for City Council consideration.The account that will
be affected is 4125-6600-56008.
ALLEN F. SMObT,AAE
Assistant City Manager-Operations e
APPROVED .N �i
City Manager
ATTACHMENTS
Minute Order
CHANGE ORDER NO.3
Ina
".3
PROTECT TITM bnsta kbm of Noise AbatementBam Erosion Control and f/-/7- 9 9
CosstnuUM of Perimeter Security Fare and Road
CITY FROJACT NO. 97-26
FAA AIP PRC))BCP NOS. 3-06-018120
CONTRACT DATE July 1,1998
CONTRACTOR Granite CAnstmuclion Company
The followfrkgclanges we hereby made to ffie Coupe tDocamadic
1. Add:kataDecomposed crettite Swfwm&appro=mw tdy 3.o W at$M95 per SF,
2. Add.Replace G hmr d C nwplsnis,%of WWcost($6f8.5o)yielding p21.75;
3. Deduct Liquidated Dmtagw mvmerz%e gmm fim ate period.($Io,9fi0.lo);
to be measured and pedd by the agreed unit price).
Jmti6
L Tnuvdtir n area to be stabilized with DeoonVesed Clrmite Surfiauyng;
2. Plaot replaaenunt xgaited due to aubbits pmeha ft the fare;
3. Projectdel"edbydueCwftador85colatdwdays.
CHANGE TIO CONTRACT PRICE
OriginalCootmapkix: Sm"00
CnrrentCm adPdM m adjusted by previous d=V orderx URM.00
The CaettradPtioe dm to dt h Clunge cider wglbe decmmed by ($7MM
Thenew CatlradP doe due to thdsChaw 0iderw9lbe•. UJL19166
CHANGE 7000NTRACTMW
The CmutradTimewillbeitc wmdby Zero(0)oiladerdays.
Thu date for coull*fim of OR work coder the contract w9l be Ntnely(90)Calendar Days from
the Construction Start Date,to be determined is accordance w9h the contact dwmwnbL
AppmvabRequfted;
Tc be effftu ,Oda order aunt be approved by the Spormw and the FAA if t cfiangs the scope of the
oblecunof the project,or IOnr
d fader the terns of theC rtractDo mmentL
Requededby deee Q 2 7)9!
f/�r. tooc ` AY
Fecoavrtardedby l�.trlt/ date Wff
Ordered by fkh" dace 9 ) f f
Coy of Pala tip
Accepted by - dace 7-
Comp
Approved by the F
rD..do�e
t AareeNL nwOdM L trnds arv'
F 7�-� �- - APPROVED BY THE CITY COUNQI
sweruAeor, sferaards tieclion �Y gam-NO.
M E M O R A N D U M
DATE: November 29, 1999
TO. Assistant City Manager-Operations-Al Smoot
FROM. Orwe of the My Ckrk
RE. Change Order No. 3-Airport Noise Abatement Bert,
Grnite Construction Co., CP 97-26 A3992
Attached pkae JPnd two(2)copies of the above Werenced
Change Order No. 3 for CP 97-26, Gradte Conanygton
Co. -A3992 Wroved by the City Council on November
17, 1999 per Mo 6528.
Evelyn
cc:Fik
MINUTE ORDER NO.
(�
APPROVING CHANGE ORDER#3 TO AGREEMENT
#3992 WITHGRANITECONSTRUCTIONCOMPANY,
RELATED TO THE NOISE BERM PROJECT FOR A
DEDUCT OF($7,788.35).
I HEREBY CERTIFY that this Minute Order,approving Change Order#3
to Agreement#3992 with Granite Construction Company, related to the
Noise Berm Project for a deduct of($7,788.35)was adopted by the City
Council of the City of Palm Springs,California,in a meeting thereof held
on the 17"day of November 1999.
PATRICIA A. SANDERS
City Clerk
� r6
J