HomeMy WebLinkAbout11/17/1999 - STAFF REPORTS (13) DATE: November 17, 1999 TO: City Council FROM: Assistant City Manager-Operations NOISE ABATEMENT BERM-Change Order#3 RECOMMENDATION: It is recommended that City Council approve Change Order#3 to Agreement#3992 with Granite Construction Company for a deduct of($7,788.35). BACKGROUND: This final Change Order to the Noise Abatement Berm includes all final quantities and a liquidated damages penalty of($10,960.10). The project is complete and ready to closeout. A Minute Order approving this final Change Order is attached for City Council consideration.The account that will be affected is 4125-6600-56008. ALLEN F. SMObT,AAE Assistant City Manager-Operations e APPROVED .N �i City Manager ATTACHMENTS Minute Order CHANGE ORDER NO.3 Ina ".3 PROTECT TITM bnsta kbm of Noise AbatementBam Erosion Control and f/-/7- 9 9 CosstnuUM of Perimeter Security Fare and Road CITY FROJACT NO. 97-26 FAA AIP PRC))BCP NOS. 3-06-018120 CONTRACT DATE July 1,1998 CONTRACTOR Granite CAnstmuclion Company The followfrkgclanges we hereby made to ffie Coupe tDocamadic 1. Add:kataDecomposed crettite Swfwm&appro=mw tdy 3.o W at$M95 per SF, 2. Add.Replace G hmr d C nwplsnis,%of WWcost($6f8.5o)yielding p21.75; 3. Deduct Liquidated Dmtagw mvmerz%e gmm fim ate period.($Io,9fi0.lo); to be measured and pedd by the agreed unit price). Jmti6 L Tnuvdtir n area to be stabilized with DeoonVesed Clrmite Surfiauyng; 2. Plaot replaaenunt xgaited due to aubbits pmeha ft the fare; 3. Projectdel"edbydueCwftador85colatdwdays. CHANGE TIO CONTRACT PRICE OriginalCootmapkix: Sm"00 CnrrentCm adPdM m adjusted by previous d=V orderx URM.00 The CaettradPtioe dm to dt h Clunge cider wglbe decmmed by ($7MM Thenew CatlradP doe due to thdsChaw 0iderw9lbe•. UJL19166 CHANGE 7000NTRACTMW The CmutradTimewillbeitc wmdby Zero(0)oiladerdays. Thu date for coull*fim of OR work coder the contract w9l be Ntnely(90)Calendar Days from the Construction Start Date,to be determined is accordance w9h the contact dwmwnbL AppmvabRequfted; Tc be effftu ,Oda order aunt be approved by the Spormw and the FAA if t cfiangs the scope of the oblecunof the project,or IOnr d fader the terns of theC rtractDo mmentL Requededby deee Q 2 7)9! f/�r. tooc ` AY Fecoavrtardedby l�.trlt/ date Wff Ordered by fkh" dace 9 ) f f Coy of Pala tip Accepted by - dace 7- Comp Approved by the F rD..do�e t AareeNL nwOdM L trnds arv' F 7�-� �- - APPROVED BY THE CITY COUNQI sweruAeor, sferaards tieclion �Y gam-NO. M E M O R A N D U M DATE: November 29, 1999 TO. Assistant City Manager-Operations-Al Smoot FROM. Orwe of the My Ckrk RE. Change Order No. 3-Airport Noise Abatement Bert, Grnite Construction Co., CP 97-26 A3992 Attached pkae JPnd two(2)copies of the above Werenced Change Order No. 3 for CP 97-26, Gradte Conanygton Co. -A3992 Wroved by the City Council on November 17, 1999 per Mo 6528. Evelyn cc:Fik MINUTE ORDER NO. (� APPROVING CHANGE ORDER#3 TO AGREEMENT #3992 WITHGRANITECONSTRUCTIONCOMPANY, RELATED TO THE NOISE BERM PROJECT FOR A DEDUCT OF($7,788.35). I HEREBY CERTIFY that this Minute Order,approving Change Order#3 to Agreement#3992 with Granite Construction Company, related to the Noise Berm Project for a deduct of($7,788.35)was adopted by the City Council of the City of Palm Springs,California,in a meeting thereof held on the 17"day of November 1999. PATRICIA A. SANDERS City Clerk � r6 J