Loading...
HomeMy WebLinkAbout9/1/1999 - STAFF REPORTS (15) DATE: September 1, 1999 TO: City Council FROM: City Engineer FIRST AMENDMENT TO CONTRACT SERVICES AGREEMENT NO. 4109 WITH EARTH SYSTEMS CONSULTANTS SOUTHWEST RECOMMENDATION: That the City Council ratify the Acting City Manager's approval of the First Amendment to Contract Services Agreement No. 4109 with Earth Systems Consultants Southwest in the amount of $7,116.00, for the Palm Canyon Rehabilitation Project, City Project No. 99-02. BACKGROUND: On June 14, 1999, the City Manager approved Agreement No. 4109 with Earth Systems Consultants Southwest, in the amount of $3,700.00, for pavement evaluation and testing of Palm Canyon Drive between Alejo Road and Ramon Road. The services were required to determine the existing pavement thickness of Palm Canyon Drive and to provide additional testing of the underlying soils. On July 7, 1999, the City Council awarded a contract to Granite Construction Company for the construction of the Palm Canyon Drive Rehabilitation Project, City Project No. 99-02. The scope of services of Agreement No. 4109 is proposed to be amended to provide the City with materials sampling and testing of the asphalt concrete overlays and with inspection of the Granite Construction Company's batch plant. These services will allow for quality control and evaluation of the materials used by Granite Construction Company in the reconstruction of Palm Canyon Drive. As provided by code (state and municipal), Acting City Manager Smoot determined that the public interest and protection of public property would be best protected by authorizing this amendment as an emergency. The code requires this action be submitted to the City Council at its next regular meeting (September 1, 1999) for ratification. The total cost for the services included in the agreement is$10,816.00. Sufficient funds to cover this First Amendment to Agreement No.4109 are available in Local Measure A account number 134-4498-50161 (N.Palm Canyon Rehabilitation/local match). APPROVED: DAVID J. BARAKIAN City Manager City Engineer ATTACHMENTS: f'' - 1. Minute Order v , i yli:i.Jl•7 v71 2. First Amendment to Agreement No. 4109 134 AMENDMENT NO.1 TO AGREEMENT NO. 4109 for Pavement Evaluation- Palm Canyon Drive Rehabilitation CITY PROJECT NO. 99-02 The following articles of Agreement No. 1 are hereby amended to read as follows: 1. SECTION 2.19 Contract Sum, is hereby amended to provide a maximum contract amount of$10,816.00. 2. SECTION 5.1, Term, is hereby amended to read: Unless earlier terminated in accordance with Section 5.2 below, this Agreement shall continue in full force and effect until December 1, 1999. 3. EXHIBIT "A", Scope of Services, Is hereby amended by adding the following: Contractor shall provide material testing and sampling and batch plant Inspection of Asphalt Rubber Hot 11Hx (ARM. Contractor shall provide continuous inspection during the batching of the ARHM at the Granite Construction plant located in Indio, California, including sampling from the cold feed and gradation analyses of the samples (6 samples/ gradations). Contractor shall also conduct on-site sampling during construction of the ARHM overlay (14 samples) and provide extraction/gradation testing of the samples obtained during construction (14 tests). 4. EXHIBIT "B", Schedule of Compensation, is hereby amended by adding the following: ARHM Plant Inspection/Sampling: $19656.00 Cold Feed Gradations: $390.00 On-Site Sampling: $812.00 Extraction & Gradations of On-Site: $29170.00 Hazardous Waste Handling Charge: $1,120.00 Mileage: $336.00 Mix Design Review: $200.00 Project Management: $432.00 Contractor shall notify the City of any change in the Scope of Services prior to executing any changes. a Amendment No. 1 to Earth Systems Consultants Southwest Agreement No. 4109 Page 2 of 2 Except as specifically amended by this Amendment No. 1, all terms and provisions of Agreement No. 4109 approved by the City Manager on June 14, 1999, shall remain in full force and effect. DATED this Day of , 1999. ATTEST: CITY OF PALM SPRINGS A municipal corporation City Clerk City Manager APPROVED AS TO FORM: City Attorney CONTRACTOR: EARTH SYSTEMS CONSULTANTS SOUTHWEST Check one: _Individual_Partnership _ Corporaflon (Corporations require two signatures: By: One from each of the following: A. Signature (Notarized) A. Chairman of Board,President, any wcaPresident:AND B. Secretary, Print Name &Title Assistant secretary,Treasurer,Assistant Treasurer,or Chief Financial Officer). By: B. Signature (Notarized) Print Name&Title Mailing Address: 13 -�9. 3 qlo MEMORANDUM DATE: September % 1999 TO: Engineering-Margo FROM: Office of the City Clerk RE: Earth Systems Consultants Southwest, A4109: CC: File Attached please find two executed copies of the above referenced agreement, between the City of Palm Springs and Earth Systems Consultants Southwest for pavement evaluation-Palm Canyon Drive Rehabilitation, CP99-02, A4109, approved by the City Manager, on September 1, 1999. Please forward one copy to Earth Systems Consultants Southwest, and retain a copy for your files. A copy has been forwarded to Finance, and we have retained our necessary copies. Should you have any questions, please give me a call at 8206. LEvel2y Earth Systems Consultants Southwest Pavement Evaluation-Palm Canyon AGREEMENT 4109,AMEND#1 M06477, 9-1-99 Related AMENDMENT NOA TO AGREEMENT NO. 4109 for Pavement Evaluation- Palm Canyon Drive Rehabilitation CITY PROJECT NO. 99-02 The following articles of Agreement No. 1 are hereby amended to read as follows: 1. SECTION 2.1, Contract Sum, is hereby amended to provide a maximum contract amount of$10,816.00. 2. SECTION 5.1, Term, is hereby amended to read: Unless earlier terminated in accordance with Section 5.2 below, this Agreement shall continue in full force and effect until December 1, 1999. 3. EXHIBIT "A", Scope of Services, is hereby amended by adding the following: Contractor shall provide material testing and sampling and batch plant inspection of Asphalt Rubber Hot Mix (ARB". Contractor shall provide continuous inspection during the hatching of the ARHM at the Granite Construction plant located in Indio, California, including - sampling from the cold feed and gradation analyses of the samples (6 samples / gradations). Contractor shall also conduct on-site sampling during construction of the ARHM overlay (14 samples) and provide extraction/gradation testing of the samples obtained during construction (14 tests). 4. EXHIBIT "Be, Schedule of Compensation, is hereby amended by adding the following: AREM Plant Inspection/Sampling: $1,656.00 Cold Feed Gradations: $390.00 On-Site Sampling: $812.00 Extraction & Gradations of On-Site: $2,170.00 Hazardous Waste Handling Charge: $19120.00 Mileage: $336.00 Mix Design Review: $200.00 Project Management: $432.00 Contractor shall notify the City of any change in the Scope of Services prior to executing any changes. Amendment No. 1 to Earth Systems Consultants Southwest Agreement No. 4109 Page 2 of 2 Except as specifically amended by this Amendment No. 1, all terms and provisions of Agreement No. 4109 approved by the City Manager on June 14, 1999, shall remain in full force and effect. DATED this 422L-D ay of j& , 1999. T: Y OF PALM SP A City erk City et APPROVED AS TO FORM: ity Attorney CONTRACTOR: EARTH SYSTEMS CONSULTANTS SOUTHWEST Check one: Individual Partnership Corporation (Corpndow require two sigwtores: By: One from each of the following: A. Signature(Notarized) A.Chairman of Board,President, Sc oT— S-toW,rr0 LI. 40 any Vice-President: AND B.Secretary, An ame&Title Assistant Secretary,Treasurer,Assistant Traeurer,or Clief Financial Officer). By:B. Signature (Notarized) wzoz, 17 Bo-otL/v U=0 Print Name&Title Mailing Address: APPROVED BY THE CITY COIfNCII BY NO. & 11 MINUTE ORDER NO. RATIFYING THE ACTING CITY MANAGER'S APPROVAL OF THE FIRST AMENDMENT TO CONTRACT SERVICES AGREEMENT NO. 4109 WITH EARTH SYSTEMS CONSULTANTS SOUTHWEST,FOR MATERIALS SAMPLING, TESTING AND BATCH PLANT INSPECTION, IN THE AMOUNT OF$7,116.00 FOR A TOTAL CONTRACT AMOUNT OF $10,816.00, FOR PALM CANYON DRIVE REHABILITATION,CITY PROJECT NO. 99-02. I HEREBY CERTIFY that this Minute Order ratifying the Acting City Manager's approval of the First Amendment to Contract Services Agreement No. 4109 with Earth Systems Consultants Southwest, for materials sampling, testing and batch plant inspection, in the amount of $7,116.00 for a total contract amount of $10,816.00, for Palm Canyon Drive Rehabilitation, City Project No. 99-02, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 1st day of September, 1999. PATRICIA A. SANDERS City Clerk 13