AIRPORT TERMINAL ARCHITECT WORK DIRECTIVE
RECOMMENDATION:
It is recommended that City Council approve Work Directive No. 27 with Gensler for
additional Task 3 review and oversight work on the Airport Terminal Expansion Project.
BACKGROUND:
Gensler, the Airport Terminal Architect, has requested additional compensation related to
Task 3 of their contract, construction oversight. The attached letter details the additional
work from preparation of bulletins for expanding project scope, to extra job site meetings
and extra submittal reviews.
The existing architectural contract allows for increases related to the items requested. The
extra hours for excessive submittal reviews will be submitted to the various trade contractors
as back-charges. The total requested increase is$48,000. Funds are available in Airport
Expansion Account 415-6326-43245.
,A,Minute Order is attached for City Council review.
ALLEN F. SMOOT,AAE
Assistant City M er-O ration
APPROVED
l�C anger
ATTACHM``ENTS:
1. Minute Order
2. Letter Request
Gensler&Assoc.
�ork Auth#27
WORK A U T H O R I Z,I O N cketing Expansion
AGREEMENT#2781
Work iYMorizalion Number Dab M06473,9-1-99 related
27 — W27M— --
Project Location — — — — -
Pro(sct Project Number
Palm Strings International Airport,Phase HA 05 0009 026
GNnt 3400 E.Tabtluitz Canyon Way,Palm Springs,California
City of Palm Springs,Department of Transportation
Authorization is eo4ftrmed jarGauler to perform thefollowing services:
Additional Construction Administration services for scope change bulletins and extraordinary submittal review. See attached
Gensler letter dated 8/20/99.
Reconciliation of the Basic Fee:
Original Fee- Added Fee-Previously Added Fee-Work Revised Fee-After
Work Authorization 22 Authorized Authorization 27 Work Authorization 27
Task 1: $305,450(LS) $37,950 0 Task 1: $343.300(LS)
Task 2: $ 46,600(IS) 0 0 Task 2: $ 46,600(LS)
Task 3: $466,540(LS) 0 $48 800 Task 3• $515 340(LS)
Total. $818,590 $37.950 $48,800 Total: $905,240
Orlginat or MasterAgmement(yany),deed-
Archiwetural Agreement dated January 25, 1991
Other References: Work Authorization 22 dated 7/21/97,PO 806098
Work Authorization 23,dated 10l21/97,PO 806098 CO 1
Work Authorization 24„dated 11/14/97,PO 806098 CO 2
Work Authorization 26,dated 6/12/98,PO 806098 C05
Services not included(this list is not exhaustive):
All other services not specifically included in this work authmization.
Fee and Basis 0 Phu Reimbursable Expenses
Add$48 800 L tunp Sum. O Plus Consultants which are not listed as included in fee
Date services to begin. Services projected to be
Previously performed completed no later pleat the
following.V indicated-
immediately after WorkAuthonzation approval
Date:
Working days after Work
Authoritarian approvaL-
Services authorized by: Date ofAuthorinadom
Allen Street Date
Prepared by: hate Signed•
Rea S[eiuert 8/27/99
On f f Andrew P.Cohen. a 'erg Principal of the Los Angeles Regional Office,California Registration Number C12855
aw ateuwai, zpt„raama eco arras..
Clio ut110 ' Date gned.-
le
o as.aoo9.o aam _,m,�, VM BY n*C" 2500 roadway
BY NO.IT D �4i y=��/�y y Cane 30D Fax 310.449.5850
Soma Monica California 90404 Fax,310.449.5850
Architecture,Design d Plenning werldmide Gensler
August 20, 19"
Mr.Allen Smoot
Assistant City Manager Operations
City of Palm Springs
32M E.Tahquitz Canyon Way
Palm Springs,CA 92262
Re: Request for Additional Pees
Palm Springs International Airport
05.0009.026
Dear Al:
Pursuant to my conversation with Mike Williams,and your subsequent telephone message,Gensler is
writing to submit a request for additional compensation for Task 3 of the Expansion of Palm Springs
International Airport,Phase 2A.
Attached is the list of tasks performed by Gensler,outlining additional scope of work over and above
that originally agreed upon for Task 3 of the project. Listed bulletins were issued at the Owner's
request,expanding the original scope of work.
Requested additional compensation for submittal review is time spent over and above the customary
and usual review time,due to the poor quality of the submittals. Listed submittals required multiple
reviews—over two reviews included at the original scope of work.
Also,Gensler was requested to participate at additional site coordination meetings with vendors and
Turner,requiring extra trips to Palm Springs over and above the trips agreed to in the original scope of
work.
The landscape architect,LRM,Ltd.,has asked Gensler for additional compensation for work
performed for Task 3 of the project. The$1,000 is additional compensation for preparation of
Bulletin#24. This compensation was already agreed to by the Airport. LRM's attached letter dated
August 12, 1999,is requesting further compensation of$1,300 for site visits.
Genslees and LRM's combined request for additional fee for Task 3 of the project is$48,800. If
agreed,this additional fee will enable Gensler to staff the project for its duration,and provide an
additional two or three days per week of site visits to enable smooth completion of the project.
zsoo Broadway
Swre 300
Santa Monica CalifOmia 9 0 4 0 4
Tel-310 449 5600
Allen Smoot • •
August 20, 1999
Page 2
Gensler
If you concur with this request,even though formal approval will not occur until September,a letter
indicating tentative approval will allow us to increase our CA efforts immediately. Gensler hopes you
will favorably support our request for additional fees. If you have any questions,please call me at
310-449-5762.
Sin ly,
rank
Associate
PC:bg
Enclosures
c: Ron Steinert
Ellen Wright
..wssoo9 ox6bxu�mlwmi�raalcn:.looma>�ex
z5oo Broadway
$nice;oo
&II&I Moniro California 9 0 4 o q
lel: 310 499. 5600
Fix 10 . a Qcr
LIST OF ADDITIONAL WORK NOT INCLUDED IN GENSLER,S ORIGINAL SCOPE OF WORK
Gensler's and LRM time only,
Bulletin # 25 16 Hr Submittal Sadleback Waterproofing 16 Hr Review time
16 Hr 2 Trips
Bulletin # 24 A 4 Hr Submittal Birdair Tensile roof 32 Hr Review time
24 Hr 3 Trips
Bulletin # 24 40 Hr Submittal EPDM waterproofing 16 Hr Review time
Bulletin # 23 A 16 Hr Submittal Ant.Holdrm.Door 18 Hr Meetings&
16 Hr 2 Trips
Bulletin # 22 6 Hr Submittal GPRC 16 Hr Review tine sub.
canceled
Bulletin # 20 4 Hr Submittal Jetway 16 Hr Review time
8 Hr 1 Trip
Bulletin # 19 8 Hr Submittal Carpet seams exist terminal 18 Hr Review time gen.
by Bulletin#12
Bulletin # 18 24 Hr TOTAL 196 Hr
Bulletin # 14 8 Hr
Bulletin # 13A 4 W
Bulletin # 13 8 Hr
Bulletin # 12 A 6 Hr
Bulletin # 12 16 Hr
Bulletin # 11 16 Hr
TOTAL 176 Hr
Total 176+196-372 Hr Q 125 Total Fee for additional services by Gensler requested is S 46 5W
Add additional agreed Fee to LRM for Bulletin#24 $ 1 000
LRM letter dated August 11,1999 is requesting additional compensation for
Task 3.services of(see attached copy of LRM letter) $ 1300
TOTAL $ 48 800
Requested amount for additional services will adequately support project to the end and will enable me to
spend Mays Q week on site.
August 19,1999
= MAY-08-99 THU 08402 AM MP PRINGS AIRPORT w .__FAX N0��760 4308
va>ooisa •is:to �Al U o �i.R Y ft9 + B 61041
• taMtal>s
u�•
m elo�seoaNm�leN s f `7do
Q�
OV
Gaaekr $pFee�paiis(31Q)449�•,5854 �� _
2500B nbAV,Sai0e3W ®adU.&MA
SsagaMona�.Ca�Eom�:9090A•
A FseakCZllld f�b �gq '
Hw PALM GWADCF'MPHAWU& to
DeaeFmole
Smmid wt be Malawi ID tW&- aar*wib s V f mmpocft ahe added a &ma ph=
roposedbY&Cypoog�i>}MGSmoaCaktEerofApc816,plmseatddtBMm
Qwfieefa x isl�g8,sdt (pbamuingsad olt)
LAW116ACE
7UammacdwOatItl8Ct�1 `91A� bC ,tT.n.R�eW�j'1��1ED�le Bl
'muNg f(IG!> eda0�w�llNliPO di[ffiC90geetipl9@QijICCQ$I11�psa�....�• A�:C0�0�
SM2anqumaedfarcanuuea=ca tedmit a�
A Y l a•% 1•.SaaiE'AA'C�d�OlAAP1�.
1.AARIN$ LUL
pa"rot Kate 76" g
TO l
• Brfolttte,FA3IA
Y
a~ Atg
ff�o�-
214.51111.1
vM1xale•e0s•tsle
u e1HIbI eM a a e.D A I VC e.r ITY.r y■I as M I•.*a 1111
• • •LANDSCAPE•ARCHTtECTURE LRM•LTO
E RCEIVED LICENSE•117.
�`
AUS 1210
August 11, 1999 GENSLER
Gensler By facsimile(310)449-5600
2500 Broadway,Suite 306 and US Mail
Santa Monica,CA 90404
Attention: Frank Chlad
Re: PALM SPRINGS AIRPORT-PHASE IIA
05.009.026
Dear Frank.
I am writing in regards to the anticipated start of the landscape installation(approximately two
weeks from now)- Over the past year, the $2,200 fee allocated for Task 3 (construction
contract administration) in our August 1997 proposal, has been expended in our in-office
L A W R E N C E support of the project, and nursery visits. (Labor charge for actual hours spent amounts to
$2,690.89.)
REED•MOLINE
The proposal indicates a commitment of three site visits, which I estimate will consume 15
hours of on-site time, and 2 hours in-office time. It is our request that consideration be given
to an additional fee request of$1,300 for Task 3.
D A V I 0 • K A Labor and Expense Analysis of expended labor is provided for review and justification.
L A R K I N S
Yours truly,
4ident
LRK
wrence R. oline,FASLA ,
LRM:tli
cc:accounting
enclosure:Labor and Expense Analysis-Summary
310 . 568 . 8900
FAX 310 670 1418
LRN, LTD.
5807 yplyder Way
Culver City, CA 9080
(310) 568-8900,
Labor and Expense Analysis - Summary Page: 1
.................................... Time: 02:28 PH
Print Date: 08/11/99
Report Date: 08/11/99
1536 : Pats Sprites Airport - Phase IIA
Reactivation of Project (1977)
GA : Genstar
25M Broad W
Suite 300
Santa Nonics, CA 90404-3062
310/449-5600
Project Nwger: Lawrence R. Moline Profit Canter:
Contract Typo: 4 Phased Fixed Fee Project Type: AIRPORT
Contract Amount: 5400.00
Reporting Period: 07/05/99 to 08/01/99
Year-To-Date: 01/01/99 to 06/01/99
Project-To-Dete: 08/14/97 to 08/01/99 Potential Bittabls
---------------------------------------------------------------------------------------------------------------------
LABOR Reporting Period Year-To-Date Project-To-Date
-------- -------------------- -------------'------ --------------------
Houvt Charge Hours Charge Haws Charge
Des Dwlpmt/Constr Docote
Niacallanaous 0.00 0.00 0.00 0.00 2.25 201.75
Ntgs-Clisnt/ArcAitect 0.00 0.00 0.00 0.00 1.50 180.00
Correspo denea/Tetephome 0.00 0.00 0.00 0.00 2.75 284.50
Drafting 0.00 0.qO 0.00 0.00 16.00 960.00
Designing 0.00 0.00 0.00 0.00 8.25 773.89
Irrigation 0.00 0.00 0.00 0.00 5.00 372.50
Specifications 0.00 0.00 0.00 0.00 3.25 242.13
In-Office Design Hastings 0.00 0.00 0.00 0.00 2.75 270.00
Prins/Submittals Shipping 0.00 0.00 0.00 0.00 2.25 142.25
In-Office No Rw(ew 0.00 0.00 0.00 0.00 10.25 922.88
Researeh/Anatysis 0.00 0.00 0.00 0.00 3.00 246.25
Labor and Expense Analysis - Summar• • Page: 2
1336 i Palm Spring$ Airport - Phase IIA 08/11/99
Reactivation of Project (1977)
LABOR Reporting Period Year-To-Date Project-TO-Date
-------- -------------------- ...........'-------- --.-..._------------
%ours Charge Hours Charge Hours Charge
-------- ---------- ........ -'-------- ........ ----------
CAD Drafting 0.00 0.00 0.00 0.00 1.50 72.00
-------- ------'--- ........ ---------- -------- ----------
Des Devtpmt/Constr DoaRs 0.00 0.00 0.00 0.00 58.75 4668.14
Constr. Administration
Hiseellensous 0.00 0.00 0.00 0.00 0.25 20.00
Correspondence/Telaphane 1.75 139.38 8.OD 678.13 12.25 1078.13
Nursery Visits 0.00 0.00 3.00 240.00 4.75 380.00
In-Office Design Hastings 0.00 0.00 0.75 61.75 0.75 61.75
Pmts/Sibmittats Shipping 0.00 0.00 7.00 579.88 12.25 999.88
In-Office Dwg Review 0.00 0.00 0.00 0.00 0.50 40.00
Resarch/Anslysis 0.00 0.00 1.75 111.13 1.75 111.13
-------- ---------- -------- ---------- -------- ----------
Constr. Administration 1.75 139.36 20.50 1670.89 32.50 2690.89
s� �CYYCY¢ vra�vs Y6�CYIIs
Totat 1.75 139.38 20.50 1670.89 91.25 7359.03
---•-----------------------------------------------------------------------------------------------------------------
EHPENSE Reporting Period Year-To-Date Project-To-Date
-------- -------------------- -----•-------------- --------------------
Charge Charge Charge
---------- ---------- ----------
Retetmeseble Expanses
Not Applicable 0.00 52.50 428.05
E46YTP tCYCtf� YYYYY
Total 0.00 52.50 426.05
---------------------------------------------------------------------------------------------------------------------
SUN ARY Reporting Period Year-To-Date Project-To-Date
-------- ------------------'- -------------------- --------------------
Hours Charge Hours Charge Hours Charge
........ .......... ........ .......... -------- ----------
Labor 1.75 139.38 20.50 1670.89 91.25 7359.03
Expense 0.00 52.50 428.05
Total 1.75 139.38 20.50 1723.39 91.25 7787.08
________________________________________________^__-__-.^.-_._._-.___-_-_-._--_--__.-------------------------------
MEMORANDUM �'��"�`�Q
DATE: September 10, 19"
TO: Assistant City Manager-Operations-AI Smoot
FROM: Office of the City Clerk
RE: Work Authorization,Airport Terminal Expansion,Gensler-
A2781
CC: File
Attached please find two copies of Work Authorization for Gensler for Task 3 of the
Expansio of the Airport Terminal Expansion,Phase 2A,A2781 approved by the City
ger on September 1, 1999 per M06473. We have retained our necessary copies.
Gr VA)C4,
Evelyn
cc: Finance
MINUTE ORDER NO.
APPROVING WORK DIRECTIVE NO. 27 WITH
AIRPORT ARCHITECT GENSLER FOR
ADDITIONAL TASK 3 REVIEW ACTIVITIES IN AN
AMOUNT OF$48,000, AGREEMENT#A2781.
I HEREBY CERTIFY that this Minute Oder, approving Work Directive No. 27 with
Airport Architect Gensler for additional Task 3 review activities in an amount of
$48,000, Agreement#A2781, was adopted by the City Council of the City of Palm
Springs, California, in a meeting thereof held on the 1"day of September, 1999.
PATRICIA A. SANDERS
City Clerk