HomeMy WebLinkAbout9/15/1999 - STAFF REPORTS (19) I
DATE: September 15, 1999
TO: City Council
FROM: City Engineer
CONSTRUCTION CHANGE ORDER NO. 2 TO TAPUZ ENTERPRISES, INC.
RECOMMENDATION:
That the City Council approve Construction Change Order No. 2 to Tapuz
Enterprises, Inc., for an increase of$14,018.80 for the Mid-Valley Parkway -
Phase 1, LaiWi*eImprovdrWmts, Clly"PRojedtN-. 95-38.
BACKGROUND:
On April 7, 19990 City Council of the City of Palm Springs awarded Tapuz
Enterprises, Inc. the contract for the Mid-Valley Parkway - Phase 1, Landscape
Improvements Project.
Labor to re-trench for the 2 in. and 2 'fi in. purple irrigation pipe is due to the
delay for the re-design and council approval of the proposed 1 JA in.irrigation pipe
to the 2 hL and 2 % in. irrigation pipe. The work will be done by force account
per Caltrans Specifications.
The process for pressure testing the irrigation pipe from I 'h in. to 2 in. and 2 'A
in. will result in an increased in labor. Typically, to pressure test the proposed 1
'h in. irrigation line, it would have taken 1 hr. Due to the increase in pipe sizes,
the pressure tests will take 3 hrs. The work will be done by farce account per
Caltrans Specifications.
Per the recommendation of the City's consulting Engineer,REP,and approved by
the Planning Division, the contractor to install 2 wood stakes with ties for each
Ocotillo tree 05 each)due to wind conditions.
Items C through G represent differences between actual cost and estimated cost
from C.C.O. No. 1
The estimated unit prices for the difference in pipe sizes in C.C.O. No. 1 were
lower than what the Contractor actually paid. The difference between the 1 'A in.
to 2 in. and 2 % in. are as follows:
Contractors C.C.O.1 C.C.O.1
Adwl Increase Increase C.C:.O.2
Cost Difrerawa Difference Diffuace
Unk Price Cost Breakdown:
1%in.Purple hr.Pipe per LF $0.6216
2 in.Purple Irr.tripe per LP $1.37 $0.7494 $0.15 $0.5964
2 l6 in.Purple Irr.tripe per LF $2.04 $1.4194 $0.48 $0.93U
NOTE: The Contractor has submitted invoices for all of the irrigation pipe sizes.
An adjustment of contract time(Contract Extension) will be made at a later date
between the City and the contractor, Tapuz Enterprises, Inc.
The net increase for this change order totals$14,018.80.
a �
Consruction Change Order to Tapuz, CP#95-38
September 15, 1999
Page 2 of 2
Funds are available in account number 134-4497-50113 ( did-Valley Parkway
Phase1)N
DAVID L BARA
cur Engineer
APPROVED:
4Cier
Attachment: Minute Order
Change Order No. 2
b r
CITY OF PALM SPRINGS
CONTRACT CHANGE ORDER
To: Tom Entrpdses.IN, Date: Seplember2.1999
P.O.Box 18500 Project N04 C.P.95-38
Encino,CA 9141"500 Project Name'.Mid-Vdev Parkwav-
Plmse 1 Landscape Improvements
Chimp Order No.:Two f21
AWL Tomer Rotbolz Contact Purchase No.; 906485
Account Npmber(s):1497-60113
A.CHANGES W WORK:
Increase to Conlrad New Items:
Item Desorption
No.
A Retrench for 2 in.and 2%In t►ipalon Pipe
B WaiarPressureTeeft
C 2 in.txipalion Pipe
D 2 3S In.kdpdon Pipe
E Markup for 2 in.and 2%In.krellon Pipe
F Labor Swdwpe
G Markup for Labor
H Tree Staft
Decreases to C.C.O.No.t
Item Descr"on
No.
E-1 Superintarxlerd
E 2 Foremen
E3 Labor
F Markup
S.CHANGES IN CONTRACT COST:
Item Desatplim
No.
A Retrench for 2 in.and 2%in Inipallon Pipe
Super 12 Hrs.!$MAO $ 443AO
Foreman 20 Ws.6$31.76 $ 635.20
Labor 140 Mrs.Q$2722 $ 3,810AD
Labor Surdarpe $4,88 M a 14% $ 684.58
Labor Markup $5,574AS Q 24% $ 1,337W
Equipment/TrsfdaCw" UanpSum $ 1.351.38
Markup for Equipment f Ttaf6c Control $7,351.3E Q 15% S 202.70
Sub-Told $ 8,4WAI
B Water Pressure Tesdnp a
Supertrtendent 2 I*s.®$35A $ 73.98
Foreman 2 Hm!$31.70 $ 83.52
Labor 4 Ws.®$2722 $ 108.88
Labor Surdrarge $246.38 Q 14% $ 34.49
Labor Markup S280.87 a 24% S 67AI
Sub-Total $ U828
C 2 in.krigadon Pipe 2,000 LF a$0.59E4 $ 1,19520
2 in.kn%adon Poe 3W LF®$0.7484 $ 224J2
D 2%in.h4adon Pipe 5,550 LF 0$0A" $ 5,Z08.12
E Markup for 2 in.and 214 in.Imp pion Pipe 6.029.44 015% $ 9N.42
F Labor Sprow9a $1,166.98 Q 14% $ 163.37
G Markup for Labor $163.37 Q 24% S 3921
SrbTottl $ 7,846.44
N Tree Staking
2 Wood Stakes with Tin per Tree $15.00 Q 85 Troea $ 1.275.00
Truck(2 Days) 16 Hm!$7.69 $ 123.04
MaWW&Equipment Markup $1,398.04 015% $ 207.71
Laborer for 2 Days(2 each) 32 Hrs.m 52722 $ 971.02
i y - - • •
September$1999
CRY Projed 9536 Mud-valley Parkway Phew 1,LandaxPe Improuromauls
Change Order No.2
Page 2 of 3
L CHANGES IN CONTRACT COST:
Rem Descriplim
No.
H Tree Staking(Consumm
Labor 8ucharge i871.04 014% $ 121 AS
Labor Markup $992.99 0 24% $ 238.32-
Sub-Total $ 2,837.04
Decreases to C.C.O.No.1
Rem Dsscripilm
No.
E-1 Superintendent 16 Hrs.!S38.99 ($ 591.84)
E 2 Foreman 24 Hrs-Q$31.76 ($ 762.24)
E3 Labor 112 Hm!$27.22 ($ 3,048.84)
F Markup $4AM72024% (S 1.056AR
Sub-Total (S 5AU-N7)
TOTAL NET CHANGE ORDER =$ 1 OIL80
Q REASON FOR CHANGE:
Labor to retrench for tins 2 in and 2%in Pails kdg m Pips is due to the M40W n of the proposed 1 X kr.
kriga0on pipe to the 2 ku. and 2 M in. k►igadoe pipe. The work Ad be done by force account per Cagrans
llone-
The Process for pressure tuft the krigadan pipe from 1 %in to 2 in and 2%in will resuR in an Increased In
krbor.Typk*,to pressure test the proposed 1 %kw.water line,R would haws taken 1 hr.Due to the kuaeaae
in pipe sizes, to pressure tests will take 3 bra. The work will be dons by force account per Calkare
Specifications.
Rem C Through G represent differences between actual coals and sstlmated cods from C.C.O.No.1.
r. ..
Per the roconunadsUon of the ClIft conuiWp Engineer, RBF, and approved by On Planning DWhion,the
coniractor to install 2 wood stakes wkh in for each OcoNo Tree(65 each).
The admated unit pries for the di(fwwm In pips sizes in C.C.O. No. 1 were loaner than what the Ce nbactor
actually Paid.The differaux between the I %In to 2 in and I %In to 2%in are as folowN
Conirack" C.C.O.1 COO No.1
Aclual Increase karease COO No.2
Un k Pike Cod Breakdown: Cod Dilferamrs: • DRfarawe: DGFererm
+• 1 %In Purple krigedon Pipe per LF $0.8216
2 in Purple krtg m Pipe per LF $1.37 $0.7484 $015 5On"
2 N in Purple knIgadon Pipe per LF $2.04 $1 A184 $OA8 $0A384
NOTE:The CoNrador has submtasd invoices for at of the kdgadon pipe sizes.
The Contractor will be given 25 add clonal waking days due to the rem of the krigelton pipe.
D,SOURCE OF FUNDS,
m&vaCey Parkway-Phase 1 m Acoount Number: 134-4497-50113 ■ $ 146018.80
Summanyof casts ContradTi ne
Original Contract Amount $538,740.76 Original Completion Date: Sept 1,1999
This Change OMa: $ 14,018.80 Days Added forthls C.C.O.: 25
Previous Change Order(sr $ 1s,858.88 Previous Days Added: 5
Revised Contract Amount $566.416.43 Revised Compls0on Dols: OcL 14,1999
L� •Z:y N • I
September 2,1999
City Prood"Mid-Way Parkway Phase 1,Landscape Improvements
Change Order No.2
Page 3 of 3
I have received a copy of gas Change Order and the City Approval:
above ESTIMATED PRICES for Items A&B and
agreed -for Items C-H are acceptable to the Submitted Data, /0
ODMUctqrj
By. APP
Title � �
�y v
Date ^�! Manag
DbUbutlon:
Odclnal Canksmed Coyies Conformed+Flle Coav
awineacin (1) E9 Fie (1)
Fkwnce (1) En&ewN Field Inspector (1)
Contractor (1) Enowering Field&Pwviw (1)
City Cork (1) Purdm*g Agent (1)
P.Jvr.1Ut_
APPROVE Y THE CITY
ON
91.5 �yOf
MINUTE ORDER NO. 6486
APPROVING CONSTRUCTION CHANGE
ORDER NO. 2 TO TAPUZ ENTERPRISES,
INC., FOR AN INCREASE OF $14,018.80
FOR THE MID-VALLEY PARKWAY
PHASE 1, LANDSCAPE IMPROVEMENTS,
CITY PROJECT NO. 95-58.
I HEREBY CERTIFY that this Minute Otder, approving Construction Change Order
No. 2 to Tapuz Enterprises, Inc., for an increase of $14,018.80 for the Mid-Valley
Parkway Phase 1, Landscape Improvements, City Project No. 95-38, was adopted by
the City Council of the City of Palm Springs, California, in a meeting thereof held on
the 15th day of September, 1999.
C]; jzu-x�
PATRICIA A. SANDERS
City Clerk