HomeMy WebLinkAbout9/15/1999 - STAFF REPORTS (19) I DATE: September 15, 1999 TO: City Council FROM: City Engineer CONSTRUCTION CHANGE ORDER NO. 2 TO TAPUZ ENTERPRISES, INC. RECOMMENDATION: That the City Council approve Construction Change Order No. 2 to Tapuz Enterprises, Inc., for an increase of$14,018.80 for the Mid-Valley Parkway - Phase 1, LaiWi*eImprovdrWmts, Clly"PRojedtN-. 95-38. BACKGROUND: On April 7, 19990 City Council of the City of Palm Springs awarded Tapuz Enterprises, Inc. the contract for the Mid-Valley Parkway - Phase 1, Landscape Improvements Project. Labor to re-trench for the 2 in. and 2 'fi in. purple irrigation pipe is due to the delay for the re-design and council approval of the proposed 1 JA in.irrigation pipe to the 2 hL and 2 % in. irrigation pipe. The work will be done by force account per Caltrans Specifications. The process for pressure testing the irrigation pipe from I 'h in. to 2 in. and 2 'A in. will result in an increased in labor. Typically, to pressure test the proposed 1 'h in. irrigation line, it would have taken 1 hr. Due to the increase in pipe sizes, the pressure tests will take 3 hrs. The work will be done by farce account per Caltrans Specifications. Per the recommendation of the City's consulting Engineer,REP,and approved by the Planning Division, the contractor to install 2 wood stakes with ties for each Ocotillo tree 05 each)due to wind conditions. Items C through G represent differences between actual cost and estimated cost from C.C.O. No. 1 The estimated unit prices for the difference in pipe sizes in C.C.O. No. 1 were lower than what the Contractor actually paid. The difference between the 1 'A in. to 2 in. and 2 % in. are as follows: Contractors C.C.O.1 C.C.O.1 Adwl Increase Increase C.C:.O.2 Cost Difrerawa Difference Diffuace Unk Price Cost Breakdown: 1%in.Purple hr.Pipe per LF $0.6216 2 in.Purple Irr.tripe per LP $1.37 $0.7494 $0.15 $0.5964 2 l6 in.Purple Irr.tripe per LF $2.04 $1.4194 $0.48 $0.93U NOTE: The Contractor has submitted invoices for all of the irrigation pipe sizes. An adjustment of contract time(Contract Extension) will be made at a later date between the City and the contractor, Tapuz Enterprises, Inc. The net increase for this change order totals$14,018.80. a � Consruction Change Order to Tapuz, CP#95-38 September 15, 1999 Page 2 of 2 Funds are available in account number 134-4497-50113 ( did-Valley Parkway Phase1)N DAVID L BARA cur Engineer APPROVED: 4Cier Attachment: Minute Order Change Order No. 2 b r CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: Tom Entrpdses.IN, Date: Seplember2.1999 P.O.Box 18500 Project N04 C.P.95-38 Encino,CA 9141"500 Project Name'.Mid-Vdev Parkwav- Plmse 1 Landscape Improvements Chimp Order No.:Two f21 AWL Tomer Rotbolz Contact Purchase No.; 906485 Account Npmber(s):1497-60113 A.CHANGES W WORK: Increase to Conlrad New Items: Item Desorption No. A Retrench for 2 in.and 2%In t►ipalon Pipe B WaiarPressureTeeft C 2 in.txipalion Pipe D 2 3S In.kdpdon Pipe E Markup for 2 in.and 2%In.krellon Pipe F Labor Swdwpe G Markup for Labor H Tree Staft Decreases to C.C.O.No.t Item Descr"on No. E-1 Superintarxlerd E 2 Foremen E3 Labor F Markup S.CHANGES IN CONTRACT COST: Item Desatplim No. A Retrench for 2 in.and 2%in Inipallon Pipe Super 12 Hrs.!$MAO $ 443AO Foreman 20 Ws.6$31.76 $ 635.20 Labor 140 Mrs.Q$2722 $ 3,810AD Labor Surdarpe $4,88 M a 14% $ 684.58 Labor Markup $5,574AS Q 24% $ 1,337W Equipment/TrsfdaCw" UanpSum $ 1.351.38 Markup for Equipment f Ttaf6c Control $7,351.3E Q 15% S 202.70 Sub-Told $ 8,4WAI B Water Pressure Tesdnp a Supertrtendent 2 I*s.®$35A $ 73.98 Foreman 2 Hm!$31.70 $ 83.52 Labor 4 Ws.®$2722 $ 108.88 Labor Surdrarge $246.38 Q 14% $ 34.49 Labor Markup S280.87 a 24% S 67AI Sub-Total $ U828 C 2 in.krigadon Pipe 2,000 LF a$0.59E4 $ 1,19520 2 in.kn%adon Poe 3W LF®$0.7484 $ 224J2 D 2%in.h4adon Pipe 5,550 LF 0$0A" $ 5,Z08.12 E Markup for 2 in.and 214 in.Imp pion Pipe 6.029.44 015% $ 9N.42 F Labor Sprow9a $1,166.98 Q 14% $ 163.37 G Markup for Labor $163.37 Q 24% S 3921 SrbTottl $ 7,846.44 N Tree Staking 2 Wood Stakes with Tin per Tree $15.00 Q 85 Troea $ 1.275.00 Truck(2 Days) 16 Hm!$7.69 $ 123.04 MaWW&Equipment Markup $1,398.04 015% $ 207.71 Laborer for 2 Days(2 each) 32 Hrs.m 52722 $ 971.02 i y - - • • September$1999 CRY Projed 9536 Mud-valley Parkway Phew 1,LandaxPe Improuromauls Change Order No.2 Page 2 of 3 L CHANGES IN CONTRACT COST: Rem Descriplim No. H Tree Staking(Consumm Labor 8ucharge i871.04 014% $ 121 AS Labor Markup $992.99 0 24% $ 238.32- Sub-Total $ 2,837.04 Decreases to C.C.O.No.1 Rem Dsscripilm No. E-1 Superintendent 16 Hrs.!S38.99 ($ 591.84) E 2 Foreman 24 Hrs-Q$31.76 ($ 762.24) E3 Labor 112 Hm!$27.22 ($ 3,048.84) F Markup $4AM72024% (S 1.056AR Sub-Total (S 5AU-N7) TOTAL NET CHANGE ORDER =$ 1 OIL80 Q REASON FOR CHANGE: Labor to retrench for tins 2 in and 2%in Pails kdg m Pips is due to the M40W n of the proposed 1 X kr. kriga0on pipe to the 2 ku. and 2 M in. k►igadoe pipe. The work Ad be done by force account per Cagrans llone- The Process for pressure tuft the krigadan pipe from 1 %in to 2 in and 2%in will resuR in an Increased In krbor.Typk*,to pressure test the proposed 1 %kw.water line,R would haws taken 1 hr.Due to the kuaeaae in pipe sizes, to pressure tests will take 3 bra. The work will be dons by force account per Calkare Specifications. Rem C Through G represent differences between actual coals and sstlmated cods from C.C.O.No.1. r. .. Per the roconunadsUon of the ClIft conuiWp Engineer, RBF, and approved by On Planning DWhion,the coniractor to install 2 wood stakes wkh in for each OcoNo Tree(65 each). The admated unit pries for the di(fwwm In pips sizes in C.C.O. No. 1 were loaner than what the Ce nbactor actually Paid.The differaux between the I %In to 2 in and I %In to 2%in are as folowN Conirack" C.C.O.1 COO No.1 Aclual Increase karease COO No.2 Un k Pike Cod Breakdown: Cod Dilferamrs: • DRfarawe: DGFererm +• 1 %In Purple krigedon Pipe per LF $0.8216 2 in Purple krtg m Pipe per LF $1.37 $0.7484 $015 5On" 2 N in Purple knIgadon Pipe per LF $2.04 $1 A184 $OA8 $0A384 NOTE:The CoNrador has submtasd invoices for at of the kdgadon pipe sizes. The Contractor will be given 25 add clonal waking days due to the rem of the krigelton pipe. D,SOURCE OF FUNDS, m&vaCey Parkway-Phase 1 m Acoount Number: 134-4497-50113 ■ $ 146018.80 Summanyof casts ContradTi ne Original Contract Amount $538,740.76 Original Completion Date: Sept 1,1999 This Change OMa: $ 14,018.80 Days Added forthls C.C.O.: 25 Previous Change Order(sr $ 1s,858.88 Previous Days Added: 5 Revised Contract Amount $566.416.43 Revised Compls0on Dols: OcL 14,1999 L� •Z:y N • I September 2,1999 City Prood"Mid-Way Parkway Phase 1,Landscape Improvements Change Order No.2 Page 3 of 3 I have received a copy of gas Change Order and the City Approval: above ESTIMATED PRICES for Items A&B and agreed -for Items C-H are acceptable to the Submitted Data, /0 ODMUctqrj By. APP Title � � �y v Date ^�! Manag DbUbutlon: Odclnal Canksmed Coyies Conformed+Flle Coav awineacin (1) E9 Fie (1) Fkwnce (1) En&ewN Field Inspector (1) Contractor (1) Enowering Field&Pwviw (1) City Cork (1) Purdm*g Agent (1) P.Jvr.1Ut_ APPROVE Y THE CITY ON 91.5 �yOf MINUTE ORDER NO. 6486 APPROVING CONSTRUCTION CHANGE ORDER NO. 2 TO TAPUZ ENTERPRISES, INC., FOR AN INCREASE OF $14,018.80 FOR THE MID-VALLEY PARKWAY PHASE 1, LANDSCAPE IMPROVEMENTS, CITY PROJECT NO. 95-58. I HEREBY CERTIFY that this Minute Otder, approving Construction Change Order No. 2 to Tapuz Enterprises, Inc., for an increase of $14,018.80 for the Mid-Valley Parkway Phase 1, Landscape Improvements, City Project No. 95-38, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 15th day of September, 1999. C]; jzu-x� PATRICIA A. SANDERS City Clerk -re, h