HomeMy WebLinkAbout9/15/1999 - STAFF REPORTS (14) r DATE: September 15, 1999 TO: City Council FROM: Landside & Security Supervisor and Deputy Di�. 'of Aviation - Admin. via Director of Aviation CHANGE ORDER FOR THE TAXI HOLDING FACILITY PROJECT NO. 9"7 RECOMMENDATION: That the City Council approve Change Order No. 1 with James E. Simon Co.,for site certification of the taxi holding facility at the Palm Springs International Airport for an amount not-to-exceed $17,150. BACKGROUND: The taxi/bus holding building project was divided into two parts;the vehicle staging and taxi paddng lot(including rough grading), and the actual building construction. I The separation of the two projects occurred because sufficient funding was not available for the entire project upon inception of the initial design. In separating these two projects,the full over excavation and site certification of the building pad was omitted from the scope of work. ' Change Order No.1 must now be incorporated into the building contract in order to proceed with the project. Funds are available in account no. 415-6400-56020; no general fund monies are necessary for this project. i A minute order is attached for City Council consideration. Bill Weaver any Landside &Security Supervisor Deputf DI -A min t , n _ I APPROVED: Jeri L. Riddle City Manager Director of Aviation Attachments: 1. Change Order 2. Minute Order rA PPROVED ECUNFII • I ' 11� �- CITY OF PALM SPRINGS PALM SPRINGS INTERNATIONAL AIRPORT CONSTRUCTION CHANGE ORDER To. James E. Simon Co. Date: September 15, 1999 P.O. Box 10990 Project No. City Project 99417 Indio, CA 92202 Project Name: TsA Holding Facility Change OrderAo. 1 Contract Purchase No. 906252 Attn: ATTN: Roger Wallentine Account No.416-6400-56020 Description of Chance to be Made: Related to the certification and over excavation of the building pad. 1. Over excavate building site per soils report recommendations 2. Soil testing and reports 3. Civil engineer surveying and dad certification 4. Construction water 5. 1 Contour grading and cleanup of site 6. Relocate existing severer dean-out 7. No cost permits are included In quote 8. Site pad srW surrounding area will be put back to finished grade Sunk of Costmme Original Contract Price $396,863.00 Total of all Previous Change Orders $0 Total of this Change Order $ 17,150.00 Total Contract Price $414,013.00 This Change Order increases the contract time by&worldng days. I have received a copy of this Change Order City Approval: and the above AGREED PRICES arse acceptable Submitted by. to the actor. D of Aviation r By Date: Title: Approved by: City manew Date: Data: Distribution: Oginal Conformed Copies Conformed-File Coot Airport (1) Purchasing Agent (1) City Clerk (1) Finanoe (1) James E. Simon Co. (1) i i • I 1 - MINUTE ORDER NO. 6484 APPROVING CHANGE ORDER NO.• 1 WITH JAMES E. SIMON CO., FOR SITE CERTIFICATION OF THE TAXI HOLDING FACILITY AT THE PALM SPRINGS INTERNATIONAL AIRPORT IN AN AMOUNT NOT TO EXCEED$17,150. 1 HEREBY CERTIFY that this Minute Order, approving Change Order No. 1 with James E. Simon Co., for site certification of the taxi holding facility at the Patin Springs International Airport in an amount not to exceed $17,150, was adopted by the City Council of the City of Patin Springs, Califonda, in a meeting thereof held on the 15th day of September, 1999. ATRICIA A. SANDERS City Clerk