HomeMy WebLinkAbout5/3/2000 - STAFF REPORTS (21) DATE: May 3, 2000
TO: City Council
FROM: Deputy Director of Aviation-Administration via Director of Aviation
CHANGE ORDER NO. 3 FOR AIP28 TERMINAL RAMP EXPANSION
RECOMMENDATION:
That the City Council approve final Change Order No. 3, to E. L. Yeager, Construction
Company,Inc.,forthe AIP26tenninal ramp expansion project In the amount of$50,602.85.
BACKGROUND:
Phase I IA Terminal Expansion at Palm Springs International Airport was built in conjunction
with a federally funded terminal ramp expansion project. The contractor was required to
use security fencing around the project site in order to maintain compliance with FAA
Security requirements. The security fencing had to be relocated during the transition to the
new terminal. Additionally, the contractor earned a 6% Percent Within Limits (PWL)
incentive Increase for meeting or exceeding FAA material standards. This incentive
amount,plus the additional unit costfar apron markings and security fencing resulted in the
final change order amount of$50,602.85.
Staff is requesting City Council approve this final change order for this project. Airport
Improvement Program (AIP) funding wiN cover 90% of the cost of the project, with the
remaining 10% covered by Airport matching funds. Funds are available in account no.
41"600-66029 AIP26 Ramp/Generator.
A proposed Minute Order is attached.
Y ,
Deputy m not Aviation-Administration
e0 Zak
HA OLD GOOD
Procurement Manager
JE L. RIDDLE
D r atio
5 Q�
I �DFP'COFFINANt,� /�
A19N F. OMWT,A.A.E.
Assistant City Manager-Development14
Approved:
City Manager
Attachme - (1) Minute Order
(1) Change Order
CHANGE ORDER NO.3 vr#40\
PRCPBC,'TTnTT.P,: ConsbudPordandCemextConccetePavement
Fdl-In Amtmd New Termmsl,&Wding
CTTX PROJECTNO. 99-06
FAA AlP PROJECT NOB. S-O"M 26
CONTRACT DATE June 3,1999
CONTRACTOR EI..Yeager Ca m&wdon,Inc.
The"ownV dmiges are hereby made to tie CanhsctDoc mraris:
1. bnaeme ftm quantib w for PM1 (A]L#I) 6% for Percent Wifldn Lents axxrdiW to
Camractor;P-620(Base Bid)Pavement Maldn&F-162(Base 6;Alt 1Y1)ktemove and Insba
TeatporaryFendng.See BxhidL attached
Jam:
1. P-5M(AIt#l)katease is the muk of the FAA's Pacm*WVkfn T&vits kwmftve Pmgaem�;
2. P-M(Base Bid)Pavement Mari ft axnases were redesigned,as gybed by the of port.
W enhance air caber pars ftsdety;
3. F-162(Base dr Alt#1)Remove and bnstaII Temporary Peking to erocommodaie snd wTedite
ah3tne occe psacy of areas improved.
CHANGE TO CONTRAC1 PRICE
oripwicm&adpdw $lA=m
CumtC=dtaictPdmasadjaWbypreviousdbwVordm: ftA2zmmu
The ConteactPdoe due to this Change Omder willbe hxxeasedby $,
The newContradPdm due to this Change Ordo rwinbe: $t W�90
CHAN(STOCONTRACTTM
The Cm*adTmmewiIIbekwmaodbq 0a&ndardoys.
A e deft forcompleffm
ofallSchedv&l work mierthe cmdradwmbe Februarys 20M
To be effect %this order mud be approved by the Sponsor ad the FAA if ff dwrSw the scope of the
objedmof the projeet,orm eammieeberegrdredurderdw ofthec4rdred
Regwsbedby deb 1 On
Mr.
Roeanm aided by daa Z/ &
ltaydrem 33 do C 7-7
Ordered by data
CayofPalm sprkv
Accep(ad by date
RS.Yesw canebrunom hrc
Approved by the FAA date
Palm Sprtnps lntemadonal Airport Exhibit No. 1 Project AIP 3.0"1814B
Construct Portland Cement Concrete Pavement MIn
Cons6uciton Cost Chanpe Order No.3
8e w&ft 1,BABE BID
Ilan No, Dssatpgon OAn* UOM Unit Cost Amount Qty Prev C11y Cmt Qly>b Date %cow Cost to Date
P-100 Mobl8zallon 1 LS 13MM 135,000 1.00 0.00 5.00 100.0% 13%OOD.00
P•1400 Asphalt arc POO Ranoval(Complete) 7,2D0 BY 7.00 50,400 7.104.40 0.00 7,104.40 100.0% 49,730.80
P-140b Asphalt Removal(Partld for Butt Joint) 126 BY 3.00 376 0.00 0.00 100.0% 0.00
P-1400 Canasta Removal(Complete) 575 8Y I&00 8,826 553.13 0.00 55313 iD0.0% 8,2WO
P•152 Unolesslfled EX=VWon 3.600 CY 9.0D 31,5DO 3.500.00 0,00 300.00 100.0% 31,500.00
P 209 CroshedAggregate Bass Course 1,600 CY 25:00 37,5D0 1,429.43 0.00 1,429.23 100.0% 35.730.76
P401a Plant Aix Bltumlnous Pavement 16 TON 150.00 2,260 15.00 0.00 56.00 100.0% 2AM00
P 401b Blturnleous Materiel(AR-WM 1 TON i60.00 150 1.W 0.00 1,00 100.0% ISMOD
P45010 14-larch PorBsod Cemerd Concrete Faven 240 8Y 85.00 18,820 283.63 0.00 283,83 100.0% 19035.84
P-WIb 10-hrch Portland Cement Concrete Pavers 8,860 8Y 50.00 510,350 SAM40 0.00 SA75.40 1004% 505018.80
P4303 B1lnmlrmhn Teak Cast 10 GAL 5.00 50 5.00 0.00 6.00 i00,0% 25.00
P4310a Install TypeA1-8 Vertical Curb 126 LF 25.00 3,125 124.00 0.00 124.00 100.0% 311W.00
P6810b Install Sdnoh Me Daly SO Bogard(FurrW 80 EA 200.W 12,000 92.00 0.00 92.00 100.0% 18,400.00
P4310o Install 4-Inch Din Steel Bollard ISO EA 300.00 46,0D0 95.00 0.00 96.00 10D.0% 28,600.00
P-010d Instffi Swilwy Sawa Clamour,Frems, C 1 FA WO.W 500 1,00 0.00 1.00 100A% 500.00
P-010e Remora Water Valve Concrete Pad and P 8 EA 800.00 1,800 7.00 0.00 7.00 100.0% 2,100.00
P-010f A*d Ehdasng Electrical Vault 12 EA 800.00 9,000 18.00 0.00 18.00 100.0% 14,400.00
P-810g AdJust Exis5ng Manhole(Storm Drain,So 8 EA 800.00 3,800 7.00 0.00 7.00 IWM% 4,200.OD
P412Wn Apron Tandway Pavement Mer" 2,600 BF 1.75 4,375 8,480.70 0.00 8,489.70 100.096 14.821.98
P-02Ob Apron Taxiway Pavement AAaldng Remo 2,0DD 8F 1.65 3,3W 2,3i2.60 O.DO 2,312.50 100.00A 3,815.03
T-902 Dud Faillellve 3 Aa 650.00 5,850 0.00 0.00 100.0% 0.00
F-182a Remove Temporary Chaln-Link Faroe, Ira 350 IF 6.00 2.100 1,678.00 0.00 1,878.OD 100A% 11,286.00
F182b Install Temporary Chafr[dlnk Fence,lndu 450 IF 21.00 9.450 1.104.00 0.00 1,184.00 1004% 24ACKOD
L Zft Install Afroratt(#ohandng Electrodes 18 EA 200.00 SAW 0.00 0.00 0.00 100.0% 0.00
185W Install Floodlight Poles and Fb*m 8 EA 12, MOO 78` 8.00 8,00 100.0% 76.0WM
Totd Ed.L. d Cost-BABE BD W7,820 988,888.64
fib rAA2012WA.Ch np CderNa3, PageW. dated:40MG
Palm Springs httema8onlrl Airport Exhibit No. 1 Project AIP 3-06-018149
Conslnat Poritartd Cement Concrete Pavement Erin
Cons6=111on Cost Change Order No.3
AlbrmRe No.One
Rene No. Dasalpllon Quatntily UOM Urdt Cost Amount O*Prey Qty Cmt Qlv to Deb %Cmp1t Cost 10 Deb
P-100 Mobilization 1 LS 8AW.00 8,000 1.00 0.00 1.00 100.0% B4O00 00
P-440m Asphalt and PCC Removal(Complete) 4,760 6Y 7.00 33,4M 4.700.00 0.00 4,700.09 100.0% 32,90DA3
P-140b Asphalt Removal(Partial for Bolt Jolrntj 725 SY 3.00 2,175 570.67 0.00 570.67 100.0% 1.712.01
P-Mo Cmrde Removat(Complete) e0 Sy lam 900 60.00 0.00 00.00 100.0% 900.0D
13-152 LWassltied ExcewaHon 2,000 Cy 0.00 18,000 1,952.75 0.00 IMM76 100.0% 17,574.75
P-M Crushed Aggregate Base Course 1,350 CY 25.00 33,750 1,301.89 0.00 1,301.83 100.0% 32,845.78
12401a PWAMN Blturrdmous Pavemart es TON MOD 12.730 140AS 0.00 140.63 100.0% 21,124.50
P40lb Blhrnlnous Material(AR-Boob) a TON 160.00 900 a w 0.00 0.90 100.0% 1,03&15
P4101a 144 nah PorBand Cement Concnb Pwae 4,SW SY an 328,400 4,9W84 0.00 4*130.64 100.0% 337,9WA2
P41010 Remove ESdWnng ExpxeMm Joint SWUM 800 LF 12.00 9AW 722.00 0.00 722.00 100.0% 8,6e4.00
P4103 Eltumir aTaduCost 40 GAL &OD 200 20.00 0.00 20.00 100.0% loom
P-62ft Apm TWMW Pavement Markng 300 SF 1.73 525 3MOD 0.00 300.00 100.0% 525.00
P42M Apron Tmdway Pwen Marking Remor SOD SF 1.85 825 GW.00 0.00 wMw 100.0% 825.00
T4102 DuetPaBstive 2 Ap a50.00 1,100 0.00 0.00 0.00 100.0% 0.00
MCC Remove Temporary Chain-Lkdr Ferns, Ira 160 LF 0.00 900 442.00 0.00 442.00 100.0% 2,eW.00
F-162b lndd Temporary Chaln-link Fence, Indu 250 LF 21.00 %260 88s.00 0.00 MMOD 100.0% 18.166.00
UM ImslallAhcraft Gko rift Electrorks 4 EA 20MOO 800 0.00 0.00 0.00 100.0% 0.00
Total Eatlmabd Cost-ALTERNATE NO.ONE 465,825 484.M.31
Total EsftMW Cod-BABE BID ANDALTERNATE NO.ONE 1,4� 1,473,647.SG
Total Estimated Coat-BABE BD ANDALTERNATE NO.ONE -1.422,996.00
Change Order No.3,Amount Over Bid for Cwbad Close-out
aenaA2®PBTAAwce Oder No.3, PepRo$ deted:421A0
MINUTE ORDER NO.
APPROVING CHANGE ORDER NO. 3 TO E.L. YEAGER,
CONSTRUCTION COMPANY, INC. FOR ADDITIONAL UNIT
COSTS INCURRED FOR THE TERMINAL RAMP EXPANSION
PROJECT,AIP26, IN THE AMOUNT OF$50,802.85.
I HEREBY CERTIFY that this Minute Order approving Change Order No. 3 to E. L. Yeager
Construction Company, Inc., for additional unk costs incurred for the terminal ramp expansion
project,AIP26, in the amount of$50,602.85,was adopted by the City Council of the City of Palm
Springs, California, in a meeting thereof held on the 310 day of May, 2000.
Patricia A. Sanders
City Clerk