HomeMy WebLinkAbout5/3/2000 - STAFF REPORTS (18) DATE: May 3, 2000
TO. City Council
FROM: Operations&Communications Supervisor via Director of Aviation
AIRPORT RUNWAY EXTENSION PROJECT-CHANGE ORDER#5
RECOMMENDATION:
It is recommended that the City Council approve Change Order 05 (subject to FAA
approval)with E.L.Yeager Construction, Inc.for runway safety improvements in the
amount of$482,780.00.
BACKGROUND:
In January and February of this year,the Airport received three(3)runway incursion
reports from the Federal Aviation Administration (FAA) Air Traffic Control Tower
(ATCT). Runway Incursions are defined as any situation which forces an aircraft to
drastically alter direction. This safety Issue has long been a high-priority item for the
FAA and the aviation industry.
Due to the incursions and in accordance with FAA procedures,a Regional Incursion
Action Team (RIAT)was dispatched to Palm Springs International Airport(PSP)to
review the incidents and develop possible solutions to reduce the potential for future
incursions.The team recommended the following additions to the Airport:
• enhancedrunway/taxiwaymarkingstoreducethepotentialforrunwayincursions
as well as meet the most recent FAA standards. These markings consist of
updated runway holding position lines, taxiway centerline reconfiguration and
surface painted runway holding position markings.The updated markings have
been used successfully at other airports to reduce the potential for runway
incursions.
• the installaation of Elevated Runway Guard Lights(ERGLS),which will be installed
where taxiway'B'crosses runways 13Rl31L and 13L/31R. ERGLS are highly
visible alternate flashing,amber lights approximately 18'tall which are installed
adjacent to runway hold-short markings and signs. They further help to identify
the hold point for aircraft and vehicles prior to entering the runway environment
ERGLS have been used very successfully at otherairports to reduce the potential
for runway incursions.
In addition to the runway safety enhancements, this change order includes an
upgrade to the airfield emergency generator and an expansion of the airfield lighting
vault The extension of runway 13Rl31 L and other Improvements to the airfield have
exceeded the capacity of the existing emergency generator, as well as the physical
size limitations of the airfield lighting vault.
The agreement with E. L. Yeager for the extension of runway 13W31 L has funds
remaining.The FAA has verbally agreed to the provisions of this change order. We
expect a formal approval prior to the City Council meeting of May 3,2000.
Airport improvement Program(AIP)funding will cover 90%of the cost of the project,Q)9
with the remaining 10%covered by Airport matching funds. No general fund monles
will be used on this item. Funds are available in account#415-6600-56017.
AIRPORT RUNWAY EXTENSION PROJECT-CHANGE ORDER fib � k
May 3, 2000
Page Number 2
The Airport Commission has discussed this issue with staff on several occasions,and
wili take formal action at their regularly scheduled meeting of May 3, 2000.
APPROVED:
MIKE N WILLIAMS,A.A.E. U JERI L. RIDDLE
Operations&Communications Supervisor Director of Aviation
APPROVED:
Acting City Manager
Attachment 1. Minute Order
2. Change Order
ZWBffyGV0CS%00UNCUtM LYeWCO 5.ccrwpd
GRANGE ORDER NO.S
FROJBC,'T M'L.E: Construct Rmtway N=13W KvWnsim krindm ParaDel Taxiways
CPTY PROJBCrNO. 47 24 FAA AIF FROJSCf NOS. 3-WMK 22
CONTRACT DAM- Jenne 2,2996
CONTRAC.`MR: B.L.Yeager Cawtruc:lion,lnc.
The
ffiowInscheoges are
1 Ca Rmav 13R/3�1L Mad*V Blevate b s to
Civaxbw iso/moo-u;. aron at stanaaras per Advisorybo&Runways.For deW&see Attachment . Lights an Taoaway Or Hokilhnes at
2. Upgrade the Airfield Bmergenc3r Generator and Airfield Lighft Vault
AIL materials and hnsta stions shall conform, to both the change order hnstsllatim plans and
spedfications and all other ccaftactdoctments.
J»stacatican:
2. Completion and Update of the Runway marldngs we ss recommended by the FAA
Runway hncrosim Action Team. This item also R4)8es to Runway 23L./SIR to mahimin
Runway Guard Lighis�the fiffoaghout � at�d The instillation of Elevated
the Runway hrcrosiam Action Team. The Gkwd Runway Done as recommended on Tod by
`B"atbofit ays for ��v+iA he installed aau Taxiavap
busy kdMSSCHMS.
2 The E7ds of Rtnnwa Sll��omeded the mpacity
geafts or,as weA n the physicalsize of the lighting vault of the a ng eor&eki
CHANCE MO CONTRACT'PRICK
Or%kmlcmbvctl,ziw. g nra_ m
Current CaadxactPrke,es adjusted by previous change ordem:
The Ca itu ctPrice due to this Chime Order wiIlbe increased by:
The new Coa tcwtPrlae den to d&Change Order will be: $ •114MM
CHANCE TO CONTRACT MM
The Contract Time wtll be hnceeesed by One Hundred Twenty 4M)Calendar Days.The date for
completion of OR work under the conlrad wM be care hundred twenty(220)calendar days from
the'TVotice to Storr date.
Approvals Required:
To be effective,this order mast be Mwoved by the Sponsor and the FAA ff itcbeauges the scope
off of the projeM or as may odeawise be requmad under the temps of the Goa►tract
by metef—oo
Ra= m ended by d. Z M
t;tienr�, �
ordered by der.
CayefPshnSprit
Acoepted by dene
s.L.Yager c«,arueaay Inc—
Apptovedbytba1:AA date a1� 3
Attachment N&1 Q 4 Y
Patin Springs International Airport City Project No.97 24 AIP&06 181,22
CHANGE ORDER NO.5
Estimated Casts
Complete Runway Pavement Markings and Install Wevated Runway Guard Lights
Ran No Description unit Estimated Contract Amara
- auardty Unit Price
P-6200 Install MaAdrp(s)-Madout(2-costs) S.F. 64,600 M50 27,250.00
P4620d Install Markings)-Blackout(2-00818,Stendled) S.F. 16,500 M60 8=00
P-820e Install MwWng(s)-Hold Lines,Yallow(8tanciled) S.F. 5,300 1.50 7,960A0
P4W Install Markings)-Non-FAovement,Yellow(Stendlec S.F. 1,800 1.60 2,8W.W
P4Mb Bituminous(Contrast)Fog Seal-Modified 881H Gal. 4,200 260 10,500A0
P-820g Install Marking(s)-Runway,White(Stenciled) B.F. 23,600 M50 11,76000
P4" Install Markings)-Taxiway CL, Edge Lines, Edge Bi S.F. 23,300 Mao 11,MM00
P-M Install'31L"or 31R"STOP(an pavement)-white or Ea 9 3MOO 3,150.00
P-eM Remove Marking(s)-by Sandblasting andbr High Pr S.F. 7,200 200 %400.00
(induda dean-up end fog seal N requlrecq
L:101f Install 1-way 2"PVC Conduit(ran-pavement areas) LF 2,000 6.30 12,800A0
L-101g Install 1-way 2'PVC Condit(under shoulder pvmnt) LF 300 10.50 3,160.00
L-102e Install Cable in Conduit,Two 11b f18 5KV LF 61000 1.85 9,250A0
L-103m Install New Elevated RGL,Ind Base,Transformer Ea. 8 3,80100 30,400.00
L-103n Install Fbdure Number on LigM Base Ea 8 35A0 2MOD
L-104e Install New DF L43WY HPS Ea. 3 2,500.00 7,600.00
L-1049 Remove E dsling SIM and Base,Replace Pvmnt Ea 3 300.00 900.00
L-106 Install Spare(owner provided)Pull Bon EL 2 2,100.00 4,200.00
L-108b Vault Electrical Work is 1 1=00 1,22D.W
Total Ea6mated Cast 167,280.00
Remove and Replace Under-Capacity Emergency Generator and Modify Alrfteld Electrical Vault
Item No Description unfit Estimated Contract Amount
Unit Price
L-110a InsMll NewErnergencY Gowatorand Mody Vault L& 1 316,600.00
(Nobs esilmded 10 week delivery far gerwaim a k)
315AMOO
Total Estimated Cost Change Order Na S 0r7 00
MINUTE ORDER NO.
APPROVING CHANGE ORDER#5(SUBJECTTO
FAA APPROVAL) WITH E.L. YEAGER
CONSTRUCTION, INC. FOR RUNWAY SAFETY
IMPROVEMENTS IN THE AMOUNT OF
$482,780.00.
I HEREBY CERTIFY that this Minute Order approving Change Order#5
(subject to FAA Approval)with E.L.Yeager Construction Company, Inc.for
runway safety improvements in the amount of$482,780.00,was adopted by
the City Council of the City of Palm Springs,California,in a meeting thereof
held on the 31 day of May,2000.
PATRICIA A. SANDERS
City Clerk
� a