HomeMy WebLinkAboutPC Resolution _5004- Case 5.0957- CUP TTM 30745RESOLUTION NO. J- 1P
THE PLANNING COMMISSION OF THE CITY OF PALM SPRINGS,
CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL
CERTIFY THE FINAL ENVIRONMENTAL IMPACT REPORT AS
COMPLETE, ADOPTING THE STATEMENT OF FACTS &
FINDINGS, AND ADOPTING THE STATEMENT OF OVERRIDING
CONSIDERATIONS (CASE NO.5.0957-CUP) FOR A CONDITIONAL
USE PERMIT, ARCHITECTURAL APPROVAL AND TENTATIVE
PARCEL MAP 30745, DESTINATION RAMON, LLC., AN
APPLICATION BY ROTHBART DEVELOPMENT, LOCATED AT 5601
RAMON ROAD EAST, APN #680-170-025, ET. SEQ., ZONE M-1,
SECTION 20.
WHEREAS, the Rothbart Development (the "Applicant") has filed an application with the City
pursuant to Section 9402.00 for Conditional Use Permit 5.-0957-CUP, and Tentative Parcel Map
30745; and
WHEREAS, the proposed Conditional Use Permit and Tentative Parcel Map are considered a
"project" pursuant to the terms of the California Environmental Quality Act (CEQA), a Final
Environmental Impact Report (Final EIR) has been prepared for this Project, and the Draft EIR has
been distributed for public review and comment in accordance with CEQA. The Final EIR includes
the Draft EIR, comments and responses to the Draft EIR, Technical Appendix (including
Destination Ramon Air Quality and Noise Study, Phase I Environmental Site Assessment,
Geotechnical Engineering Investigation, Hydrology Study, Destination Ramon Traffic Impact
Study, Historical/Archeological Resources Survey Report, Biological Assessment and Impact
Analysis) Notice of Preparation and comments, agency correspondence and other miscellaneous
correspondence; and
WHEREAS, notice of a public hearing of the Planning Commission of the City of Palm Springs to
consider the applicant's applications for the project was given in accordance with applicable law;
and
WHEREAS, on March 24, 2004, public hearings on the Final EIR and project, respectively, for the
project were held by the Planning Commission in accordance with applicable law; and
WHEREAS, at the conclusion of its public hearing on March 24, 2004, the Planning Commission
recommended that the City Council certify the environmental impact report as complete, and that
the City Council adopt the mitigation monitoring program relating to Case 5.0957-CUP and
Tentative Parcel Map 30745; and
WHEREAS, the Planning Commission has carefully reviewed and considered all of the evidence
presented in connection with the hearing on the project, including but not limited to the staff report,
and all environmental data including the initial study, the Final Environmental Impact Report, and
all written and oral testimony presented and
THE PLANNING COMMISSION HEREBY FINDS AS FOLLOWS:
Sectionl :
Pursuant to CEQA, the Planning Commission finds that the Final EIR has been prepared
and completed in compliance with CEQA, and the State CEQA Guidelines, and the City's
CEQA Guidelines. The Final EIR has been completed in compliance with CEQA and the
Final EIR was presented to the Planning Commission and the Commission reviewed and
considered the information contained in the Final EIR prior to recommending that the City
Council approve the project. The Final EIR adequately addresses the general
environmental setting of the proposed Project, its significant environmental impacts, and
the alternatives and mitigation measures related to each significant environmental effect
for the proposed Project. The Planning Commission has independently reviewed and
considered the information contained in the Final EIR.
Section 2:
The Planning Commission has reviewed and analyzed information contained in the Final
EIR prior to taking action and recommends that the City Council certify the Final EIR as
complete. The Final EIR reflects the independent judgment of the Planning Commission.
The Planning Commission further adopts the Statement of Facts and Findings and are
attached as Exhibit A. The Planning Commission finds that the mitigation measures
identified in the Final EIR, are necessary to reduce or avoid significant impact and that
certain impacts, as identified in the Final EIR, impacts to air quality even with
implementation of all recommended mitigation measures, will remain significant and further
adopts the Statement of Overriding Considerations and are attached as Exhibit B.
Section 3:
By adoption of this resolution the Planning Commission recommends that the City Council
adopt the mitigation measures in the Final EIR for Case No 5.0957-CUP and Tentative
Parcel Map 30745.
NOW, THEREFORE, BE IT RESOLVED that, based upon the foregoing, the Planning
Commission recommends that the City Council certify the Final Environmental Impact
Report as complete and in conformity with CEQA, adopts the Statement of Facts &
Findings, and adopts the Statement of Overriding Considerations (Exhibits A & B) for
Case Number 5.0957-CUP and Tentative Parcel Map 30745.
ADOPTED this 24th day of March 2004.
AYES:
NOES: O
ABSENT:
ABSTAIN:
ATTEST: CITY OF PALM SPRINGS, CALIFORNIA
A LA. -
Plating Commission hairman Planning Cohmission Secretary
RESOLUTION NO. JOD
THE PLANNING COMMISSION OF THE CITY OF PALM SPRINGS,
CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL
CERTIFY THE FINAL ENVIRONMENTAL IMPACT REPORT AS
COMPLETE, ADOPTING THE STATEMENT OF FACTS &
FINDINGS, AND ADOPTING THE STATEMENT OF OVERRIDING
CONSIDERATIONS (CASE NO.5.0957-CUP) FORA CONDITIONAL
USE PERMIT, ARCHITECTURAL APPROVAL AND TENTATIVE
PARCEL MAP 30745, DESTINATION RAMON, LLC., AN
APPLICATION BY ROTHBART DEVELOPMENT, LOCATEDAT 5601
RAMON ROAD EAST, APN #680-170-025, ET. SEQ., ZONE M-1,
SECTION 20.
WHEREAS, the Rothbart Development (the "Applicant") has filed an application with the City
pursuant to Section 9402.00 for Conditional Use Permit 5.-0957-CUP, and Tentative Parcel Map
30745; and
WHEREAS, the proposed Conditional Use Permit and Tentative Parcel Map are considered a
"project" pursuant to the terms of the California Environmental Quality Act (CEQA), a Final
Environmental Impact Report (Final EIR) has been prepared for this Project, and the Draft EIR has
been distributed for public review and comment in accordance with CEQA. The Final EIR includes
the Draft EIR, comments and responses to the Draft EIR, Technical Appendix (including
Destination Ramon Air Quality and Noise Study, Phase I Environmental Site Assessment,
Geotechnical Engineering Investigation, Hydrology Study, Destination Ramon Traffic Impact
Study, Historical/Archeological Resources Survey Report, Biological Assessment and Impact
Analysis) Notice of Preparation and comments, agency correspondence and other miscellaneous
correspondence; and
WHEREAS, notice of a public hearing of the Planning Commission of the City of Palm Springs to
consider the applicant's applications for the project was given in accordance with applicable law;
and
WHEREAS, on March 24, 2004, public hearings on the Final EIR and project, respectively, for the
project were held by the Planning Commission in accordance with applicable law; and
WHEREAS, at the conclusion of its public hearing on March 24, 2004, the Planning Commission
recommended that the City Council certify the environmental impact report as complete, and that
the City Council adopt the mitigation monitoring program relating to Case 5.0957-CUP and
Tentative Parcel Map 30745; and
WHEREAS, the Planning Commission has carefully reviewed and considered all of the evidence
presented in connection with the hearing on the project, including but not limited to the staff report,
and all environmental data including the initial study, the Final Environmental Impact Report, and
all written and oral testimony presented and
THE PLANNING COMMISSION HEREBY FINDS AS FOLLOWS:
Section1:
Pursuant to CEQA, the Planning Commission finds that the Final EIR has been prepared
and completed in compliance with CEQA, and the State CEQA Guidelines, and the City's
CEQA Guidelines. The Final EIR has been completed in compliance with CEQA and the
Final EIR was presented to the Planning Commission and the Commission reviewed and
considered the information contained in the Final EIR prior to recommending that the City
Council approve the project. The Final EIR adequately addresses the general
environmental setting of the proposed Project, its significant environmental impacts, and
the alternatives and mitigation measures related to each significant environmental effect
for the proposed Project. The Planning Commission has independently reviewed and
considered the information contained in the Final EIR.
Section 2:
The Planning Commission has reviewed and analyzed information contained in the Final
EIR prior to taking action and recommends that the City Council certify the Final EIR as
complete. The Final EIR reflects the independent judgment of the Planning Commission.
The Planning Commission further adopts the Statement of Facts and Findings and are
attached as Exhibit A. The Planning Commission finds that the mitigation measures
identified in the Final EIR, are necessary to reduce or avoid significant impact and that
certain impacts, as identified in the Final EIR, impacts to air quality even with
implementation of all recommended mitigation measures, will remain significant and further
adopts the Statement of Overriding Considerations and are attached as Exhibit B.
Section 3:
By adoption of this resolution the Planning Commission recommends that the City Council
adopt the mitigation measures in the Final EIR for Case No 5.0957-CUP and Tentative
Parcel Map 30745.
p-4 NOW, THEREFORE, BE IT RESOLVED that, based upon the foregoing, the Planning
Commission recommends that the City Council certify the Final Environmental Impact
Report as complete and in conformity with CEQA, adopts the Statement of Facts &
Findings, and adopts the Statement of Overriding Considerations (Exhibits A & B) for
Case Number 5.0957-CUP and Tentative Parcel Map 30745.
ADOPTED this 24th day of March 2004.
AYES:
NOES:
ABSENT:
ABSTAIN:
ATTEST: CITY OF PALM SPRINGS, CALIFORNIA
Plating Commission hairman Planning COnmission Secretary